• Title/Summary/Keyword: Electrical Energy

Search Result 10,809, Processing Time 0.032 seconds

Circuit Component Requirements for Energy Scavenging System (Energy Scavenging 시스템을 위한 회로의 특성)

  • Kang, Sung-Muk;Park, Kyung-Jin;Kim, Ho-Seong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.10
    • /
    • pp.1790-1795
    • /
    • 2008
  • Energy scavenging is a technique that converts ambient energy, for example, vibration and light, to electrical energy in order to supply power to low power electronic devices such as ubiquitous sensors. In this paper, we propose an optimal operation condition of power delivery circuit and design strategy for energy scavenging system in which the generated power is order of microwatt and, consequently, efficient handling of power is critical. We also propose that high data transmission rate is more realistic optimal design objective rather than high energy efficiency. It is shown that disconnection of load from the storage capacitor right after data transmission reduces energy wasting and that optimal value of storage capacitor can be determined at this condition. The feasibility of our propose is proved by experiments and we believe that the proposed design strategy will promote the application of piezoelectric micropower generator to the ubiquitous sensor networks.

QoE-aware Energy Efficiency Maximization Based Joint User Access Selection and Power Allocation for Heterogeneous Network

  • Ji, Shiyu;Tang, Liangrui;Xu, Chen;Du, Shimo;Zhu, Jiajia;Hu, Hailin
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.10
    • /
    • pp.4680-4697
    • /
    • 2017
  • In future, since the user experience plays a more and more important role in the development of today's communication systems, quality of experience (QoE) becomes a widely used metric, which reflects the subjective experience of end users for wireless service. In addition, the energy efficiency is an increasingly important problem with the explosive growth in the amount of wireless terminals and nodes. Hence, a QoE-aware energy efficiency maximization based joint user access selection and power allocation approach is proposed to solve the problem. We transform the joint allocation process to an optimization of energy efficiency by establishing an energy efficiency model, and then the optimization problem is solved by chaotic clone immune algorithm (CCIA). Numerical simulation results indicate that the proposed algorithm can efficiently and reliably improve the QoE and ensure high energy efficiency of networks.

A Study on Generator Maintenance Scheduling Considering Renewable Energy Generators (신재생에너지 발전원을 고려한 발전기 예방정비계획수립에 관한 연구)

  • Lee, Yeonchan;Oh, Ungjin;Choi, Jaeseok;Jung, Myeunghoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.5
    • /
    • pp.601-610
    • /
    • 2018
  • The purpose of this paper is to establish a new optimum Generator Maintenance Scheduling(GMS) considering renewable energy generator. In this paper, the total renewable energy generation is estimated using hourly capacity factor of renewable energy generator. The GMS was optimized with the objective function of maximizing the minimum reserve rate, minimizing the probabilistic production cost, minimizing the loss of load expectation, and minimizing $CO_2$ emissions. In the case study of this paper, GMS considering renewable energy and GMS not considering renewable energy are shown by each objective function. And it shows scenarios of the reliability, the environmental and economical factors when two nuclear power plants inputted and ten coal thermal power plants shut downed respectively.

A Study on Electromagnetic Retarder's Power Recovery System and Regenerating Voltage Control (전자기형 리타더의 전력회수장치 및 회생전압제어에 대한 연구)

  • Jung, Sung-Chul;Ko, Jong-Sun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.8
    • /
    • pp.1207-1214
    • /
    • 2017
  • In the case of frequent braking, when driving downhill or long distance, conventional brakes using friction are problematic in braking safety due to brake rupture and fading phenomenon. Therefore auxiliary brakes is essential for heavy vehicles. And several research has been actively conducted to improve energy efficiency by regenerating mechanical energy into electric energy when the vehicles brake. In this paper, a voltage control method is utilized to recover the electric energy generated in the electromagnetic retarder instead of the eddy current. To regenerate the braking energy into the electrical energy, a resonant L-C circuit is configured in the retarder. The retarder can be modeled as self-excited induction generator due to its operating principle. The driving conditions according to the retarder's parameters are made into 3-D maps. Also, the voltage of the resonant circuit changing depending on the driving pulse applied to the FET was analyzed. For the control of this voltage, we proposed an algorithm using the PI controller. The controlled voltage is converted by a 3-phase AC/DC converter and then charged to a battery inside the heavy vehicles through a DC/DC converter. Electromagnetic retarder and its controller are validated using Matlab Simulink. We also demonstrate the voltage controller through the actual M-G set experiment.

Operation Plan of ESS for Increase of Acceptable Product of Renewable Energy to Power System (재생에너지의 전력계통 수용 증대를 위한 ESS 운영방안)

  • Kim, Yeong-Hwan;Myung, Ho-San;Kang, Nam-Ho;Lee, Chang-Woo;Kim, Min-Jae;Kim, Se-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1401-1407
    • /
    • 2018
  • This paper proposed a method of energy storage system (ESS) operation to increase acceptable production of renewable energy (RE). We analyzed the rebound effect that does not show a demand increase even if the capacity of the ESS is increased and considered the charging time by analyzing the time when the output limit is most generated. The rebound effect was mitigated by adjusting the discharging time of the ESS, and the effect of the increase of acceptable production of the renewable energy was analyzed by adjusting the charging time.

11-kV Series-Connected H-Bridge Multilevel Converter for Direct Grid Connection of Renewable Energy Systems

  • Islam, Md. Rabiul;Guo, Youguang;Zhu, Jian Guo
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.1 no.2
    • /
    • pp.70-78
    • /
    • 2012
  • Due to the variable nature of renewable energy resources and power demand by consumers, it is difficult to operate a power system installed with only one type of renewable energy resource. Grid-based renewable generation may be the only solution to overcome this problem. The conventional approach based on a low-voltage converter with power frequency transformer is commonly employed for grid connection of offshore renewable energy systems. Because of the heavy weight and large size of the transformer, the system can be expensive and complex in terms of installation and maintenance. In this paper, an 11-kV series connected H-bridge (SCHB) multilevel voltage source converter (VSC) is proposed to achieve a compact and light direct grid connection of renewable energy systems. This paper presents the design, simulation and analysis of a five level (5L)-SCHB and an eleven level (11L)-SCHB VSC for 11-kV grid-based renewable energy systems. The performance, cost, modulation scheme and harmonic spectra of the converter are analyzed.

A Development of GUI System for Optimal Operational Scheduling on Industrial Cogeneration Systems Using Evolutionary Algorithms (산업체 열병합발전시스템에서 최적운전계획 수립을 위한 진화 알고리즘을 이용한 GUI System 개발)

  • Jeong, Ji-Hoon;Lee, Jong-Beom
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.11
    • /
    • pp.544-550
    • /
    • 2002
  • This paper describes a strategy of a daily optimal operational scheduling on the industrial cogeneration system. The cogeneration system selected to establish the scheduling consists of three units and several auxiliary devices which include three auxiliary boilers, t재 waste boilers and three sludge incinerators. One unit generated electrical and thermal energy using the back pressure turbine. The other two units generate the energy using the extraction condensing turbine. Three auxiliary devices operate to supply energy to the loads with three units. The cogeneration system is able to supply enough the thermal energy to the thermal load, however it can not sufficiently supply the electric energy to the electrical load. Therefore the insufficient electric energy is compensated by buying electrical energy from utility. In this paper, the evolutionary algorithms was applied to establish the optimal scheduling for the cogeneration systems. Also the GUI System was developed using established mathematics medeling and evolutionary algorithms in order that non-experts are able to establish operational scheduling. This results revel that the proposed modeling and strategy can be effectively applied to cogeneration system for paper mill.

An Economic Assessment of Large-scale Battery Energy Storage Systems in the Energy-Shift Application to Korea Power System (장주기 대용량 전력저장장치의 부하이전에 대한 실계통 적용 경제성 평가 연구)

  • Park, Jong-Bae;Park, Yong-Gi;Roh, Jae-Hyung;Chang, Byung-Hoon;Toon, Yong-Beum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.3
    • /
    • pp.384-392
    • /
    • 2015
  • This paper presents an economic assessment of large-scale Li-ion battery energy storage systems applied to Korean power system. There are many applications of the battery energy storage systems (BESSs) and they can provide various benefits to power systems. We consider BESSs to the energy time-shift application to Korean power system and evaluate the benefits from the application of BESS in the social perspective. The mixed integer programming (MIP) algorithm is used to resolve the optimal operation schedule of the BESS. The social benefits can include the savings of the fuel cost from generating units, deferral effects of the generation capacity, delay of transmission and distribution infra construction, and incremental CO2 emission cost impacts, etc. The economic evaluation of the BESS is separately applied into Korean power systems of the Main-land and Jeju island to reflect the differences of the load and generation patterns.

Evaluation of the Wind Power Penetration Limit and Wind Energy Penetration in the Mongolian Central Power System

  • Ulam-Orgil, Ch.;Lee, Hye-Won;Kang, Yong-Cheol
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.6
    • /
    • pp.852-858
    • /
    • 2012
  • This paper describes evaluation results of the wind power penetration limit (WPPL) and the wind energy penetration (WEP) in the Mongolian central power system (MCPS). A wind power plant (WPP) in a power system possesses an output power limit because the power system must maintain a balance between the generation and consumption of electricity at all times in order to achieve an adequate level of quality. The instantaneous penetration limit (IPL) of wind generation at a load is determined as the minimum of the three technical constraints: the minimum output, the ramp rate capability, and the spinning reserve of the conventional generating units. In this paper, a WPPL is defined as the maximum IPL divided by the peak load. A maximal variation rate (VR) of wind power is a major factor in determining the IPL, WPPL, and WEP. This paper analyzes the effects of the maximal VR of wind power on the WPPL, WEP, and capacity factor (CF) in the MCPS. The results indicate that a small VR can facilitate a large amount of wind energy while maintaining a high CF with increased wind power penetration.

Resource Allocation for Relay-Aided Cooperative Systems Based on Multi-Objective Optimization

  • Wu, Runze;Zhu, Jiajia;Hu, Hailin;He, Yanhua;Tang, Liangrui
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.12 no.5
    • /
    • pp.2177-2193
    • /
    • 2018
  • This paper studies resource allocation schemes for the relay-aided cooperative system consisting of multiple source-destination pairs and decode-forward (DF) relays. Specially, relaying selection, multisubcarrier pairing and assignment, and power allocation are investigated jointly. We consider a combinatorial optimization problem on quality of experience (QoE) and energy consumption based on relay-aided cooperative system. For providing better QoE and lower energy consumption we formulate a multi-objective optimization problem to maximize the total mean opinion score (MOS) value and minimize the total power consumption. To this end, we employ the nondominated sorting genetic algorithm version II (NSGA-II) and obtain sets of Pareto optimal solutions. Specially, two formulas are devised for the optimal solutions of the multi-objective optimization problems with and without a service priority constraint. Moreover, simulation results show that the proposed schemes are superior to the existing ones.