• Title/Summary/Keyword: Electric railway systems

Search Result 210, Processing Time 0.024 seconds

The Feasibility Study of a Light Rail Transit Development (경량전철 개발에 따른 경제적 파급효과 분석 연구)

  • Nam, Doo-Hee;Lim, Kwan-Su;Lee, Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.119-124
    • /
    • 2010
  • Light rail is an electric railway system, characterized by its ability to operate single or multiple car consists (trains) along exclusive rights-of-way at ground level, on aerial structures, in subways or in streets, able to board and discharge passengers at station platforms or at street, track, or car-floor level and normally powered by overhead electrical wires. Depending upon the specific system, the light rail lends some major advantages to urban settings. The evaluation of light rail technology as a potential component of regional transit systems has been the subject of extensive studies throughout the country in the past decade. For the study, feasibility was defined as "the ability of an LRT system to achieve certain level of transportation market in comparison with other transportation alternatives." This paper describes the feasibility study to evaluate a proposed light rail development project. The minimum are those LRT systems that would met to make a project feasible for further evaluation.

Video Image Analysis in Accordance with Power Density of Arcing for Current Collection System in Electric Railway (전기철도 집전장치의 아크량에 따른 비디오 이미지 분석)

  • Park, Young;Lee, Kiwon;Park, Chulmin;Kim, Jae-Kwang;Jeon, Ahram;Kwon, Sam-Young;Cho, Yong Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.9
    • /
    • pp.1343-1347
    • /
    • 2013
  • This paper presents an analysis methods for current collection quality in catenary system by means of video image based monitoring system. Arcing is the sparking at the interface point between pantograph and contact wire when the electric trains have traction current values at speed. Percentage of arcing at maximum line speed is measurable parameters for compliance with the requirements on dynamic behaviour of the interface between pantograph and contact wire in accordance with requirement of IEC and EN standards. The arc detector and video is installed on a train aim at the trailing contact strip according to the travel direction. The arc detector presented and measured verity of value such as the duration and power density of each arc and the video image is measured a image when the arc is occurred in pantograph. In this paper we analysis of video image in accordance with power density of arcing from arc detector and compared with video image and power density of arcing so as to produce quality of arcing from image.

A Fault Detection Method for Solenoid Valves in Urban Railway Braking Systems Using Temperature-Effect-Compensated Electric Signals (도시철도차량 제동장치의 솔레노이드 밸브에 대한 전류기반 고장진단기법 개발)

  • Seo, Boseong;Lee, Guesuk;Jo, Soo-Ho;Oh, Hyunseok;Youn, Byeng D.
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.40 no.9
    • /
    • pp.835-842
    • /
    • 2016
  • In Korea, urban railway cars are typically maintained using the strategy of predictive maintenance. In an effort to overcome the limitations of the existing strategy, there is increased interest in adopting the condition-based maintenance strategy. In this study, a novel method is proposed to detect faults in the solenoid valves of the braking system in urban railway vehicles. We determined the key component (i.e., solenoid valve) that leads to braking system faults through the analysis of failure modes, effects, and criticality. Then, an equivalent circuit model was developed with the compensation of the temperature effect on solenoid coils. Finally, we presented how to detect faults with the equivalent circuit model and current signal measurements. To demonstrate the performance of the proposed method, we conducted a case study using real solenoid valves taken from urban railway vehicles. In summary, it was shown that the proposed method can be effective to detect faults in solenoid valves. We anticipate the outcome from this study can help secure the safety and reliability of urban railway vehicles.

Static Analysis of AT Feeding Systems considering the Limited Rise of Regenerative Voltage (회생 차량의 전압 상승 한도를 고려한 AT 급전시스템 정태해석)

  • Kim, B;Moon, Y.-H
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1322-1327
    • /
    • 2004
  • There are some previous studies that utilize constant impedance models or constant current models for electric trains to perform the static analysis of AT feeding systems. These mentioned models have some merits of linear systems but yield erroneous results because of the innate restraints of the models since linear models cannot represent the features of constant power in inverter-driven trains. From these reasons, it is suitable that the train be considered as a constant load model when it drives or as a constant source model when it applies regenerative brake. However, excessive rise of regenerative voltage during the braking may damage the vehicle itself and the feeding systems so the voltage must be restricted below a certain value. Keeping these facts in minds, we suggest new methods of analyzing AT feeding systems using the constant power models with the conditions of voltage constraints. The simulation results from a sample system using the proposed method illustrate both the states of system variables and the supply-demand relation of power among the trains and the systems very clearly, so it is believed that the proposed method yields more accurate results than conventional methods do.

  • PDF

Converter Control for APU of 8200 Series Electric Locomotive using Advanced Single Phase PLL Control Method (진보된 단상 PLL 제어방법을 이용한 8200호대 전기기관차 보조전원장치용 컨버터 제어)

  • Jung, No-Geon;Lee, Eul-Jae;Kim, Jae-Moon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.1
    • /
    • pp.211-215
    • /
    • 2017
  • The APF (All Pass Filter) method that utilizes the computational power of the controller is most commonly used. However, since the calculation of the filter coefficient is complicated, the calculation is carried out in advance. It is difficult to apply it to the frequency fluctuation environment because the coefficient value is fixed. In this paper, a new control method of single phase PLL that can be usefully used in PWM converter device for electric railway was explained. Comparison and examination of similarities and differences between the conventional APF method PLL controller method and the newly proposed modified MA filter method PLL technique were performed. The possibility of implementation of the modified MA filter method through computer simulation was analyzed. In conclusion, the method proposed as the conclusion was applied to the APU(Auxiliary Power System) of 8200 Series Electric Locomotive and its usefulness was confirmed.

A Study on the Improvement of Cooling Efficiency for EMU by Changing the Operation Method of Line Flow Fans and Door Opening Systems (전동차의 라인데리아 및 출입문 작동 방법 변화를 이용한 냉방 효율 향상에 관한 연구)

  • Oh, Jun-Gyu;Won, Si-Tae;Nam, Seong-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.94-99
    • /
    • 2011
  • EMU(Electric Multiple Unit) of Seoul Metro are equipped with air conditioning and six line flow fans for air circulation. In summer, the air conditioning and line flow fans usually work at the same time. Recently, high oil price leads more people to use public transportation, which in turn makes them feel hotter inside the rolling stocks and complain about air conditioning state. In order to improve indoor air quality in summer, it is inevitable to increase the cooling capacity of air conditioners, which costs a lot of money. Thus, we need to raise cooling efficiency by rearranging existing devices effectively. In this study, we found a better way to improve refreshment inside the trains by changing the operation method of line flow fans and door opening systems. The results will help improve the cooling efficiency of EMU in summer. Also, more precise experiments and analyses of our data can lead to various methods to increase energy efficiency.

  • PDF

A Study on the Improvement for EMU Maintenance System of Urban Transit (도시철도 전동차 유지보수체계의 개선에 관한 연구)

  • Kim, Kyu-Joong;Lee, Keun-Oh
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.87-92
    • /
    • 2010
  • Urban transit system must secure fast, safe and reliable transportation capacity as a metropolitan mass transit. For this purpose, it is important to make all the sub-systems (which consist of EMU, power feeding, signaling & telecommunication, railway, platform facility, and control system and so on) work well. To operate all the systems effectively and reliably, a maintenance measure optimal to each system's characteristics is needed to be established and executed. So, highly reliable maintenance should be performed. But, EMU maintenance methods suitable to its own model and EMU lines are not yet introduced. This study examined few examples mainly to secure reliability on a maintenance quality in operating method and the features of train maintenance system based on travel distance.

A Study on the application of new railroad transportation facilities (철도 신물류운송방식의 적용성 검토)

  • 방연근;문대섭;정병현
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.62-73
    • /
    • 2001
  • The scope of this study is focused on the survey of new logistics transportation systems in railroad and case studies of new systems such as piggyback system, bi-modal system swapbody, and double stack train(DST). Piggyback system, bi-modal system, swapbody, and double stack train are reviewed in term of technological validity and economic validity in Korea. Piggyback - trailer does pass loaded weight limits but does not pass train limits and can not utilize the existing freight cars. Piggyback - cargo trunk does pass all the criteria and could be developed by a domestic technology. But this study suggests to expand the length of train cars to 18.300mm for accommodation of two cargo trucks. Bi-modal system and swapbody do also pass. Double stack train could only pass the loaded weights and does not meet the train limit and the possibility of using existing freight cars. Domestic technology could not development DST, due to civil engineering construction limits and low standard height of electric line, which could not afford to operate DST.

  • PDF

A dP/dV Feedback-Controlled MPPT Method for Photovoltaic Power System Using II-SEPIC

  • Park, Han-Eol;Song, Joong-Ho
    • Journal of Power Electronics
    • /
    • v.9 no.4
    • /
    • pp.604-611
    • /
    • 2009
  • A dP/dV feedback-controlled MPPT (Maximum Power Point Tracking) method for photovoltaic power systems using II-SEPIC (Isolated Inverse-SEPIC; Single Ended Primary Inductance Converter) is presented and a current-mode dP/dV feedback-controlled MPPT method is devised to apply for the PV power converter system. A control strategy for the current-mode dP/dV feedback control system is developed in this paper and the proposed MPPT shows relatively satisfactory dynamics against rapidly changing insolation conditions. In order to verify the validity and effectiveness of the proposed method, simulations and experiments of the PV power system using II-SEPlC converter are performed. These simulation and experiment results show that the proposed method enables the PV power system to extract maximum power from the photovoltaic module against the solar insolation variation.

A Study on High Impedance Grounding Protection for DC Power Supply System (DC 급전계통 고저항 지락보호에 대한 연구)

  • Lee, Kuk-Myoung;Kim, Byung-Hyun;So, Sun-Young;Kim, Hak-Lyun
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.878-884
    • /
    • 2006
  • Grounding fault and short of the DC power supply systems are detected and protected by high-speed circuit breaker, linked breaking device, ground relay and fault selective device, all of which are installed and operated in substaions. however, there have been many cases in which the protective devices did not detect grounding of of the over head catenary systems on concrete support for an extended period of time. Such cases often cause severe damages to the supports with high grounding resistances. If grounding accidents occur repetitively, the earth current and the rise of earth potential can damage not only passenger and staff but also electric facilities and equipment, necessitating high cost and endeavor to restore. The following study points out various problems that can be occurred occur as a result of high impedance grounding accident, and proposes a new system which can protect and intercept them.

  • PDF