• Title/Summary/Keyword: Electric power supply

Search Result 1,257, Processing Time 0.035 seconds

Electric Power Supply & Demand measures in korea (국내 전력수급 방안)

  • Lee, Ki-Seon
    • Journal of the Korean Professional Engineers Association
    • /
    • v.44 no.2
    • /
    • pp.29-33
    • /
    • 2011
  • In recent years, maximum electric power demand has been increasing steadily. But, Electric Power Supply & Demand problem is occurring due to lack of electric power reserve ratio caused by electric power peak. For this reason, I investigated the current status of the Electric Power Supply & Demand and established Electric Power Supply & Demand and established Electric Power Supply & Demand measures. I will expect that this paper will be contributed balanced and stable Electric Power Supply & Demand management.

  • PDF

Development of Supply Capability Calculation and Prediction Technology for Generator (발전기 공급능력 산정 및 예측 기술개발)

  • Kim, Euihwan;An, Youngmo;Hong, Eunkee
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.425-431
    • /
    • 2016
  • Supply Capability of the generator, if the maximum demand occurs, refers to the maximum power that can be stably supplied and it is possible to maintain stable power supply to be greater than actual load. However, unexpected power demand and reduction in supply Capability due to stop of unexpected generator in operation can temporarily make a big chaos in power system. In fact, due to a lack of power supply Capability in the country, enforced emergency load adjustment to the September 15, 2011, the circulation power outage has occurred in several cities. As the result, interrupted operation of the elevator and stopped hospital medical equipment led to a great deal of trouble to people's lives, causing a social problem. At that time, it was found that a failed frequency control because of smaller actual supply Capability than that of predicted. The difference was about 1,170 MW with Gas turbine power plant. By accurately calculating the generator supply capability, we can not only grasp the power reserve rate, but also correspond to the time of power supply instability.

Standardization for receive and supply of electric power facility of airport (공항 수.배전 설비 표준화)

  • 최홍규;원진희;송영주;조계술
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.349-354
    • /
    • 2003
  • Airport facility is infrastructure that become external creditworthiness and linear measure of country competitive power. Among them, receive and supply of electric power facility of airport is very important in peculiarity, trustability, safety side of airport. In this parer, sorted domestic airline as 4 classes by code to accomplish standardization for receive and supply of electric power facility of airport. And established justice and coverage about receive and supply of electric power facility using without any standard present and analyze problem for receive and supply of electric power facility of existing airport and presents standard. Finally, present standard single-line diagram by airport grade and system grade standard of receive and supply of electric power facility of airport.

  • PDF

Development of Q-Class DC Power Supply for N.P.P (발전소 제어계통 Q등급 직류전원공급장치 개발)

  • Park, Jong-Beom;Yoon, Gi-Gab;Lee, Nak-Hee;Kim, Deuk-Soo
    • Proceedings of the KIEE Conference
    • /
    • 1999.11b
    • /
    • pp.331-333
    • /
    • 1999
  • Power supply for Nuclear Power Plant was developed, and MMI monitoring circuit was added to the main function of power supply. The developed power supply is designed to show equal or higher performance compared with the existing power supplies. Performance of the power supply is verified by simulations, experiments, and authentication test for Q-class, he status of power supply and fault waveform can be displayed and analyzed on PC by RS-232C port. By adopting the latest parts, mainly domestic models, production cost and delivery can be reduced. Replacement period of capacitor can be extended by life estimation.

  • PDF

The Quantitative Evaluation of Aging State of Field Composite Insulators Based on Trap Characteristics and Volume Resistivity-Temperature Characteristics

  • Liang, Ying;Gao, Li-Juan;Dong, Ping-Ping;Gao, Ting
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.3
    • /
    • pp.1355-1362
    • /
    • 2018
  • In order to obtain a better understanding of the ageing process of the field composite insulators, it is necessary to explore a quantitative-valuation method for the aging state evaluation. And the linear relationship between volume resistivity and temperature is proposed. In this paper, the composite insulators with different lengths of operating lives from two manufacturers were tested. The relationship between trap characteristics and volume resistivity-temperature characteristics were analyzed based on Thermal Stimulated Current (TSC), volume resistivity-temperature test, Scanning Electron Microscope (SEM) and Fourier Transform Infrared Spectroscopy (FTIR). Furthermore, the application of trap characteristics in the quantitative evaluation of aging state of composite insulators was discussed. The results showed that there was a general negative correlation between the relative variation ratio of trap charges and the volume resistivity-temperature characteristics. Meanwhile, the physicochemical properties would change with the aging time, which would result in the increasing of electron traps. Combined with the TSC and volume resistivity test results, the trap characteristic thresholds which indicated the serious age of the composite insulators had been proposed.

Safety for the Stable Electric Power Supply (안정적인 전력공급을 위한 안전)

  • Yoon, Jae-Kun
    • 한국연소학회:학술대회논문집
    • /
    • 2012.11a
    • /
    • pp.163-165
    • /
    • 2012
  • Korea is now the country with shortage of electric power because of limits on power usage of businesses to prevent a possible blackout during the summer and winter. This is due to the failure to predict the total power usage. And the futhermore several accidents in the power plant during the overhaul maintenance threaten the stable power supply. Accidents were due to the combustion of low calorific coal and the shortage of the maintenance time. We should not incur a future great loss by pursuing a present small profit.

  • PDF

Simulator Development for Training Auxiliary Power Supply in Electric Rolling Stock (전기 철도차량의 보조전원장치 실습용 시뮬레이터 개발)

  • Kim, Jae-Moon;Kim, Duk-Heon;Kim, Yuen-Chung
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.54 no.4
    • /
    • pp.192-197
    • /
    • 2005
  • This paper presents a development of the auxiliary power supply simulator for a electric rolling stock. An auxiliary power supplies are required for operating air conditioning units, ventilation fans, lighting and battery charging. Traditionally this function has been fulfilled by Motor-Alternator sets. In recent years, high performance of semiconductor and micro processor, availability and price have made three phase voltage source inverters as an attractive alternative to MA Sets. From the baseline model of the SIV(Static InVerter) for electric rolling stock, we designed the scale down model of the auxiliary power supply simulator consisting of an IGBT three phase voltage source inverter. The auxiliary power supply simulator can be used educatory purpose for training efficiently about operating principles of SIV.

A Study on the Loop Current Induced by Voltage Phase Difference Substations during Parallel Feeding under the Alternating Current AT Electric Power Feeding Method (교류 AT급전방식에서 병렬급전시 변전소간 전압위상차에 의한 루프전류에 관한 연구)

  • Park, Jae-Seok;Song, Joong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1997-2004
    • /
    • 2011
  • The $2{\times}25kv$ AT electric power feeding method in the A.C. electric train adopts the one-phase power feeding method as the standard due to a voltage phase difference, and the distance between the two neighboring substations is 50km due to voltage drop. The one-phase power feeding method makes the system operation feasible, while making it unfavorable for power supply. Moreover, railroad involves large-capacity single-phase load, and if it is expected to continue to rise, it is necessary to research on measures to stabilize the supply of power to railroad cars with the existing facilities. In this study, a parallel power feeding method between neighboring substations is proposed to stabilize the supply of electric power to electric railroad cars under the 2*25kv AT power feeding method and the loop current induced by voltage phase difference between the two neighboring substations during parallel power feeding is investigated.

  • PDF

Preliminary Study of HTS-FCL Application in Distribution System (초전도 한류기의 배전계통 적용 기본검토)

  • Choi, Heung-Kwan;Yoon, Jae-Young;Kim, Jong-Yeul;Lee, Byong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.421-423
    • /
    • 2003
  • To prevent fault effect in supply of electric power distribution system and plan stable operation of electric power system, must control magnitude of fault current. Although there are various kinds of method to solvethis, approached from super conductivity Fault Current Limiter application viewpoint among them. High Temperature Superconductor-Fault Current Limiter (HTS-FCL) development is progressing according to HTS technology development, and system application is tried. For actual system application of such super conductivity FCL, so that can reflect special quality of actuality supply of electric power distribution system just as it is in this treatise supply of electric power system by two modelling do. Also, by simulation of HTS-FCL action and protection coordination with another equipment appliances, verified the effectiveness in supply of electric power system applying itself super conductivity FCL EMTDC dynamic characteristic model that is develope.

  • PDF

A plan to harmonize the equipments of power distribution with its environment (배전설비의 환경조화방안)

  • Lee, Jae-Gwan;Kim, Sang-Yul
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1206-1209
    • /
    • 1998
  • For 21th Century, the assignment of power distribution will be the expansion of equipments to supply electric power and harmony with its environment, in process of approving value consciousness of land, space, and the preservation of surroundings. This paper proposes a plan to match with the requirement about equipments, having ability to supply electric power, being harmonized itself with its surroundings by applying a general concept of "Amenity" when we choose an established form of power distribution.

  • PDF