• Title/Summary/Keyword: Electric bus

Search Result 319, Processing Time 0.025 seconds

A study on the power system restoration simulator (전력계통 고장복군 교육 시스템에 관한 연구)

  • Lee, H.J.;Kim, J.M.;Lee, K.S.;Park, S.M.;Song, I.J.;Lee, N.H.;Bae, J.C.;Hwang, B.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.181-183
    • /
    • 2003
  • This paper presents an operator training simulator for power system restoration against massive black-out. The system is designed especially focused on the generality and convenient setting up for initial condition of simulation. The former is accomplished by using on line calculation methodology, and PSS/E data is used to define the initial situation. The proposed simulator consists of three major components - the Power flow(PF) module, data conversion(CONV) module and CUI subsystem. PF module calculates power flow, and then checks overvoltage of buses and overflow of lines. CONV module composes an Y-Bus array and a data base at each restoration action. The initial Y-Bus array is constructed from PSS/E data. The user friendly GUI module is developed including graphic editor and built-in operation manual. As a result, the maximum processing time for one step operation is 15 seconds, which is adequate for training purpose. Comparison with PSS/E simulation proves the accuracy and reliability of the training system.

  • PDF

A Study on the Calculation Scheme of Extreme Loading Point and Nose Curves using Modified N-R and Continuation Method (수정N-R법과 연속음형법을 이용한 임계부하점 및 Nose Curve 산정기법 연구)

  • Yu, In-Keun
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.7
    • /
    • pp.712-722
    • /
    • 1992
  • Several voltage instability/collapse problems that have occurred in the electric utility industry worldwide have gained the attention of engineers and researchers of electric power systems. This paper proposes an effective calculation scheme of the extreme loading point and nose curves(P-V curves) using modified Newton-Raphson(N-R) load flow method and the Continuation Method. This method provides detail and visual information of the power system voltage profile and operating margin ro operators and planners. In this paper, a modified load flow claculation method for ill-conditioned power systems is introduced for the purpose of seeking more precise load flow solutions and nose curves, and the Continuation Method is also used as a part of the solution algorithm for the calculation of extreme loading point and nose curves. The conventional polar coordinate based N-R load flow program is modified to avoid numerical difficulties caused by the singularity of the Jacobian matrix occuring in the vicinity of extreme loading point of heavily loaded systems. Application results of the proposed method to Klos-Kerner 11-bus system and modified IEE-30-bus system are presented to assure the usefulness of the approach.

  • PDF

UPFC Operation Strategy for Enhancement of System Security (안전도 향상을 위한 UPFC 운전 전략)

  • Lee, Dong-Woo;Ahn, Seon-Ju;Moon, Seung-Il;Yoon, J.S.;Chang, B.H.;Kim, S.Y.;Moon, S.P.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.177-178
    • /
    • 2006
  • The enhancement of system security is one of the most important objectives of UPFC operation. To describe the system security, the index related to line flows and bus voltages are used. For the enhancement of security, the operation point of UPFC is set to minimize the index. This paper proposes the minimization algorithm using the Marquardt method. Moreover, the coefficients minimizing iteration number will be derived. For verification of the proposed operation scheme, numerical simulations have been performed on power system in Kwanju area, Korea with a UPFC.

  • PDF

A Study on the Improving Effectiveness of Shipboard Electric Propulsion System with Ultra-capacitor Energy Storage Devices (울트라 캐패시터 에너지 저장장치를 적용한 함정 전기추진 시스템의 효용성 증대 연구)

  • Kim, So-Yeon;Sul, Seung-Ki
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.17 no.2
    • /
    • pp.114-120
    • /
    • 2012
  • Recently, integrated electric propulsion system has been vigorously adopted into naval vessels. To enhance effectiveness and efficiency of power management in these propulsion systems, this paper investigates necessity of energy storage devices and their operation strategies. By introducing the energy storage devices, engine can operate at higher efficiency point and accordingly costs for fuel and maintenance are significantly reduced. In addition, transient performance can also be improved with support of the devices and it leads to stable operation of shipboard power bus. To validate the proposal of this paper, computer simulation has been conducted with real load data of existing electric propulsion system.

Development of Regeneration Invertor System for DC Electric Railway System (DC전철구간의 회생인버터시스템 개발)

  • Kim, Yong-Ki;Kim, Ju-Rak;Han, Moon-Seob;Kim, Jun-Gu;Yang, Young-Chul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.505-511
    • /
    • 2008
  • when electric traction system used DC 1500V runs on decline of rail road track and slows down, dc voltage goes beyond regular voltage. In this case extra power is forcibly wasted by resister because rectifier of substation and electric train including power converter and so on are out of order. This paper described a DC electric railway system, which can generate the excessive DC power form DC bus line to AC source in substation for traction system. The purpose of this study was the development of the regenerative inverter system which suppress extra DC-line voltage and regenerate the energy instead of using a resister. That is Developed regenerative inverter system returns the regenerative energy from the DC line voltage to the utility. In addition, the inverter can be compensate the harmonics caused by the power conversion devices used in the DC traction system.

  • PDF

A Positioning Method of Distributed Power System by Considering Characteristics of Droop Control in a DC Microgrid

  • Ko, Byoung-Sun;Lee, Gi-Young;Kim, Sang-Il;Kim, Rae-Young;Cho, Jin-Tae;Kim, Ju-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.2
    • /
    • pp.620-630
    • /
    • 2018
  • In this paper, a positioning method of distributed power system is proposed to minimize the average voltage variation of a DC microgrid through voltage sensitivity analysis. The voltage sensitivity under a droop control depends on the position of the distributed power system. In order to acquire a precise voltage sensitivity under a droop control, we analyzed the power flow by introducing a droop bus with the considerations of the droop characteristics. The results of the positioning method are verified through PSCAD/EMTDC simulation.

Application of UHF Partial discharge sensing technology in AC withstand voltage test of gas-insulated switchgear (345 kV GIS AC 내전압 시험의 UHF 부분방전 검출기술 적용)

  • Park, Ki-Jun;Goo, Sun-Geun;Yoon, Jin-Yeol;Jung, Kil-Jo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.1843-1845
    • /
    • 2000
  • GIS(Gas insulated switchgear)내부에서 발생한 부분방전 신호를 검출 할 수 있는 UHF(Ultra-high frequency) 부분방전 검출 센서를 345 kV GIS의 AC 내전압 시험에 적용하였다. 부분방전 센서를 적용한 상태에서 각 상별로, bus별로 나누어 계통 최고전압의 1.0 p.u, 1.5 p.u, 1.73 p.u 전압을 단계적으로 인가하였으며 간헐적으로 부분방전 신호가 검출됨을 확인하였다. 간헐적인 부분방전 신호는 GIS 내부에 있던 이물질에서 약한 방전이 시작되고 인가전압을 높임에 따라 방전의 강도가 증가하다 소멸되었다. 방전을 일으킨 이물질이 모두 증발되었거나 위치 변화에 의해 방전이 소멸된 것으로 판단된다.

  • PDF

Research about a structure system of the bus information system which is applied to the bus stop - Around a problem and preference of Pusan bus information system investigation - (버스정류장에 적용된 버스정보시스템의 구성 체계에 관한 연구 - 부산시 버스정보시스템의 문제점 및 선호도 조사를 중심으로 -)

  • Cha Min-Jun;Hong Kwan-Seon
    • Archives of design research
    • /
    • v.19 no.4 s.66
    • /
    • pp.61-70
    • /
    • 2006
  • The functions and roles in the various fields of modern society are changing into the unified and multiplex structure, which is simultaneous and virtual communication environments beyond physical space and time, by the digital IT technology. The urban traffic system is also being intellectualized in order to solve urban traffic problems and convenient services by using digital IT technology. The bus, which is the one of the most common public transportation, are suffering in the decrease of bus service quality and the bus passengers rate because of the development of other public transportation systems such as the subway and electric railway and by rapidly increasing private cars. By recognizing these problems, many domestic and overseas cities are promoting to introduce the Bus Information System (BIS) to improve service quality of buses through the intelligent traffic system. According to the construction of this new information system called the Bus Information System (BIS), the new bus stop configuration system and design plans are being required to solve the existing bus stop information system. Therefore, this research was conducted to suggest an effective BIS configuration system plan and synthetic design goals based on the investigation the problems of the information system and the BIS configuration system for Busan city. Also, this research are conducted the below actions as follows: First, the literature survey was conducted, such as theoretical documents on the bus stop and the Bus Information System(BIS), Also, the design trend of the BIS was examined through domestic and overseas BIS cases studies. Scondly, the problems related to the information system in Busan city bus stops were investigated to investigate the present state and problems of the Bus Information System (BIS). Finally, as a result of this research, the effective BIS configuration system plan and design approach methods of bus stops were proposed for by Busan city based on the above investigation results.

  • PDF

Study on the Heat Recovery System in Series Hybrid Electric Vehicle (직렬형 하이브리드 자동차에서의 폐열 회수에 대한 연구)

  • Jung, Daebong;Yong, Jinwoo;Kim, Minjae;Kim, Hyoungjun;Min, Kyoungdoug
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.95-95
    • /
    • 2010
  • In recent, there are tremendous requirements to improve the fuel economy of vehicle. For satisfaction of requirements, Hybrid Electric Vehicle or other technologies are suggested and implemented. However, it should be noted that almost 35% energy loss is occurred in the shape of exhaust gas as ever. For increase the efficiency of vehicle, it is certain that the exhaust gas energy should be recover, and generate energy. In previous studies, the technologies such as turbo-compound, thermoelectric and rankine cycle are suggested to recover the exhaust heat energy in vehicle. But, they focus on the conventional vehicle or parallel Hybrid Electric Vehicle. Series Hybrid Electric Vehicle has advantage that the engine and drive shaft are de-coupled. It means that the engine can be operated in high efficiency area regardless with vehicle states. Therefore, if rankine cycle is applied to series hybrid electric vehicle, operating condition of that becomes almost steady. So, in this study, theoretical analysis on the efficiency of rankine cycle applied to series hybrid electric city bus is carried and the energy recovered from exhaust gas during vehicle drive cycle is calculated.

  • PDF

DC Microgrid Operational Method for Enhanced Service Reliability Using DC Bus Signaling

  • Hwang, Pyeong-Ik;Jang, Gilsoo;Pyo, Gi-Chan;Han, Byung-Moon;Moon, Seung-Il;Ahn, Seon-Ju
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.2
    • /
    • pp.452-464
    • /
    • 2015
  • This paper proposes a DC microgrid operational strategy and control method for improved service reliability. The objective is to supply power to as many non-critical loads as possible, while providing an uninterrupted power supply to critical loads. The DC bus signaling method, in which DC voltage is an information carrier, is employed to implement the operational strategy in a decentralized manner. During grid-connected operation, a grid-tied converter balances the power of the microgrid by controlling the DC voltage. All loads are connected to the microgrid, and operate normally. During islanded operation, distributed generators (DGs), a backup generator, or an energy storage system balances the power. However, some non-critical loads may be disconnected from the microgrid to ensure the uninterrupted power supply to critical loads. For enhanced service reliability, disconnected loads can be automatically reconnected if certain conditions are satisfied. Control rules are proposed for all devices, and detailed microgrid operational modes and transition conditions are then discussed. Additionally, methods to determine control parameter settings are proposed. PSCAD/EMTDC simulation results demonstrate the performance and effectiveness of the proposed operational strategy and control method.