• Title/Summary/Keyword: Electric Power Lines

Search Result 485, Processing Time 0.025 seconds

A Study on the Radiated Noise from Power Line during EFT Immunity Test (EFT(Electrical Fast Transient)내성 시험시 발생되는 전원선 복사 잡음에 관한 연구)

  • 정삼영;이중근
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.11 no.2
    • /
    • pp.234-241
    • /
    • 2000
  • During the EFT immunity test, the fast transient voltage is injected to the power or signal line. The radiated noise from these lines influences the near-by EUT, and consequently, the reliability of the test result can be jeopardized. The measured data of the field strength and wave shape of the noise were compared with the result of the mathematical analysis using transmission line model. When the tests were performed by the conditions the same as stated in IEC 61000-4-4, the results showed that the magnitude of the radiated electric field strength was about 2.4KV/m, and it can cause severe interference to the intended operation of EUT.

  • PDF

Properties and classification of air discharge by Kohonen network (기중방전의 특성분석과 Kohonen network에 의한 방전원의 패턴분류)

  • 강성화;박영국;이광우;김완수;이용희;임기조
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 1999.05a
    • /
    • pp.704-707
    • /
    • 1999
  • Partial discharge(PD) in air insulated electric power systems is responsible for considerable power lossesfrom high voltage transmission lines. PD in air often leads to deterioration of insulation by the combined action of the discharge ions bombarding the surface and the action of chemical compounds that are formed by the discharge and may give rise to interference in ommunication systems. PD can indicate incipient failure. Thus understanding and classification of PD in air is very important to discern source of PD. In this paper, we investigated PD in air by using statical method. We classified air discharge with corona, surface discharge and cavity discharge by source of discharge. we used the mean pulse-height phase distribution $H_{qmean}(\psi)$, the max pulse-height phase distribution $H_{qmax}(\psi)$ , the pulse count phase distribution $H_n(\psi)$ and the max pulse height vs. repetition rate $H_{q}(n)$ for analysis PD pattern. We used statistical operators, such as skewness(S+. S-1, kurtosis(K+, K-), mean phase(AP+. AP-), cross-correlation factor(CC) and asymmetry from the distribution.

  • PDF

Application of Particle Swarm Optimization to the Reliability Centered Maintenance Method for Transmission Systems

  • Heo, Jae-Haeng;Lyu, Jae-Kun;Kim, Mun-Kyeom;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.6
    • /
    • pp.814-823
    • /
    • 2012
  • Electric power transmission utilities make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability. The development of maintenance strategies for aged components is one of the more effective ways to achieve this goal. The reliability centered approach is a key method in providing optimal maintenance strategies. It considers the tradeoffs between the upfront maintenance costs and the potential costs incurred by reliability losses. This paper discusses the application of the Particle Swarm Optimization (PSO) technique used to find the optimal maintenance strategy for a transmission component in order to achieve the minimum total expected cost composed of Generation Cost (GC), Maintenance Cost (MC), Repair Cost (RC) and Outage Cost (OC). Three components of a transmission system are considered: overhead lines, underground cables and insulators are considered. In regards to aged and aging component, a component state model that uses a modified Markov chain is proposed. A simulation has been performed on an IEEE 9-bus system. The results from this simulation are quite encouraging, and then the proposed approach will be useful in practical maintenance scheduling.

A Study on the Voltage Upgrading of Transmission Lines using Polymer Insulation Arm (폴리머 절연암을 이용한 송전선로 전압 승압에 관한 연구)

  • Lee, Won-Kyo;Lee, Jung-Won;Kang, Yeon-Woog;Lee, Dong-Il
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.22 no.10
    • /
    • pp.870-878
    • /
    • 2009
  • The large increase in the use of electricity has resulted in an ever-growing electric power demand. It has created the need for the construction of power transmission facility located close to the load centers and it also has to require wide right-of-way and large lots, that are not always available, for especially the installation of the towers. The difficulties in acquiring right-of-way have put pressure on energy companies to either upgrade a line on an existing right-of-way to higher voltage or build a new line on a narrow right-of-way. This paper presents the design of a compact tower with polymer Insulation arm, in order to reduce the separation between phases. the compact tower can be built on a narrow right-of-way. the compact tower can be designed based on 345 kV Tower regarding electrical clearances and right of way, therefore the conventional 154 kV Tower can be upgrading transmission line voltages have moved to 345 kV levels.

Optimal Location of Mail Distribution Center using Steiner Tree (Steiner Tree 이론을 이용한 우편물 교환센터인 최적 워치선정)

  • Yang, Seong-Deog;Lyu, Woong-Gyu;Lee, Sang-Joong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.9
    • /
    • pp.82-87
    • /
    • 2008
  • Faster, safer and cheaper mailing of the postal matter is essential for surviving in the competitive market of home-delivery service. In the past, the domestic delivery business has been nu by only a few number of companies. But more and more number of companies including medium size ones are participating in the business, and the competition is getting severe. This paper proposes a method to select the optimal location of mail distribution centers that minimally connect the local mail centers of some major cities in Korea using the Steiner Tree theory, which is about connecting a finite number of points with a minimal length of paths and has been used in the distribution system optimization and optimal routing of the transmission lines of the electric power system. By using Steiner Tree theory in finding the best location of the postal delivery hub, we may expect the reduction of transportation cost and the increase of profit, resulting in acquiring the superior position in the competitive delivery business. It is expected that we may use the Steiner Tree theory in finding the best location of the electric power substation for the nott higher EHV(extreme high voltage) transmission network.

Development of Algorithm and Program for the Ground Fault Detection in Ungrounded Distribution Power System (비접지 배전계통 지락고장 검출 알고리즘 및 프로그램 개발)

  • Park, So-Young;Shin, Chang-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2619-2627
    • /
    • 2009
  • The ground fault is occupying 70% among the total number of faults in ungrounded distribution power system. When the ground fault occurs in ungrounded system, the fault current is so small that it is hard to detect. But fault handling is very important because to continue power supply during fault conditions may cause the fault spreading and the distribution device in trouble. This paper presents the fault line detection method by using GPT signal detecting zero sequence voltage, and the fault section detection method by detecting whether GPT signal is disappeared or not during shifting normally open switch, which is connecting switch between distribution lines with open state in order to restore the outage area under emergency situation, and during isolating each section one by one which belongs to the fault line. This method is efficient because there is no whole power interruption during the fault section detection, and it is possible to perform both the fault section detection and the service restoration for the outage area at the same time, and it can apply to various distribution system configuration. Program for the fault restoration was developed applying proposed method, and it has been validated by applying to the pilot project of distribution automation system in Vietnam which has the ungrounded distribution system.

Optimal Positioning Algorithm for Distributed Energy Resources near Ocean Side (해양도시내 분산전원의 최적 설치점 선정)

  • Park, Jeong-Do;Lee, Seong-Hwan;Doe, Geun-Young;Seong, Hyo-Seong;Jang, Nak-Won
    • Journal of Navigation and Port Research
    • /
    • v.33 no.6
    • /
    • pp.457-462
    • /
    • 2009
  • In this paper we suggest optimal positioning algorithm for DER(distributed energy resource)s near ocean side by using Newton-Rhapson load flow calculation. By installing DERs within urban area, electric power can be effectively transmitted to each loads without constructing additional large scale power stations and transmission lines. Therefore, DERs have attracted worldwide attention as urban area energy sources. However, there are quite a few studies for estimation of power loss due to DERs' location change within urban area Hence, in this study, an optimal positioning scheme for DERs is proposed in order to minimizing electrical power loss.

Analysis of Induced Voltage on the Gas Pipeline at the Fault in a Underground Power Cables (지중전력케이블에서 고장발생시 인근 가스배관에 유도되는 전압 해석)

  • Bae J. H.;Kim D. K.;Kim K. J.
    • Journal of the Korean Institute of Gas
    • /
    • v.4 no.3 s.11
    • /
    • pp.26-32
    • /
    • 2000
  • Because of the continuous growth of energy consumption, and also the tendency to site power lines and pipelines along the same routes, the close proximity of high voltage structures and metallic pipelines has become more and more frequent. Moreover, normal steady state and fault currents become higher as electric networks increase in size and power Therefore, there has been and still is a growing concern(safety of people marking contact with pipeline, risk of damage to the pipeline coating, the metal and equipment connected to pipeline, especially cathodic protection system) about possible hazards resulting from the influence of high voltage power system on metallic structures(gas pipeline, oil pipeline and water pipeline etc.). Therefore, we analyze the interference problems when the gas pipeline is buried with power cable in the same submarine tunnel. This paper present the results of the study about interference mechanism, AC corrosion limitation of safety voltage and analysis of induction voltage.

  • PDF

Fishing efficiency of LED fishing lamp for squid Todarodes pacificus by training ship (실습선에 의한 LED 집어등의 오징어 어획성능)

  • An, Young-Il;Jeong, Hak-Geun
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.48 no.3
    • /
    • pp.187-194
    • /
    • 2012
  • This study surveyed the fishing efficiency for Japanese common squid based on improvements made to LED fishing lamps by utilizing the training ship of Gangwon Provincial College. The training ship, Haesong-ho (24 tons), was equipped with seventy-two 150W electric power LED fishing lamps (10.8kW), and their fishing efficiency and fuel consumption level were surveyed for a total of ten times during the period between June 15, 2009 and July 27, 2009. In addition, the training ship was equipped with seventy-one 300W electric power LED fishing lamps (21.3kW) and their fishing efficiency and fuel consumption level were surveyed for a total of five times during the period between January 17, 2010 and August 4, 2010. In order to compare the fishing efficiency of LED fishing lamps, the catch of another fishing vessel equipped with Metal Halide (MH) fishing lamps of 120kW for the same period and at the same fishing grounds. The fuel consumption levels during the fishing operation of Haesong-ho was about 1,047.7 liters which was approximately 19.9% of the total fuel consumption level of 5,262.6 liters, and the fuel consumption level per operation hour was on average 9.2 liters. The number of Japanese common squid caught by the LED fishing lamp-equipped fishing vessel ranged from 12 to 1,640 squid for each fishing trial and the average quantity was 652. The number of Japanese common squid caught by the MH fishing lamp-equipped 10 fishing vessels ranged from 40 to 4,800 squid and the average quantity was 2,055. The fishing of Japanese common squid was done by the use of hand lines and an automatic jigging machine. The number of Japanese common squid caught per hand line and a single roller of the automatic jigging machine was in the proportion of 50.8% to 49.2% with respect to the LED fishing lamp-equipped fishing vessel. However, the number of Japanese common squid caught per hand line and a single roller of the automatic jigging machine was in the proportion of 86.4% to 13.6% with respect to the MH fishing lamp-equipped fishing vessel where most of the catch was made by hand lines. On the other hand, in comparing the number of Japanese common squid caught per automatic jigging machine, the number of squid caught by the LED fishing lamp-equipped fishing vessel was about the same or greater than the number of squid caught by the MH fishing lamp-equipped fishing vessel.

A Experimental Study on the Determination of Construction method of Controled Low-strength Material Accelerated Flow Ability Using Surplus Soil for Underground Power Line (지중송전관로용 급결 유동성 뒤채움재의 시공법 설정에 관한 실험적 연구)

  • Oh, Gi-Dae;Kim, Dae Hong
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.3
    • /
    • pp.84-93
    • /
    • 2010
  • Compaction of backfill material of Underground power lines is difficult, especially under pipeline. so it could cause structural problem because of low compaction efficiency. So various methods have been taken to solve the problem and one of them is CLSM(Controled low-strength material accelerated flow ability). But In other countries, these are already in progress for a long time to research and development and recently on practical steps. But, in our country, study for only general structures, not for underground power line structure that is being constructed at night rapidly. In this study, we performed property tests and indoor & outdoor test (3 cases). The tests showed flow ability reached at the limit construction(160 mm) flowability by 9 to 15 minute after starting to mix, and construction buoyant is lowering after placing CLSM by 70 % of theoretical buoyant that is calculated by unit weight of material. In this paper, we performed indoor tests and outdoor tests to estimate mechanical properties and to suggest construction method(using batch plant, setting spacer at 1.8 m and placing at 2m) for CLSM that using surplus soil. And the test showed good results for construction quality, workability and structure safety.

  • PDF