• Title/Summary/Keyword: Electric Power Lines

Search Result 485, Processing Time 0.026 seconds

Study on the Air Insulation Design Guideline for ±500 kV Double Bipole Transmission Line with Metallic Return Conductor (도체귀로형 ±500 kV Double Bipole 송전선로 공기절연에 관한 연구)

  • Shin, Kooyong;Kwon, Gumin;Song, Seongwhan;Woo, Jungwook
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.3
    • /
    • pp.141-147
    • /
    • 2019
  • Recently, the biggest issue in the electricity industry is the increase in renewable energy, and various technologies are being developed to ensure the capacity of the power system. In addition, super-grids linking power systems are being pushed to utilize eco-friendly energy between countries and regions worldwide. The HVDC transmission technology is required to link the power network between regions with different characteristics of the power system such as frequency and voltage. Until now, Korea has applied HVDC transmission technology that connects mainland and Jeju Island with submarine cables. But, the HVDC transmission technology is still developing for long-distance high-capacity power transmission from power parks on the east coast to load-tight areas near the metropolitan area. Considering the high population density and mountainous domestic environment, it is pushing for commercialization of the design technology of the ${\pm}500kV$ Double Bipole with metallic return wire transmission line to transmit large-scale power of 8 GW using minimal right of ways. In this paper, the insulation characteristics were studied for the design of double-bipole transmission tower with metallic return wire, which is the first time in the world. And the air insulation characteristics resistant to the various overvoltage phenomena occurring on transmission lines were verified through a full-scale impulse voltage test.

Study on Thermal Load Capacity of Transmission Line Based on IEEE Standard

  • Song, Fan;Wang, Yanling;Zhao, Lei;Qin, Kun;Liang, Likai;Yin, Zhijun;Tao, Weihua
    • Journal of Information Processing Systems
    • /
    • v.15 no.3
    • /
    • pp.464-477
    • /
    • 2019
  • With the sustained and rapid development of new energy sources, the demand for electric energy is increasing day by day. However, China's energy distribution is not balanced, and the construction of transmission lines is in a serious lag behind the improvement of generating capacity. So there is an urgent need to increase the utilization of transmission capacity. The transmission capacity is mainly limited by the maximum allowable operating temperature of conductor. At present, the evaluation of transmission capacity mostly adopts the static thermal rating (STR) method under severe environment. Dynamic thermal rating (DTR) technique can improve the utilization of transmission capacity to a certain extent. In this paper, the meteorological parameters affecting the conductor temperature are analyzed with the IEEE standard thermal equivalent equation of overhead transmission lines, and the real load capacity of 220 kV transmission line is calculated with 7-year actual meteorological data in Weihai. Finally, the thermal load capacity of DTR relative to STR under given confidence is analyzed. By identifying the key parameters that affect the thermal rating and analyzing the relevant environmental parameters that affect the conductor temperature, this paper provides a theoretical basis for the wind power grid integration and grid intelligence. The results show that the thermal load potential of transmission lines can be effectively excavated by DTR, which provides a theoretical basis for improving the absorptive capacity of power grid.

Analysis of Simulation Results for Secondary Arc in 765kV single transmission line (765kV 1회선 선로의 2차아크 모의결과 분석)

  • Ahn, S.P.;Kim, C.H.;Park, N.O.;Ju, H.J.;Shim, E.B.
    • Proceedings of the KIEE Conference
    • /
    • 2004.11b
    • /
    • pp.36-38
    • /
    • 2004
  • In many countries, including Korea, in order to transmit the more electric power, the higher transmission line voltage is inevitable. So, a rapid reclosing scheme is important for UHV transmission lines to ensure requirements for high reliability of main lines. But, because of the high voltage and long span of UHV lines, the secondary arc current flows across the fault point even after the interruption of the fault current. i.e. A critical aspect of reclosing operation is the extinction of the secondary arc since it must extinguish before successful reclosure can occur. In Korea transmission lines, it is scheduled to energize 765kV single transmission line(79km) between Sin-Ansung S/S and Sin-Gapyeong S/S at June 2006. Therefore this paper analyzes characteristics of the secondary arc extinction on 765kV single transmission line using EMTP. Simulation results shows that the average value of the secondary arc is $30A_{rms}$ and the auto-extinction time of it is longer at closer point to Sin-Gapyeong S/S.

  • PDF

Measurements of the Ground Resistance using the Test Current Transition Method in Powered Grounding Systems (측정전류전이법을 이용한 운전중인 접지시스템의 접지저항 측정)

  • Lee, Bok-Hui;Eom, Ju-Hong;Kim, Seong-Won
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.51 no.8
    • /
    • pp.347-353
    • /
    • 2002
  • This paper presents an accurate method for measuring the ground resistance in powered grounding system. Most of substations and electric power equipments are interconnected to an extensive grounding network of overhead ground wires, neutral conductors of transmission lines, cable shields, and etc. The parasitic effects due to circulating ground currents and ground potential rise make a significant error in measuring the ground resistance. The test current transition method was proposed to reduce the effects of stray ground currents, ground potential rise and harmonic components in measurements of the ground resistance for powered grounding systems. The instrumental error of the test current transition method is decreased as the ratio of the test current signal to noise(S/N) increases. It was found from the test results that the proposed measuring method of the ground resistance is more accurate than the conventional fall-of-potential method or low-pass filter method, and the measuring error was less than 3[%]when S/N is 10.

Building Underground Facility Management System of Power Transmission and Power Distribution using GIS (지리정보체계를 이용한 송배전 지하시설물관리시스템 구축)

  • Jang, Yong-Gu;Kang, In-Joon;Kim, Sang-Seok;Yang, Seung-Tae
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.7 no.2
    • /
    • pp.69-77
    • /
    • 2004
  • Now, there are some problems to manage underground facilities in domestic. Specially, in the case of KEPCO(Korea Electric Power Corporation), it is so difficult to manage electronic line more stably and detailedly because the geographic information and attribute information being built is not easy to be updated in the field. KEPCO officials who are accompanying management and supervision in earthwork do not have sufficient knowledge and information about GIS but they grasp the information of geography and property which coincide with the field. Therefore they have to refer their business analysis contents sufficiently for more efficient lines management in the KEPCO, but it is problem that the existing information of electronic lines management system is not. In this study, we constructed power transmission and power distribution underground facility management system for the user to manage and maintain underground facilities more easily and safely using the information of geography and property about power transmission and power distribution underground facility which have been built by KEPCO.

  • PDF

Development of Eco-friendly Electric Transmission Towers in KEPCO (환경조화형 철탑 개발)

  • Lee, Won-kyo;Mun, Sung-Duk;Shin, Kooyong
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.3
    • /
    • pp.135-140
    • /
    • 2019
  • Lattice towers and tubular steel poles have been commonly used for electrical power transmission in Korea. They are durable, structurally stable, simple and can easily be constructed in limited spaces. However, residents are opposed to construct transmission lattice towers in their areas because they are not visually attractive, and electrical field occur at the transmission lines. Underground transmissions have been used instead of the traditional towers to resolve these problems, however they are not cost effective to construct and run. Therefore, we have developed eco-friendly towers that are more attractive, well blending into the surrounding environment, and much more economical than underground transmissions. There are four categories of the eco-friendly electric transmission towers about design aspects. Firstly, there is decoration type such as tree tower and ensemble tower. Tree tower looks like actual trees with leaves and branches so it blends into surroundings. Ensemble towers were designed after pair of crane birds. Those towers have decoration features and art works. Structural examination and manufacturing this type would be very similar to the conventional transmission towers. Secondly, there is arm design type such as traditional tower. Design features are added to the existing towers. As partial design can be adoptable on these types, it can easily meet height regulations and attach to conventional lattice towers and tubular steel poles. Also, these towers are more economical than others. Third category is multipurpose type such as Sail Tower. These towers have simple pole or tubular structure with features which can be used as information message board, public relations and much more. This type will face greater wind pressure because of the area of the board, also visibility must take into consideration. Lastly, there is moulding type such as arc pylon. It is different shape to the conventional towers - lattice towers and tubular steel poles. Dramatic design changes have been adapted - from a hard and static tower to a soft and curved tower. These towers will well stand out in the field. However, structural examination and manufacturing this type would be difficult and costly. Also certain towers of this type would require scaffolding or false work to construct, which will result in limitations of the construction area. This paper shows KEPCO 154 kV Sail tower in detail. KEPCO 154 kV Sail tower that is included in fabrication of sample tower and tower testing has developed and the results are presented in this paper. We hope that sail tower is also considered as a solution to have public acceptance or to create a familiar atmosphere among towers and people in coastal area.

Development of the Bus Duct Installation System for Wind Tower (풍력타워용 부스덕트 포설시스템 개발)

  • Rhee, Huinam;Lee, Joon Keun;Kim, Bong-Seok;Park, Seong-Hee
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.24 no.3
    • /
    • pp.219-226
    • /
    • 2014
  • A bus duct system for wind tower is introduced. A marine cable has been widely used in wind tower or various offshore structures. However, as the electric load capacity is increases, large number of cable lines must be used to cover the huge amount of electric capacities. Therefore, the installation of the cable lines becomes very difficult due to the heavy weight and volume of the cables. On the other hand, by using a single bus duct system line, the power capacity amount of 16 cables can be delivered with significantly compacted form. However, unlike flexible cables, the bus duct is relatively stiff which could generate the resonance phenomenon in the operating condition of the wind tower. In this study, the vibration characteristics of the bus duct are investigated and its long-term reliability during the life time of the wind tower is verified.

Ion Effects of HVDC ±500 kV Double Bipole Overhead Transmission Line with Metallic Return Conductor Using Full-scale Test Line (실증시험선로를 이용한 도체귀로형 HVDC ±500 kV Double Bipole 가공송전선로의 이온류 특성 평가)

  • Shin, Kooyong;Kwon, Gumin;Ju, Munno;Woo, Jeong Min
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.4
    • /
    • pp.249-256
    • /
    • 2019
  • A full-scale test line was established to verify the electrical environmental interferences caused by the HVDC ±500 kV Double Bipole overhead transmission line with metallic return conductor, which is scheduled for construction in Korea and the fullscale test was conducted for one year. And through the human perception test of the DC electric-field under the HVDC Double Bipole line, the threshold value at which the human detects DC electric field was investigated to verify the validity of the design guide for the HVDC ±500 kV Double Bipole overhead transmission line. The polarity configuration of the HVDC ±500 kV Double Bipole test line was arranged diagonally with the same polarity in terms of the electrical environment disturbance and operation. The test line utilized the 6-bundle arrangement to prevent the corona discharge taking into account the domestic social acceptability. The test results show that the HVDC ±500 kV Double Bipole transmission line generated very little corona discharge from the conductors. Therefore, both DC electric field and ion current density met the domestic design guide for DC overhead transmission lines. Also, the human perception test of DC electric fields under the test line showed that 70% of participants did not recognize the DC electric field even when exposed to 23 kV/m.

A Case Study of Resolving Conflict in Energy Infrastructure Siting by the Solar PV Project

  • Lee, Jonghwan;Shin, Dong-hwi;Han, Soohee;Roh, Jae Hyung
    • Current Photovoltaic Research
    • /
    • v.8 no.3
    • /
    • pp.79-85
    • /
    • 2020
  • The growing demand for new energy infrastructure has often been encountered with the difficulties of siting in power plants and electric transmission lines. Siting such large-scale and complex facilities produces so many-sided issues that it is highly necessary to develop an approach to resolving the related problems and conflicts. This paper introduces how the stakeholders have handled the issues and resolved conflicts with residents opposed the construction of 765 kV transmission line. The solar photovoltaic power generation, called "Hee-Mang Sunlight Power project", is used for persuading residents to agree with constructing high-voltage transmission line and sharing benefits. It is considered how the project performance such as generation output and resident's profits is and proposed what the project should be revised and supplement. The project is shown that the intractable spiting in energy systems can be smartly resolved with cost-effective institutional solutions instead of relatively expensive technical ones.

Wireless Sensor for Diagnostics of Electric Equipments (전력 설비 감시를 위한 무선 센서)

  • Choi, Yong-Sung;Kim, Hyung-Gon;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.98-102
    • /
    • 2008
  • Methods and analysis of a simple wireless sensor concept for detecting and locating faults as well as for load monitoring are presented. The concept is based on distributed wireless sensors that are attached to the incoming and outgoing power lines of secondary substations. A sensor measures only phase current characteristics of the wire it is attached to, is not synchronized to other sensors and does not need configuration of triggering levels. The main novelty of the concept is in detecting and locating faults by combining power distribution network characteristics on system level with low power sampling methods for individual sensors. This concept enables the sensor design to be simple, energy efficient and thus applicable in new installations and for retrofit purposes in both overhead and underground electrical distribution systems.

  • PDF