• Title/Summary/Keyword: Efficient management project

Search Result 616, Processing Time 0.036 seconds

Real-time Construction Progress Monitoring Framework leveraging Semantic SLAM

  • Wei Yi HSU;Aritra PAL;Jacob J. LIN;Shang-Hsien HSIEH
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1073-1080
    • /
    • 2024
  • The imperative for real-time automatic construction progress monitoring (ACPM) to avert project delays is widely acknowledged in construction project management. Current ACPM methodologies, however, face a challenge as they rely on collecting data from construction sites and processing it offline for progress analysis. This delayed approach poses a risk of late identification of critical construction issues, potentially leading to rework and subsequent project delays. This research introduces a real-time construction progress monitoring framework that integrates cutting-edge semantic Simultaneous Localization and Mapping (SLAM) techniques. The innovation lies in the framework's ability to promptly identify structural components during site inspections conducted through a robotic system. Incorporating deep learning models, specifically those employing semantic segmentation, enables the system to swiftly acquire and process real-time data, identifying specific structural components and their respective locations. Furthermore, by seamlessly integrating with Building Information Modeling (BIM), the system can effectively evaluate and compare the progress status of each structural component. This holistic approach offers an efficient and practical real-time progress monitoring solution for construction projects, ensuring timely issue identification and mitigating the risk of project delays.

Development of Construction Site Access Management Automation System based on Hand Vascular Pattern

  • Gu Taek Kim;Ji Woong Yeom;Kyong Hoon Kim;Choong Hee Han;Jae Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.499-505
    • /
    • 2009
  • Along with the changing pattern that the construction project is getting complicated, large-scaled and up-to-dated, necessity of efficient management of manpower and resources of the construction site is being increased. In particular, considering that the construction site requires a lot of labor force and in terms of the construction cost, labor cost shares 30-40%, labor management has become a very important factor. In this study, in order to support a stable and successful construction project implementation and supplement the existing system being utilized at the current site, construction site access management automation system based on hand vascular pattern, a biometrics system, is intended to be developed. Relevant theory for the system development and the problem of existing RFID system were evaluated and based on this findings, a system design and DB composition chart were envisaged. In addition, by applying this developed system to a number of sites, its result was analyzed

  • PDF

Promoting Efficient Smart Factories through Analysis and Status of Corporate Infrastructure Configuration

  • Seong-Hoon Lee
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.16 no.3
    • /
    • pp.274-280
    • /
    • 2024
  • The smart factory promotion project is a project that improves the entire management environment system, including the production process, using ICT technology. According to the 2019 Smart Factory Survey and Analysis Research Report of the Ministry of SMEs and Startups, small and medium-sized enterprises that introduced smart factories reported positive effects such as increased productivity, improved quality, and reduced costs on average. On the other hand, the survey results of companies that promoted the project despite positive results showed that there was room for improvement. This study dealt with the contents of the survey conducted on companies by the smart factory promotion agency in 2020 regarding the infrastructure configuration for promoting smart factories. We examined the meaningful contents implied by the data related to the infrastructure configuration. These meaningful survey results can lead to more efficient business promotion in the future when promoting smart factory projects.

APPLICATION OF FUZZY LINEAR PROGRAMMING FOR TIME COST TRADEOFF ANALYSIS

  • Vellanki S.S. Kumar;Mir Iqbal Faheem;Eshwar. K;GCS Reddy
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.69-78
    • /
    • 2007
  • In real world, the project managers handle conflicting goals that govern the use of resources within the stipulated time and budget with required quality and safety. These conflicting goals are required to be optimized simultaneously by the project managers in the framework of fuzzy aspiration levels. The fuzzy linear programming model proposed herein helps project managers to minimize total project costs, completion time, and crashing costs considering indirect costs, contractual penalty costs etc by practically charging them in terms of direct cost of the project. A case study of bituminous pavement under construction is considered to demonstrate the feasibility of applying the proposed model for optimization of project parameters. Consequently, the proposed model yields an efficient compromise solution and the decision maker's overall degree of satisfaction with multiple fuzzy goal values. Additionally, the proposed model provides a systematic decision-making framework, enabling decision maker to interactively modify the fuzzy data and model parameters until a satisfactory solution is obtained. The significant characteristics that differentiate the proposed model with other models include, flexible decision-making process, multiple objective functions, and wide-ranging decision information.

  • PDF

APPLYING LEAN CONSTRUCTION TO DESIGN PHASE

  • Joo-Hyun Park;Dae-young Kim;Hak-Ki Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1208-1211
    • /
    • 2005
  • The design phase has a great influence on the success of subsequent phases in the project which can be connected with the success of the overall project. Several studies have focused on the effective design management. However, it is too complicated and difficult to manage the design process for the reason that it has a lot of participants and design information and consists of thousands of decisions by an architect alone. Accordingly, it is the main issue for the success of the project how well the design phase be organized and managed. In recent, even in domestic, the importance of design phase has begun to be referred in the conferences. Lean Construction also has a close look at those issues and makes ready to apply specific management methods, called to Lean Design & Construction. Managers can consider a variety of uncertainties to be under control through making the overall process effectively from the early stage. By establishing the efficient process from the design phase before the construction phase, managers can result in a desirable productivity. The aim of this study is to bring the concept (Lean Design & Construction) in domestic design circumstances and verifies the possibility how to apply the concept to the design phase.

  • PDF

A Study on Recognition of Land Acquisition for Ecology Restoration Project in Ecological and Landscape Conservation Area of Donggang River Basin. (동강유역 생태·경관보전지역 내 매수토지 생태복원사업 인식도 연구)

  • Li, Lan;Koo, Bon-Hak
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.20 no.4
    • /
    • pp.15-28
    • /
    • 2017
  • A protected area means a space designated and protected by law from development pressure and environmental pressure. It is mainly designated to protect specific ecosystems, natural landscapes, and cultural resources from irrational development (or damage), and involves policies of the public sector such as central and local governments. The United Nations Educational, Scientific and Cultural Organization (UNESCO) has conducted conservation and restoration projects for preserving natural ecosystems and genetic resources. In order to conserve the ecosystem in the protected area, national and public organizations purchase private land and use it ecologically; in addition, ecological restoration project is carried out for the purpose of creating waterside ecological belt or preserving ecosystem. Land acquisition refers to the land where highly influenced by the water quality and need to restore, and purchased by negotiating with the landlord. Although the nation and public institution carried out ecosystem restoration project for partial purchase land in order to conserve ecosystem, it is below the expected effect due to lack of comprehensive management system and have some problems in restoration project and unification of management institutions. Land acquisition in Donggang River Basin Ecological Conservation area is initiated in 2005 for creating income of local residents and ecological restoration. However, the lack of overall management and awareness resulted in poor vegetation growth and poor response by local residents due to terrain exposure. As such, there is insufficient research on the current situation and systematic integrated management although the number of land acquisition is increasing year after year. Futhermore, overall recognition and follow-up monitoring of eco-restoration are still inadequate. Therefore, the survey on the awareness of the purchase land ecosystem restoration project is necessary for the efficient restoration project and establishment of the management strategy for land acquisition in the future. Therefore, in this study, we provide fundamental materials on further research projects by carrying out research on the awareness of ecological restoration projects in the Donggang River basin ecological preservation area.

A Study on the Actual Condition and Development of BCWS Management In Large Apartment Complex Project (대단지 아파트 건설공사의 계획기성 관리실태에 관한 연구)

  • Kim Sang-Hee;Yang Yong-Cheol;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.434-437
    • /
    • 2003
  • In apartment project, BCWS is a critical management factor and has a great influence on the success of the project. But due to the characteristics of large apartment complex, there are several problems in making out a time schedule of work as well as production and management of precise bcws from the allocation of resources. In this study, Actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of bcsw through the analysis of the problems and the origins relating to BCWS from a field area.

  • PDF

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

THE EFFICIENT ESTIMATE OF ENVIRONMENTAL MANAGEMENT COSTS IN THE CONSTRUCTION SITES

  • Hyuk Moon;Sung-Jin Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.437-446
    • /
    • 2005
  • Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.

  • PDF

KOREAN CONSTRUCTION PROJECT MANAGER'S CAPABILITY CHANGE OVER THE LAST DECADE

  • Soun JO;Hyunsang CHO;Seeun CHOI;Minji BAEK;Jimin KIM;Hyounseung JANG
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.761-768
    • /
    • 2024
  • The South Korean construction industry has grown larger and more complex through collaboration with various fields. In the construction industry, faced with the era of the 4th Industrial Revolution, the importance of project managers is growing for successful construction projects. Amid these changes, it is necessary to grasp the capabilities and importance of project managers for the development of the South Korean construction industry and analyze how they affect it. This study aims to review the required capabilities of the project manager and suggest implications with a comparison of current capabilities and importance. To this end, a survey was conducted on the importance and Performance of the project manager. Using collected data, changes in capabilities are identified by comparing the Performance and importance of project managers respectively in 2010 and 2022 through the Importance - Performance Analysis (IPA) method. The analysis results show changes in the Performance and importance of project managers according to changes in the construction environment, and the insufficient capabilities of them. Based on this research, it is expected that efficient construction management will be possible amid changes in the construction environment by presenting the method to improve necessary capabilities to project managers in South Korea.