• Title/Summary/Keyword: Economic feasibility analysis

Search Result 811, Processing Time 0.028 seconds

A Study on the Methodologies of Economic Analysis for National R&D Program (국가 연구개발사업의 경제성분석 방법론 고찰 : 가치평가를 중심으로)

  • Rim, Myung Hwan
    • Journal of Information Technology Applications and Management
    • /
    • v.21 no.4_spc
    • /
    • pp.345-359
    • /
    • 2014
  • Technological, policy and economic factors are both important variables in maximizing the results of a national R&D program and key indicators in evaluating an R&D program's eligibility for financial support. Economic analysis, in particular, is used when selecting R&D programs, setting priorities, and estimating economic effects. This paper examines a series of methodological issues related to the economic analysis of national R&D programs within the framework of the current preliminary feasibility evaluation system, and proposes alternative approaches to each of the issues discussed. The issues include the definition of R&D valuation and establishment of valuation factors; estimation of sales attributable to R&D investment; assessment of the total economic value of R&D as intellectual assets; estimation of R&D benefits and assumption of related to sales; and the application of discount rates based on the weighted average cost of capital. Finally, this study presents directions for future research on analytical procedures and methods of improving the reliability of the results of economic analysis within the national technology planning system.

Development on Benefit Indicators of Economic Evaluation of Agricultural Irrigation and Drainage Project -A Case Study between Korea and Japan- (한국 농업 관개배수사업의 경제성 평가를 위한 지표 개발 -한국과 일본의 사례를 중심으로-)

  • Baek, Seung-Woo;Jeong, Ahn-Seong
    • Korean Journal of Organic Agriculture
    • /
    • v.21 no.4
    • /
    • pp.501-522
    • /
    • 2013
  • This study has performed comparative analysis on benefit indicators in agricultural irrigation and drainage project cases between Korea and Japan. The irrigation and drainage project with publicity should do economic analysis of direct benefit factors as well as indirect benefit factors. However, traditional economic evaluations are used that benefit factors are lack of consistency and focused on direct benefits. Therefore, the purpose of this study was to develop indicators for the economic evaluation of irrigation and drainage projects. We conducted a case study between Korea and Japan. The resulting benefit factors was divided into direct factors and indirect factors. The direct benefit factors were increase in income, cost savings. The indirect benefit factors were protection of property due to flooding, agricultural promotion, aesthetic improvement. The implications of this study are that the indicators of economic analysis can be evaluated and easily applied. Moreover, these indicators could promote the feasibility of economic analysis.

The Economic Feasibility Analysis of Busan Central Library Construction - For the Four Candidate Sites - (부산대표도서관 건립의 경제적 타당성 분석 - 4곳의 후보지를 대상으로 -)

  • Kang, Hee-Kyung;Chang, Durk-Hyun;Lee, Soo-Sang
    • Journal of Korean Library and Information Science Society
    • /
    • v.45 no.4
    • /
    • pp.409-428
    • /
    • 2014
  • The purpose of this study is to analyze the economic feasibility of Busan Regional Central Library. The four candidate sites were included for the analysis. To achieve the purpose of this study, we applied three types of indices such as Benefit-Cost analysis, Net Present Value, and Internal Rate of Return. We used CVM(Contingent Valuation Method) to calculate the benefit; we conducted two investigations to calculate WTP, which are for pretest and for main survey. From results of pretest, we designed five optimal prices. On the basis of them, main survey was accomplished to figure out WTPs for four candidate sites. The results show that four candidate sites were all feasible from an economic point of view. Of these, the Busan Citizen Park site got the highest point of B/C ratio.

A Study on the Economic Feasibility of 4-bed Rooms in Public Hospitals (공공병원의 4인병실 도입에 따른 경제적 타당성에 관한 연구)

  • Kwon, Soonjung;Chai, Choul Gyun;Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.20 no.3
    • /
    • pp.41-48
    • /
    • 2014
  • Purpose: At the moment, a lot of Public Hospitals in Korea have adopted 5 or 6 bedrooms as a standard multi-bedroom type. However 5-6 bedrooms have many problems related to inpatient satisfaction and nosocomial diseases. Therefore 4 bedroom is under considering for standard multi-bed room in Public Hospitals in Korea. This paper tries to prove that adoption of 4 bedroom in Public Hospitals has nothing to do with economic loss which is now an obstacle in adopting 4 bedrooms. Methods: 3 Methods have been used in this paper. 1) Comparative analysis between medical insurance fee and service cost for hospitalization has been conducted through literature survey. 2) Scenario analysis has been used for the estimation of inpatient number when 4 bedrooms are adopted in Public Hospitals. 3) Relation analysis between profit and proportion of 4 bedroom in Public Hospitals. Results: Adoption of 4 bedroom as a standard multi-bedroom in Public Hospitals has been proved to have nothing to do with the economic loss of hospitals. Implications: It is necessary to introduce and expand 4 bedrooms instead of 5-6 bedrooms in hospitals for the upgrade of hospital environment and easy control of cross infection in inpatient bedrooms.

Economic Feasibility Analysis for P2G Using PEM Water Electrolysis (PEM 수전해를 이용한 P2G에 대한 경제적 타당성 분석)

  • JEONG, SEONJU;CHOI, NAK HEON;MOON, CHANGHWAN;MOON, SANGBONG;LIM, HANKWON
    • Journal of Hydrogen and New Energy
    • /
    • v.28 no.3
    • /
    • pp.231-237
    • /
    • 2017
  • With worldwide efforts to increase the portion of renewable energy for $CO_2$ reductions, a lot of attention has been paid to P2G (power-to-gas) in Europe and Japan to efficiently utilize the surplus electricity. In this paper, economic feasibility analysis has been carried out for P2G using PEM water electrolysis by reflecting current economic status in Korea. In addition, efficiency and electricity price required to be competent in Korean market were provided. Based on cash flow diagrams, unit production costs for $H_2$ and $CH_4$ were estimated and profitability of P2G using PEM water electrolysis was analyzed.

Review of the Improvement Plans on Catenary Systems for Speed Increase in Gyeongbu High-Speed Line

  • Eum, Ki Young;Yun, Jangho;Lee, Kiwon;Kim, Jung Hwan
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.64-68
    • /
    • 2013
  • In recent years, the speed of a train has been recognized as one of the important factors to determine the competitiveness as a mean of transportation. In line with this, infrastructure improvements and enhancements are being made with increases in the speed of train. Accordingly, there is a need to establish plans for infrastructure improvements through a comprehensive analysis of signals, track/civil engineering, catenary and environment, etc. to improve the speed of a train of high-speed train service sections in Korea. This study proposes improvement plans for catenary systems by investigating the possibility of improvements through performance analysis of catenary equipment by speed increase based on the analysis on catenary systems in Gyeongbu high-speed line, and analysis the applicability of catenary improvements and economic feasibility.

Financial Analysis and Validity Study for the Introduction of Liquid Hydrogen in Changwon City (창원시 액화수소 도입에 따른 재무성 분석 및 타당성 검토)

  • KANG, BOO MIN;JEONG, CHANG-HOON;HA, SEUNG WOO;JIN, HONG-DEOK;KIM, HAK-MIN;JEONG, DAE-WOON
    • Journal of Hydrogen and New Energy
    • /
    • v.33 no.4
    • /
    • pp.293-300
    • /
    • 2022
  • The Changwon city which announced 2040 hydrogen policy vision is planning to establish the new hydrogen-centered city. The building of plant which is available to produce the 5 ton/day of liquid hydrogen is promoted as one of the projects in order to achieve the vision. However, the analysis in terms of local economic and environmental aspects is insufficient because this liquid hydrogen plant is the first in Korea. Therefore, in this study, the financial feasibility of the liquid hydrogen plant project was analyzed by reviewing the benefits of liquid hydrogen supply and environmental improvement, and the feasibility of this project has been investigated which is being built based on the hydrogen industrial plan of Changwon city.

Economic Analysis of Zero Energy Building in South Korea - focusing on Cost-Benefit analysis considering Social Cost - (공사비 변화에 따른 제로에너지건축물 경제성 분석 - 사회적비용을 고려한 비용편익 분석을 중심으로 -)

  • Kim, Jae-Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.147-157
    • /
    • 2020
  • With the increasing obligation to reduce greenhouse gas emissions to the building sector, the government has been gradually expanding its obligation to zero-energy buildings since 2020. Since the ZEB certification took effect in 2017, 48 preliminary and main certifications have been completed as of March 2019, and most of them are public buildings or even certified, but have earned Grade 5 of ZEB. This means that compared with the number of annual building permits registered in Korea, the figure is insignificant, and that it receives little if not mandatory. Therefore, this study investigated empirical cases of ZEB additional construction cost and conducted cost benefit analysis according to changes in ZEB additional construction cost based on a preliminary feasibility analysis project recently conducted by the KDI. In addition, considering the public buildings, the social costs were considered, and the cost-benefit analysis method was the same as the KDI's preliminary feasibility analysis method. The analysis shows that if the ratio of ZEB additional construction cost is more than 5 percent, it is analyzed that there is no economic feasibility, and considering that the ratio of additional construction cost in the cases of ZEB in Korea is 17 percent to 38 percent, it will not be easy to obtain ZEB certification in terms of cost. Finally, to narrow these differences in cost and economic aspects, the overseas low energy and ZEB incentive examples proposed measures such as the concept of subsidy payment in Illinois and the compensation of social costs to private ZEB.

Economic Feasibility Analysis of the Metropolitan Area Green Heat Project (수도권 그린히트 프로젝트의 경제적 타당성 분석)

  • Kim, Sang-Kee;Kim, Lae Hyun;Yoo, Seung-Hoon
    • Journal of Energy Engineering
    • /
    • v.24 no.1
    • /
    • pp.32-41
    • /
    • 2015
  • The Metropolitan Area Green Heat Project (MAGHP), which collects unused heat gathered from power plants, steel works, landfills in western Metropolitan area and distribute it to integrated energy business (IEB) companies, is proposed for the purpose of enhancing energy efficiency and providing low-price heat for IEB companies. Therefore, in order to decide on whether to initiate the MAGHP, the economic feasibility analysis of the project is widely demanded. This paper attempts to consider and measure four economic benefits: heat supply benefit, production cost reduction benefit, greenhouse gas mitigation benefit, and air quality improvement benefit. In addition, the paper tries to conduct the economic feasibility analysis. The project requires three-year investment and thirty-year operation. Three important findings emerge from the analysis. First, its net present value is computed to be 1,269 billion won and more than zero. Second, its benefit/cost ratio is calculated to be 1.72 and bigger than 1.0. Third, its internal rate of return is estimated to be 24.26% and larger than the social rate of return, 5.5%. In conclusion, the MAGHP is socially profitable and should be conducted immediately.