Review of the Improvement Plans on Catenary Systems for Speed Increase in Gyeongbu High-Speed Line |
Eum, Ki Young
(HSR System Research Team, KRRI)
Yun, Jangho (HSR System Research Team, KRRI) Lee, Kiwon (HSR System Research Team, KRRI) Kim, Jung Hwan (HSR System Research Team, KRRI) |
1 | Korea Railroad Research Institute, "Report on the overall high-speed rail infrastructure and interface research", 2002. |
2 | Korea Railroad Research Institute, "Development of improved technology of the line system for improving speed", 2005. |
3 | Korea Rail Network Authority, "Final report on plans for establishment of signal system by stage according to the speed-up of railway construction lines", 2011. |
4 | Korea Rail Network Authority, "Report on the design of Gyeongbu high-speed line(Step 1, Step 2) ", 2006. |
5 | Korea Railroad Research Institute, "Final report on development of technologies for rail system improvement for speed increase of existing lines(4thyears)", 2005. |
6 | Seoyeong ENG, "Study analysis in the field of track by improving scheduled speed", 2011. |
7 | Korea Railroad Research Institute, "Report on reinforcement cost research of infrastructure by improving operating speed of high-speed train", 2010. |
8 | Overseas Railway Technology Cooperative, "Speed increase of shinkansen", P11-46, 2008. |