Case Study Research in Earthwork Site Digitization for Smart Construction (스마트 건설을 위한 토공현장 디지털화 적용성 검증)

  • Park, Jae-woo;Kim, Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.5
    • /
    • pp.529-536
    • /
    • 2019
  • Recently, various efforts have been tried in the construction industry to improve productivity by applying the fourth industrial revolution technology. Among the various technologies, researches for the automation and digitization of earthworks are being carried out steadily. As the interest in the benefits of digitalization of the earthwork field has increased, there have been more cases of technology development and application for digitalization of the earthwork field. However, there is not enough case study to present the analysis results of application cases. The purpose of this study is to verify the feasibility of applying the digitization technology of the earthwork in actual worksite. In order to digitize the worksite terrain, it is required the process of field measurement, measurement data registration, earthwork information input, and analysis cell generation. Particularly, it is possible to achieve information-enabled digitization rather than digitalizing only the shape through the input of the earthwork information and the analysis cell generation. By using the digital information of the earthwork field, it is possible to visually recognize the change of the earthwork field, so that it is expected to enhance the worker 's understanding and to be highly applicable to the management work. It is expected that the digital technology of earthwork site will be able to know the precise amount of volume change of the earthwork numerically, and it will be highly applicable to construction management.

A Study on the Correlation Analysis between the Daily Earthwork Volume and Fine Dust Concentration

  • Dong-Myeong, CHO;Ju-Yeon, LEE;Tae-Hwan, JEONG;Woo-Taeg, KWON
    • Journal of Wellbeing Management and Applied Psychology
    • /
    • v.6 no.1
    • /
    • pp.1-7
    • /
    • 2023
  • Purpose: Fine dust is classified as a group 1 carcinogen and poses a significant environmental problem that urgently requires improvement to protect the environmental rights of citizens. Given the difficulty of implementing measures to reduce overseas sources of fine dust, it is essential to first devise specific measures to address domestic emission sources. As such, this study aims to analyze the correlation between earthwork volume control and fine dust concentration as preliminary management measures to reduce the impact of scattering dust at construction sites. Based on real-time air quality information, field management measures will be presented to mitigate the effects of dust emissions. Research design, data and methodology: As examples, we selected construction sites that had recently undergone small-scale environmental impact assessment consultations. The standard earthwork volume was classified into grades using 20% intervals, and we applied AERMOD to predict the weighted concentration of fine dust based on the earthwork volume class and analyzed its correlation. Results: The results of this study demonstrate a strong correlation between earthwork volume and fine dust concentration. By utilizing the correlation analysis between earthwork volume and fine dust concentration on-site, this finding can be utilized as an effective fine dust management plan. Conclusions: This involves determining the daily earthwork intensity based on real-time air quality information and implementing measures to reduce scattering dust.

Development of Simulation Model for Earthwork Considering Factors Affecting Construction Productivity (생산성 영향요인을 고려한 건설현장 토공사 시뮬레이션 모델 개발)

  • Sa, Sewon;Lee, Chanwoo;Cho, Hunhee;Kang, Kyeong-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.149-150
    • /
    • 2021
  • Earthwork is the starting work of construction process, which has the greatest impact on the productivity of the construction project among the works. However, it is difficult to derive accurate productivity becuase the earthwork plan is affected by geological condition of the jobsite. Therefore, a simulation model for productivity analysis of earthwork was developed using CYCLONE modeling method in this study. In this paper, simulation model was made considering the impact factors of earthwork productivity. The proposed model can be utilized for sensitivity analysis in future studies.

  • PDF

Development of Framework for Digital Map Time Series Analysis of Earthwork Sites (토공현장 디지털맵 시계열 변화분석 프레임워크 기술개발)

  • Kim, Yong-Gun;Park, Su-Yeul;Kim, Seok
    • Journal of KIBIM
    • /
    • v.13 no.1
    • /
    • pp.22-32
    • /
    • 2023
  • Due to the increased use of digital maps in the construction industry, there is a growing demand for high-quality digital map analysis. With the large amounts of data found in digital maps at earthwork sites, there is a particular need to enhance the accuracy and speed of digital map analysis. To address this issue, our study aims to develop new technology and verify its performance to address non-ground and range mismatch issues that commonly arise. Additionally, our study presents a new digital map analysis framework for earthwork sites that utilizes three newly developed technologies to improve the performance of digital map analysis. Through this, it achieved about 95% improvement in analysis performance compared to the existing framework. This study is expected to contribute to the improvement of the quality of digital map analysis data of earthworks.

Accuracy Analysis of Earthwork Volume Estimating for Photogrammetry, TLS, MMS (토공사 계측 방식(Photogrammetry, TLS, MMS)별 토공량 산정 정밀도 분석)

  • Park, Jae-Woo;Yeom, Dong-Jun;Kang, Tai-Kyung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.4_2
    • /
    • pp.453-465
    • /
    • 2021
  • Recently, photogrammetry, TLS(Terrestrial Laser Scanner), MMS(Mobile Mapping System)-based techniques have been applied to estimate earthwork volume for construction management. The primary objective of this study is to analyze the accuracy of earthwork volume estimating between photogrammetry and TLS, MMS that improves the traditional surveying method in convenience, estimating accuracy. For this, the following research works are conducted sequentially; 1) literature review, 2) core algorithm analysis, 3) surveying data acquisition using photogrammetry, TLS, MMS, 4) estimated earthwork volume comparison according to surveying method. As a result of the experiment, it was analyzed that there were earthwork volume errors of 1,207.5m3 (14.03%) of UAV-based digital map, 391.5m3(4.55%) of UAV, TLS integrated digital map, and 294.9m3(3.43%) of UAV, MMS integrated digital map. It is expected that the result of this study will be enormous due to the availability of the analyzed data.

Information Modeling for Construction Equipment Interface in Earthwork (토공작업 건설장비 정보 인터페이스를 위한 정보 모델링)

  • Moon, Sungwoo;Cho, Kyeongsu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.699-706
    • /
    • 2015
  • Earthwork is executed to provide a space for facility structures, and plays an important role in the construction operation. Contractors usually put a combination of construction vehicles to execute the earthwork operation. These construction vehicles need to interface with each other for productivity improvement. The objective of this study is to prototype an earthwork supportive system for information interface between construction vehicles. The study is conducted in a sequence of 1) analysis of information interface during earthwork; 2) data modeling of earthwork attributes; and 3) development of a prototype for the earthwork supportive system. The output screen images of the prototype show that the earthwork supportive system can improve communication between construction vehicles by facilitating information interface during earthwork.

A Study on the Predictional Model for Accuracy of Earthwork Calculation by Digtal Terrain Model (수치지형모델에 의한 토공양계산 정확도의 예측모델에 관한 연구)

  • 오창수
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.5 no.1
    • /
    • pp.49-58
    • /
    • 1987
  • The use of digital terrain model has been enlarged in calculating the earthwork due to the development of aerial photogrammetry. The calculation of earthwork plays a major role in plan or design of many civil engineering projects, and thus it has become very important to advance the accuracy of earthwork calculation. In this study, I have made an analysis of influences which DTM makes on the height accuracy of data ; on the basis of the analysis, we can develop the predictive model formula of profile shape coefficients by which the accuracy of earthwork can he preestimated in practical design according to data density of terrain, making thereby good contribution to the calculation of both earthwork amount and its expenses. This study shows that the accuracy of earthwork is more affected by the distances of cross-sections than by data density and that the effects by the standard errors of height decrease in proportion as the distances of cross-sections are great It also shows that when the prediction model formula of profile shape coefficients is applied to ordinary cases, the differences between the predicted earthwork errors and the errors by ordinary est imation are at 0.8374~3.1437$cm^3$/m, on flat terrain and 1.5628~6.967$cm^3$/m, on mountainous terrain-so little as to be ignored ; thus it can be safely ascertained that the accurate earthwork errors can be predicted applying the prediction model formula made in this study.

  • PDF

Structural Analysis of Earthwork Productivity Influence Factors Using Fuzzy DEMATEL Method (Fuzzy DEMATEL 방법을 활용한 토공사 생산성 영향요인 구조분석)

  • Lee, Chanwoo;Kim, Hyeonmin;Kim, Hyungjun;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.751-760
    • /
    • 2023
  • Enhancing productivity in earthwork projects is crucial, significantly affecting both time and cost efficiencies. However, existing research in this domain predominantly relies on qualitative data and methodologies, which may not suffice given its critical significance. This study employed the fuzzy DEMATEL method to conduct a structural analysis of variables affecting productivity in construction projects. The findings reveal that plan changes possess the most substantial overall influence on earthwork productivity, with a comprehensive strength rating of 4.58. Additionally, it was observed that precipitation data exerted the most pronounced positive impact, with a rating of 0.48. These insights are anticipated to aid in identifying and prioritizing areas for productivity enhancement in construction projects.

Development of Determination System for Optimal Combination of Earthwork Equipments (토공사를 위한 건설장비 투입 최적 조합 산정 시스템 개발)

  • Park, Jae-Woo;Yeom, Dong-Jun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.6_2
    • /
    • pp.957-969
    • /
    • 2020
  • The primary objective of this study is to develop a determination system for an optimal combination of earthwork equipment that improves the traditional way in convenience, prediction accuracy, and productivity. For this, the following research works are conducted sequentially; 1)literature review, 2)technology development trend analysis, 3)develop a determination system for the optimal combination of earthwork equipment, 4)simulation of a developed system. As a result, core considerations are deducted for the development of a determination system. Furthermore, site simulation is performed using a developed system. Site simulation result, Cluster 1(R1200LC 7㎥, CAT 775G 65ton×2) was selected from 6 clusters because of its production cost (₩491/㎥). It is expected that the application range and impact on the construction industry will be enormous due to the availability of the developed system.

A Roadmap Establishment for the Acceptance of Land Development Earthwork Construction Automation Technology (단지조성 토공분야 건설 자동화 기술 도입을 위한 로드맵 수립)

  • Im, Dong Heui;Yun, Hee-Cheon;Kim, Seok-Kyu;Seo, Jongwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.893-901
    • /
    • 2019
  • Land development is an essential process to provide lands for housing, industrial, and tourism complex. The development and application of construction automation technology in land development construction are, however, not matured yet. Since land development requires massive investment in terms of cost and effort, the benefits of implementing earthwork construction automation technology could also be enormous. As such, the deployment of advanced technology needs to be assessed. In this paper, by investigating domestic and international advanced earthwork technology, 8 candidate technologies to be developed is derived. These technologies are then prioritized using AHP and web-based survey that distributed to experts in the field of civil and infrastructure. As a result, advanced earthwork fleet management platformization and tele-operation systems for unmanned earthwork are identified as the top priority. Besides through sensitivity analysis, the trends of the technology rank by the weight distribution of the evaluation factor is investigated. Consequently, the research and development processes for the earthwork construction automation technology in land development are explored and based on the results, the research and development road map plan is established.