1 |
Akhavian, R. and Behzadan, A. (2013). "Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining." Journal of Construction Engineering and Management, Vol. 139, No. 11, pp. 1-11.
DOI
|
2 |
Choi, J. H., Lee, D. H., Kim, S. H. and Kim, S. K. (2010). "Factors affecting selection & combination of earthwork equipments." Proceedings of Korea Institute of Building Construction, Vol. 10, No. 1, pp. 201-205.
|
3 |
Goviadan, K. and Michael, V. (2000). "Development of an experience database for truck loading operations." Journal of Construction Engineering and Management, ASCE, Vol. 126, No. 3, pp. 201-209.
DOI
|
4 |
Hwang, Y. J., Won, S. K, Han, C. H. and Kim, S. K. (2006). "A earth-volume estimate model by system dynamics." Proceedings of Korea Institute of Construction Engineering and Management, pp. 467-470.
|
5 |
Kim, S. K. (2014). "A multi-agent based cooperation system for an intelligent earthwork." Journal of Korean Society of Civil Engineers, Vol. 34, No. 5, pp. 1609-1623.
DOI
|
6 |
Kwon, J. B., Cho, D. G., Cho, H. H. and Kang, K. I. (2012). "Automatic measurement of construction equipment efficiency using a 11-Axis composite sensor." Proceedings of the Spring Conference on Korea Institute of Building Construction, Vol. 12, No. 1, pp. 59-60.
|
7 |
Lee, C. J., Lee, G. and Sim, J. K. (2013). "Analysis of the technology adoption impact factors for automated construction equipment." Journal of Korea Institute of Construction Engineering and Management, Vol. 14, No. 2, pp. 56-64.
DOI
ScienceOn
|
8 |
Mawdesley, M. J., Al-Jibouri, S. H. S., Askew, W. H. and Patterson, D. E. (2002). "A model for the automated generation of earthwork planning activities." Construction Innovation, Vol. 2, No. 2, pp. 249-268.
DOI
|
9 |
Seo, H. B., Jung, W. J., Kim, K. M. and Kim, K. J. (2006). "An analysis on the data distribution of construction equipment operations -A Case on Muck Hauling System-." Journal of Korean Society of Civil Engineers, Vol. 26, No. 4D, pp. 661-670.
|
10 |
Korea Institute fo Construction Technology (KICT) (2015). Standard of construction estimate (in Korean).
|
11 |
Won, S. K., Kim, S. K. and Han, C. H. (2007). "A combination model of earthwork equipment using system dynamics." Journal of Korea Institute of Construction Engineering and Management, Vol. 8, No. 4, pp. 194-202.
|