Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

A Case Study of SE and EVMS Techniques Application on Surion Helicopter R&D Program (수리온헬기 개발사업에서 시스템 엔지니어링 및 사업성과관리 기법 적용 사례연구)

  • Byun, Hyung Kyun;Lee, Sang Woo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.51-62
    • /
    • 2012
  • The System Engineering(SE) and the Earned Value Management System(EVMS), as parts of the scientific project management methodology, have been applied to Surion Helicopter R&D Program. The concept and application process of SE methodology, requirements management and applications output by DOORS program are described in this study. The concept and application process of EVMS, analysis results of schedule/cost variance for Surion RF equipment are also discussed in this study. Though the Surion R&D program is still on-going, it is found that the measures of effectiveness of SE and EVMS applications are verified.

A Suggestion for Merging Quality Management into Software Project Schedule Management (소프트웨어개발 일정관리와 품질관리의 통합 방안)

  • Paek, Seon-Uck;Han, Yong-Soo;Hong, Sug-Won
    • Information Systems Review
    • /
    • v.6 no.2
    • /
    • pp.195-208
    • /
    • 2004
  • In this paper we propose a new software project development management model incorporating quality management to schedule management. Though many efficient techniques such as code review and inspection are used to remove defects, the effect of defect removal time on project schedule hasn't been studied much. However, poor quality management has an important effect upon overall schedule and sometimes software projects fails due to it. Thus, quality management and schedule management should be considered together and we need to reflect the time to maintain software quality into the schedule management. For the proposed model we introduced "Quality Value" representing the needed time to remove software defects. We assume PSP/TSP to gather the needed data for quality value. The proposed model can be used to predict the effect of software defects on schedule in advance and to prevent schedule lag.

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

The Establishment of an Activity-Based EVM - PMIS Integration Model (액티비티 기반의 EVM - PMIS 통합모델 구축)

  • Na, Kwang-Tae;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.199-212
    • /
    • 2010
  • To establish an infrastructure for technology and information in the domestic construction industry, several construction regulations pertaining to construction information have been institutionalized. However, there are major problems with the domestic information classification system, earned value management (EVM) and project management information system (PMIS). In particular, the functions of the current PMIS have consisted of a builder-oriented system, and as EVM is not applied to PMIS, the functions of reporting, analysis and forecast for owners are lacking. Moreover, owners cannot confirm information on construction schedule and cost in real time due to the differences between the EVM and PMIS operation systems. The purpose of this study is to provide a framework that is capable of operating PMIS efficiently under an e-business environment, by providing a proposal on how to establish a work breakdown structure (WBS) and an EVM - PMIS integration model, so that PMIS may provide the function of EVM, and stakeholders may have all information in common. At the core of EVM - PMIS integration is the idea that EVM and PMIS have the same operation system, in order to be an activity-based system. The principle of the integration is data integration, in which the information field of an activity is connected with the field of a relational database table consisting of sub-modules for the schedule and cost management function of PMIS using a relational database management system. Therefore, the planned value (PV), cost value (CV), actual cost (AC), schedule variance (SV), schedule performance index (SPI), cost variance (CV) and cost performance index (CPI) of an activity are connected with the field of the relational database table for the schedule and cost sub-modules of PMIS.

Work Management Model to Integrate Schedule and Bill of Quantit (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • 박홍태;박찬정
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

Work Management Model to Integrate Schedule and Bill of Quantity (산출내역서.공정 통합관리 모형 구축에 관한 연구)

  • Park, Hong-Tae;Park, Chan-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF