• Title/Summary/Keyword: Earned Schedule

Search Result 51, Processing Time 0.029 seconds

A Control Account Planning Using Material Requirement Planning in Earned Value Project (MRP기법을 이용한 EV프로젝트의 관리계정계획)

  • Kim Soo-Yong;Lee Yang-Ho;An Dong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.114-122
    • /
    • 2002
  • Earned Value Management System(EVMS) is a management technique that is emerging as a valuable tool in the management of all projects, including and in particular construction projects. It is based on C/SCSC that has been released by the U.S. Department of Defense (DOD) in 1967. In a project that employs the earned value management concept, the project's measurable performance plans will be formed with the creation of CAPs. The formation of CAPs is a planning step necessary to form an earned value baseline. In this paper, a method is proposed to form CAPs using Material Requirement Planning(MRP) that is also known as a useful planning tool in the manufacturing industry. An application to a real project has been carried through workpackaging model.

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

A Study on the Connection Model for Attribute Code of Earned Value Management System (정보화된 EVMS 구축을 위한 속성코드 연계모형 구성 연구)

  • Lee, Woo-Sik;Kang, Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.362-365
    • /
    • 2004
  • This study suggests an attribute code system for earned value management system (EVMS). The attribute code system can be used for integrating various EYM data from construction schedule and cost. If the suggested attribute code is used in EVM, sorting and typical classifying of EVM data is possible in the computerized system. Those functions are an effective management tool for construction manager comparing with other EVM tools.

  • PDF

A Study on the EVMS for successful application to KHP program (한국형 헬기 시제품 개발을 위한 EVMS 적용방안에 관한 연구)

  • We, Oh-Gie;Chung, Ho-Su
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.1
    • /
    • pp.73-89
    • /
    • 2006
  • In this paper, EVMS procedure for KHP program is presented. Research and development of a defense system as a long lead program has a high probability of cost growth due to the uncertainty and risk. Therefore, meeting schedule, technical performance and preventing excessive cost overrun are the main concerning point to successful research and development program. EVMS(Earned Value Management System) is a program management system using earned value to control cost, schedule and technical performance. In order to control cost and schedule and to meet technical performance requirements of the KHP research and development program, it is necessary for us to adapt EVMS to the program.

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

A Study oil the Application of EVMS in Defense R&D Programs (국방연구개발 사업에 EVMS 적응방안 연구)

  • Choi Seok-Cheol;Kim Jong-Pil
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.8 no.1 s.20
    • /
    • pp.62-68
    • /
    • 2005
  • In this paper, we review the general technique of Earned Value Management System(EVMS) which is the integrated management for cost, schedule and performance, and suggest an application of the integrated management of cost and schedule in the research and development(R&D) programs for defense acquisition.

Contingency Estimation Method based on Stochastic Earned Value Management System (추계적 EVMS 기반 예비비 산정 방법론)

  • Gwak, Han-Seong;Choi, Byung-Youn;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Analysis of EVMS Implementation to Korean Defence R&D Project (국방무기체계 연구개발사업의 EVMS 적용실태 분석)

  • Min, Won-Bea;Kang, Seok-Joong;Song, Woon-Ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.1
    • /
    • pp.242-250
    • /
    • 2010
  • EVMS(Earned Value Management System) is a project management method for analysis of current state of project and estimation of future state by the periodic tracking of schedule and value that activated by the project manager of government and contractor. Some countries, such as U.S.A and Austria, require the use of an EVMS for all major defense R&D project and many cases have proved that EVMS ensures that cost, schedule, and technical aspects of the contract are truly integrated and estimated, and actual progress of the project can be identified. However, the recent implementation of EVMS on Korean defense R&D project has shown number of challenges. In this paper, we defind the cancept of EVMS and analyzed EVMS implementation m order to conduct their problem.