• Title/Summary/Keyword: EVMS (Earned Value Management System)

Search Result 43, Processing Time 0.024 seconds

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.

A Study on the EVMS for successful application to KHP program (한국형 헬기 시제품 개발을 위한 EVMS 적용방안에 관한 연구)

  • We, Oh-Gie;Chung, Ho-Su
    • Journal of the military operations research society of Korea
    • /
    • v.32 no.1
    • /
    • pp.73-89
    • /
    • 2006
  • In this paper, EVMS procedure for KHP program is presented. Research and development of a defense system as a long lead program has a high probability of cost growth due to the uncertainty and risk. Therefore, meeting schedule, technical performance and preventing excessive cost overrun are the main concerning point to successful research and development program. EVMS(Earned Value Management System) is a program management system using earned value to control cost, schedule and technical performance. In order to control cost and schedule and to meet technical performance requirements of the KHP research and development program, it is necessary for us to adapt EVMS to the program.

A Control Account Planning Using Material Requirement Planning in Earned Value Project (MRP기법을 이용한 EV프로젝트의 관리계정계획)

  • Kim Soo-Yong;Lee Yang-Ho;An Dong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.114-122
    • /
    • 2002
  • Earned Value Management System(EVMS) is a management technique that is emerging as a valuable tool in the management of all projects, including and in particular construction projects. It is based on C/SCSC that has been released by the U.S. Department of Defense (DOD) in 1967. In a project that employs the earned value management concept, the project's measurable performance plans will be formed with the creation of CAPs. The formation of CAPs is a planning step necessary to form an earned value baseline. In this paper, a method is proposed to form CAPs using Material Requirement Planning(MRP) that is also known as a useful planning tool in the manufacturing industry. An application to a real project has been carried through workpackaging model.

A Study of the Best Performance Index for Estimate at Completion Forecasting Model on the Earned Value Management System(EVMS) (EVMS 최종공사비 예측 모델 최적성과지수에 대한 고찰)

  • Kim Seon-Gyoo;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.101-107
    • /
    • 2000
  • On 1 July, 2000, the Ministry of Construction and Transportation announced the Earned Value Management System(EVMS) will be applied in public sector soon. However the arguments over the EVMS applied to our unique construction environment still exist and create strong concerns and worries among some experts it would be another mistakes proposed by the government. We do know the EVMS comes from C/SCSC which was first released by the United States Department of Defense in December 1967, and proved very powerful and efficient project management tool from a lot of practices. Although it is an excellent tool, we can not ignore our many experienced failures appling foreign system due to the differences of construction culture and law between the Korean and US construction industries. The purpose of the EVMS's success in Korea, therefore, this paper tests and proves the EVMS's adaptability and credibility to our construction environment by EAC model, that is one of the most important functions in the EVMS, using very scare EV data of the Korean construction projects.

  • PDF

A Study on the Improvement of Construction Progress Measurement Based on Earned Value Concept (EV기반 RC 공사 진도율산정 개선방안)

  • Choi Tae-Young;Jung Hye-Won;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.307-310
    • /
    • 2003
  • Construction projects include risks due to uncertain factors, so it's important to repeatedly evaluate the performance of on-going work in all aspects of the projects. But construction projects are usually managed focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. Recently many researches about cost and schedule integration methods are in progress according to the increasing of interest and EVMS (Earned Value Management System). Though researchers comment and propose many methods, it's hard to find example to apply it to the real project. So, the purpose of this study is to improve a method of construction Progress measurement Based on Earned value Concept by integration of cost and schedule management. It investigates the previous studies, interviews and performs a case study.

  • PDF

An Exploratory Study of EVMS Environment Factors and their Impact on Cost Performance for Construction and Environmental Projects

  • Aramali, Vartenie;Sanboskani, Hala;G. Edward Jr., Gibson;Asmar, Mounir El
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.170-178
    • /
    • 2022
  • A high-performing Earned Value Management System (EVMS) can influence project success and help stakeholders meet project objectives. Although EVMS processes are well-supported by technical guidelines and standards, project managers often face challenges related to the project culture, team, resources, and business practices that make up the project environment within which an EVMS is being used. A comprehensive literature review revealed a lack of a data-driven and consistent assessment frameworks that can gauge the environment surrounding EVMS implementation. This paper will discuss the EVMS environment of construction and environmental projects, and examine its impact on cost performance. The authors used a multi-method approach to identify 27 environment factors that make up the EVMS environment, assessing them on 18 construction and environmental projects worth over $2 billion of total cost. Research methods employed include: (1) a literature review of more than 300 references; (2) a survey of 294 respondents; and (3) remote research charrettes with more than 60 participating expert practitioners. Culture (one of the identified environment categories) was found to be relatively more important in terms of its impact on the EVMS environment, followed by people, practices, and resources. These exploratory results show statistically significant differences in cost performance between completed projects with either a good or poor environment, for the sample projects. Key environment factors are outlined, and guidance is provided to practitioners around how to set up an effective EVMS environment in a construction or environmental project to inform decision-making and support achieving the project cost objectives successfully.

  • PDF

A Study on the Connection Model for Attribute Code of Earned Value Management System (정보화된 EVMS 구축을 위한 속성코드 연계모형 구성 연구)

  • Lee, Woo-Sik;Kang, Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.362-365
    • /
    • 2004
  • This study suggests an attribute code system for earned value management system (EVMS). The attribute code system can be used for integrating various EYM data from construction schedule and cost. If the suggested attribute code is used in EVM, sorting and typical classifying of EVM data is possible in the computerized system. Those functions are an effective management tool for construction manager comparing with other EVM tools.

  • PDF

A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task (작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발)

  • Park, Hong-Tae;Yang, Keum-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1281-1286
    • /
    • 2009
  • Our government operates earned value management system (EVMS)of construction schedule and cost for improving earned management system of the construction projects. but There is two unification Method construction schedule and cost to estimate construction progress currently. This weight a staff work. therefore this study present unification method which operate integrate schedule and cost by using work task. In order to inflect verification and model of schedule and cost, this study develop prototype of EVMS.

Valuation of Benefits from the Adoption of Project Information Management System

  • Kyong Ju Kim;Kyoungmin Kim;Ki Yong Kang;Geon Hee Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1548-1552
    • /
    • 2009
  • In the construction industry, IT has been an alternative for the enhancement of productivity and technical advances through a paradigm shift. While it has been recognized that the IT system will have a substantial influence on the industry, a quantitative valuation has been very limited. This paper has chosen EVMS (Earned Value Management System), which supports the integrated management of cost and schedule by utilizing IT tools, and which is the largest trend in the construction IT industry in Korea, in order to suggest an analysis model for the valuation of IT. The CVM (Contingent Valuation Method) is used to quantitatively measure intangible value of IT application. Then, a valuation and analysis model were suggested for the quantitative valuation of the effect of IT adoption. In terms of willingness to pay for EVMS, the expected benefits from the adoption of EVMS were US$ 584.52 per man annually. This research should be helpful for construction companies evaluating their investment to Project Management Information System.

  • PDF

A Study oil the Application of EVMS in Defense R&D Programs (국방연구개발 사업에 EVMS 적응방안 연구)

  • Choi Seok-Cheol;Kim Jong-Pil
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.8 no.1 s.20
    • /
    • pp.62-68
    • /
    • 2005
  • In this paper, we review the general technique of Earned Value Management System(EVMS) which is the integrated management for cost, schedule and performance, and suggest an application of the integrated management of cost and schedule in the research and development(R&D) programs for defense acquisition.