• 제목/요약/키워드: EPC Management System

검색결과 102건 처리시간 0.026초

EPC시스템에서 UI기반의 소프트웨어에 대한 고찰 (The study of EPC System S/W based on the UI)

  • 황성하;유선일;정진수
    • 시스템엔지니어링학술지
    • /
    • 제6권1호
    • /
    • pp.61-68
    • /
    • 2010
  • Generally EPC management system was simply management concept through the normal S/W. Our LNG Plant R&D Center wanted to the excellent management system from the S/W. So We developed the R&D management S/W and EPC management S/W Built in the Microsoft Project Server. Our system made to the customer Requirements. It was just User Interface protocol. But User Interface has more Weak position, because it makes from the MS Project Servers. Ms Projector server make easy to treat the project on the WBS. EPC parts mixed WBS and normally Ms SQL Database. It has very complicated Structures. Now We planed to make the general Database and Ms Project Server, It' means to the S/W Developer and Schedule Manager ability. We will successfully integrate R&D management system and EPC system and other softwares.

  • PDF

플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발 (Development Of EPC Project Management Procedure Manual System For Plant Project Management)

  • 박범진;이민재
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.487-491
    • /
    • 2006
  • 최근 고도의 산업 사회로 발전함에 있어 산업설비(플랜트) 건설부문이 새로운 성장 엔진으로 발전하고 있으며 타 산업에 부품 및 장비조달, 고용창출, 첨단기술 적용 등을 동해 파급효과가 매우 큰 고부가가치 산업으로 국가 경제성장에 원동력이 되고 있다. 플랜트 산업은 기계, 재료, 화학, 전자, 생물, 지질, 토목 등 여러 가지 요소기술이 복합적으로 적용되고, 엔지니어링, 기자재 제작기술, 컨설팅, 파이낸싱 등 지식 서비스를 필요로 하며, 기자재 및 인력수출이 가능한 차세대 성장산업임에도 프로젝트 수행단계별 업무절차의 정립이 부족하고, 그 적용 또한 체계적이지 못했던 것이 사실이다. 따라서 관련 기술력에 대한 국가차원의 선진화 전략과 체계적인 프로젝트 수행단계별 절차의 수립이 요구되고 있다. 이에 본 논문은 국내외 13개 대형건설회사의 업무절차서를 수집하였고 수집된 업무절차서의 분석을 통해 현재 산업계에서 사용하고 있는 업무절차서의 문제점을 분석하고 개선방안을 도출하였다. 개선방안은 미국 PMI(Project Management Institute)의 프로젝트관리 지식체계의 모태인 PMBOK(Porjcet Management Body Of Knowledge)의 이론을 바탕으로 합리적이고 효율적인 프로젝트관리를 위해 필요한 관리요소들을 도출하였으며, 아울러, 미국 CMAA(Construction Mangement Association of America)의 건설사업관리 업무범위에 대한 정의를 활용 EPC프로젝트의 효율적인 관리를 위해 필요한 관리요소들을 도출하고 표준화를 하여 개선된 전자업무절차시스템을 정립하였다.

  • PDF

X-Rs 와 EPC통합모형의 사례연구 (An Application of the Integrated Model of X-Rs / EPC)

  • 정해운
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2005년도 춘계학술대회
    • /
    • pp.477-484
    • /
    • 2005
  • SPC와 EPC의 통합은 연속공정산업에서 성공적으로 사용된다. 그러나, 이산적인 부품 제조공정의 모니터링과 연속 생산공정 모니터링 양쪽 모두를 포함하는 산업에서의 통합기법을 적용하기 위해서는 실시간 보정과 공정조절 등에 관한 연구가 필요하다. 본 연구에서는 SPC와 EPC의 차이를 비교분석하고, 혼성 산업에서 SPC와 EPC를 성공적으로 통합하여 효율적인 공정관리의 적용 사례를 제시하고자 한다.

  • PDF

플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발 (Development of EPC Business Process Management Model for Improving Plant Project Management)

  • 박범진;이민재;이태식
    • 한국건설관리학회논문집
    • /
    • 제9권5호
    • /
    • pp.149-158
    • /
    • 2008
  • 플랜트 산업은 여러 가지 요소기술이 복합적으로 적용되고, 엔지니어링, 기자재 제작기술, 컨설팅, 파이낸싱 등의 지식서비스를 필요로 하는 차세대 성장동력 산업임에도 불구하고, 국내의 실정은 프로젝트 사업관리가 체계적이지 못했던 것이 사실이다. 따라서 관련 기술력에 대한국가차원의 선진화 전략과 프로젝트 수행단계별 업무절차의 정립이 요구되고 있다. 이에 본 논문은 사업관리 효율증대를 위한 표준화된 업무절차 정립을 목적으로 다음의 연구를 수행하였다. 첫째, 국내외 업무절차서와 관련된 문헌조사 및 12개 대형플랜트건설사의 업무절차서를 수집하였다. 둘째, 수집된 업무절차서의 분석을 통해 현재 산업계에서 사용하고 있는 업무절차서의 문제점을 분석하고 개선방안을 도출하였다. 셋째, 미국 PMI의 프로젝트관리 지식체계의 모태인 PMBOK의 이론과 CMAA의 건설사업환기 업무범위를 활용하고 국제표준화기구가 제정하고 시행하는 ISO 9001:2000 규정을 착용하여 EPC프로젝트의 효율적인 관기를 위해 필요한 EPC수행단계별 21개의 중점관리요소를 포함한 업무절차 매트릭스를 도출하였고, 전문가 자문을 통한 '계획 및 설계단계', '구매조달단계', '시공 및 시운전단계'별 176개의 '주요단위업무'를 도출하였다. 넷째, 도출된 EPC 수행단계별 주요단위업무를 Business Process 관점으로 재설계하고, 전문가 자문과 검증을 통하여 총176개의 업무절차 BPM모델을 개발하였다. 최종단계로, 'EPC 수행단계별 업무절차BPM모델'의 시스템 개발모델을 제안하였다.

공정관리시스템을 위한 SPC와 EPC의 연계 (Combination SPC & EPC for Process Control System)

  • 정해운
    • 대한안전경영과학회지
    • /
    • 제8권6호
    • /
    • pp.119-137
    • /
    • 2006
  • This paper seeks to Combination for Efficient Application of SPC/EPC minimize variability by transferring the output variable to a related process controllable variable, while SPC seeks to reduce variability by detecting and eliminating assignable causes of variation. In the case of product control, a very reasonable objective is to try to minimize the variance of the output deviations from the target or set point. We consider an alternative EPC model with autoregressed disturbance. We compare three control systems; EPC, Cp, SPC combined system with EWMA, CUSUM and Shewhart. This paper shows through simulation that the performance of the integrated model of EPC and SPC, Cp is more preferable than that of EPC.

극한지 자원이송망 EPC단계에서 발생되는 데이터 항목에 관한 기초연구 (A Fundamental Study on Data Item occurred in EPC Stage of Pipeline in Extreme Cold Weather)

  • 김창한;원서경;이준복;한충희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.18-19
    • /
    • 2014
  • As issued the development of energy resources, EPC work process through the IT technology is essential for efficient business management, and systematic management of data generated in this process is needed. In domestic, the research related to system development for the collection and management of construction data detected in the field has been done continuously, but pipeline business target the long-distance in extreme cold weather, almost no cases have been studied up to now. Therefore, this research is aimed to derive the data item for efficient management in EPC Stage of pipeline business in extreme cold weather. WBS system of EPC work are classified easily at two levels, data items can be divided based on the type of document. In the future I will be expected to be the foundation of the systematic management of data generated in the EPC step-by-step of pipeline business.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

추세가 있는 공정에서 이계자기회귀 모형을 이용한 EPC와 EWMA의 통합시스템 (An Integrated System of EWMA and EPC Using Second-order Autoregressed Model in the Process with Trend)

  • 정해운
    • 대한안전경영과학회지
    • /
    • 제7권2호
    • /
    • pp.141-151
    • /
    • 2005
  • EPC seeks to minimize variability by transferring the output variable to a related process input(controllable) variable, while SPC seeks to reduce variability by detecting and eliminating assignable causes of variation. In the case of product control, a very reasonable objective is to try to minimize the variance of the output deviations from the target or set point. We consider an alternative EPC model with second-order autoregressive disturbance. We compare three control systems; EPC, EPC combined with EWMA. This paper shows through simulation that tlhe performance of the integrated model of EPC and EWMA is more preferable than that of EPC.

이계 자기회귀 각란 모형을 고려한 EPC와 SPC의 통합시스템 (An Integrated Model of SPC and EPC with Second Order Autoregressed Disturbance)

  • 정해운
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 춘계학술대회
    • /
    • pp.277-283
    • /
    • 2003
  • EPC seeks to minimize variability by transferring the output variable to a related process input(controllable) variable, while SPC seeks to reduce variability by detecting and eliminating assignable causes of variation. Tn the case of product control, a very reasonable objective is to try to minimize the variance of the output deviations from the target or set point. We consider an alternative EPC model with second-order autoregressed disturbance. We compare three control systems; EPC, EPC combined system with EWMA, CUSUM and Shewhart. This paper shows through simulation that the performance of the integrated model of EPC and SPC is more preferable than that of EPC.

  • PDF

RFID/EPC-IS 네트워크를 이용한 제품 추적 및 인증시스템 구현 (Implementation of Tracking and Authentication system for Product using RFID/EPC-IS network)

  • 신명숙;홍성표;이준
    • 정보처리학회논문지A
    • /
    • 제13A권4호
    • /
    • pp.317-322
    • /
    • 2006
  • RFID 시스템은 최근 다양한 분야로 적용되면서 개발이 급증하고 있다. 특히 RFID 시스템은 공급 업체의 물류분야에서 공급 사슬 관리 시스템의 중추적인 기술로 사용된다. 물류분야에서는 신속하고 정확하게 제품을 파악해야 하는데 제품의 이동으로 인하여 제품의 재고관리를 실시간으로 처리하는데 문제점이 있다. 본 논문에서는 이러한 문제점을 해결하기 위하여 RFID 네트워크의 구조적 기준이 되는 EPC-IS 네트워크를 이용하여 제품의 재고 상태를 실시간으로 파악한다. 또한 위조품이나 도난품을 파악하는 정품인증 서비스를 실시간으로 제공한다. 따라서 본 논문을 통하여 제품의 관리를 실시간으로 처리할 수 있음을 보인다.