• Title/Summary/Keyword: EIA(Environmental Impact Assessment)

Search Result 850, Processing Time 0.023 seconds

Spatial Analysis for the Assessment of Optimum Place of Eco-bridge (생태통로의 최적지 평가를 위한 공간분석)

  • Jeong, Jong-Chul
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.5
    • /
    • pp.697-703
    • /
    • 2011
  • The purpose of this study aims to preserve biodiversity in increasingly fragmented green patches for spatial analysis of planting on the eco-corridors and to optimize the target species, the location, width, cross section of the eco-corridors. It was suggested that eco-corridors should have to planned at early stages of road planning so that the number and locations of eco-corridors in advance. Ecological corridor is the facility to connect two habitats fragmented by road, dam, housing and industrial area. And, everyone agree that ecological corridor is important useful structural component that help animal movement in fragmented landscapes. However, ecological corridors have many problems of the recorded the size of corridor, planting species to nearby exiting vegetation species and structure. The most important facts that there are no consideration for location of animal migration and behavior using eco-corridors. This study was carried out to spatial analysis of eco-corridors location, satellite data and GIS were used to analyze for searching optimum location of the eco-corridors.

Soil Environment's Impact on the Growth of Pinus thunbergii by Season in Urban Forests (도시림의 계절별 토양환경이 곰솔의 생육에 미치는 영향)

  • Kim, Seok-Kyu
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.4
    • /
    • pp.455-464
    • /
    • 2011
  • The purpose of this study is to clarify correlations between soil environments and the growth of trees in forests and thereon analyze effects of seasonal changes in such environments on such growth. To determine seasonal factors of soil affecting the Tree Vitality of Pinus thunbergii, first of all, the study designated the Tree Vitality as a dependent variable and soil hardness, moisture, pH, K, Na, Mg and Ca as independent variables. Then the study performed Pearson's coefficient analysis. To clarify what soil factors influence the seasonal growth of Pinus thunbergii multiple regression analysis is carried out, and findings are as follow; the growth of Pinus thunbergii was basically influenced by pH, followed by soil hardness in spring, K, followed by moisture in summer, and by soil hardness in winter. However, no soil factors affected the vitality at the significance level of 5% for t.

A Study on the Ecosystem Services Value Assessment According to City Development: In Case of the Busan Eco-Delta City Development (도시개발에 따른 생태계서비스 가치 평가 연구: 부산 에코델타시티 사업을 대상으로)

  • Choi, Jiyoung;Lee, Youngsoo;Lee, Sangdon
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.5
    • /
    • pp.427-439
    • /
    • 2019
  • Natural environmental ecology ofthe environmental impact assessment(EIA)is very much lacking in quantitative evaluation. Thus, this study attempted to evaluate quantitative assessment for ecosystem service in the site of Eco-delta project in Busan. As a part of climate change adaptation, this study evaluated and compared with the value for carbon fixation and habitat quality using the InVEST model before and after development with three alternatives of land-use change. Carbon fixation showed 216,674.48 Mg of C (year 2000), and 203,474.25 Mg of C (year 2015)reducing about 6.1%, and in the future of year 2030 the value was dropped to 120,490.84 Mg of C which is 40% lower than year 2015. Alternative 3 of land use planning was the best in terms of carbon fixation showing 6,811.31 Mg of C. Habitat quality also changed from 0.57 (year 2000), 0.35 (year 2015), and 0.21 (year 2030) with continued degradation as development goes further. Alternative 3 also was the highest with 0.21(Alternative 1 : 0.20, Alternative 2 : 0.18). In conclusion,this study illustrated that quantitative method forland use change in the process of EIA can helpdecision making for stakeholders anddevelopers with serving the best scenario forlow impact of carbon. Also it can help better for land use plan, greenhouse gas and natural environmental assets in EIA. This study could be able to use in the environmental policy with numerical data of ecosystem and prediction. Supplemented with detailed analysis and accessibility of basic data, this method will make it possible for wide application in the ecosystem evaluation.

A Study for Examination of Road Noise Prediction Results According to 3-d Noise Prediction Models and Input Parameters (3차원 소음예측모델 및 입력변수 변화에 따른 도로소음 예측결과 검토에 대한 연구)

  • Sun, Hyosung
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.2
    • /
    • pp.112-118
    • /
    • 2014
  • The application of a 3-d noise prediction model is increasing as a tool for performing actual noise assessment in order to investigate the noise impact of the residential facility around a development region. However, because the appropriate plans of applying a 3-d noise prediction model is insufficient, it is important to secure the reliability of the noise prediction results generated by a 3-d noise prediction model. Therefore, this study is focused on examining a 3-d noise prediction model, and a prediction equation and input data in it. For this, the 3-d noise prediction models such as SoundPLAN, Cadna-A, IMMI is applied in road noise. After the contents of road noise equations, input data of road noise source, and input data of road noise barrier are understood, the road noise prediction results are compared and examined according to the variation of 3-d noise prediction model, road noise equation, and input data of road noise source and road noise barrier.

A Study of Useability of Ecosystem Service Assessment on Strategic Environmental Assessment (전략환경영향평가 시 생태계서비스 평가 결과의 활용가능성에 관한 연구)

  • Park, Yoon-Sun;Kim, Choong-Ki;Lee, Who-Seung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.24 no.2
    • /
    • pp.115-126
    • /
    • 2021
  • Strategic Environmental Impact Assessment (SEA) is a decision-making process taking into account the environmental impact, economic and social impact of policies, plans, and programs at the higher stage prior to the project plan for promoting sustainable development. In this study, we analyzed the process and criteria for selecting appropriate alternatives when establishing development plan in SEA. First, the criteria for estimating changes in ecosystem services following the implementation of development project of industrial complex were presented. Second, alternative evaluations were conducted through an analysis of ecosystem service scenarios to explore suitable alternatives in Anseong. As a result, the environmental quality of selected area as the existing project site deteriorated according to the implementation of the project, and the dimensional reduction technique confirmed that the change in ecosystem service factors in project area was the optimal location. In addition, the results of the scenario assessment to explore suitable alternatives in Anseong City showed that the existing site had large capacity in terms of water quality control services (scenario 1), scenario 2 in terms of preconditioning services, and scenario 3 in terms of water supply services. The guidance of Ecosystem service assessment is expected to be available in decision-making of large-scale strategies (e.g., SEA) and projects by presenting more quantitative criteria for determining the adequacy and location feasibility of development plans and policy plans. This is expected to require various support, including legislation and revision of related laws, believed to be supported by advanced research.

An Application Status and Consideration of System Improvement on the Sea Area Utilization Conference and Impact Assessment (해역이용협의제도 운용 현황 분석 및 실효성 제고방안)

  • Lee, Dae-In;Kim, Gui-Young;Jeon, Kyeong-Am;Eom, Ki-Hyuk;Yu, Jun;Kim, Yeong-Tae;Moon, Ju-Hoon;Kam, Min-Jae
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.14 no.4
    • /
    • pp.239-248
    • /
    • 2011
  • This paper evaluated types and characteristics of development projects occurred in coastal area (Public Water) by analyzing an application status of Sea Area Utilization Conference System that effective protect and manage marine environment and ecosystem from various artificial utilization and development enforced in 2008. Also, system improvement for stable settlement and security of efficiency considering exposed problems during system enforcement were diagnosed. The number of Sea Area Utilization Conference (SAUC) performanced during the period of 2009-2010 was 3,705, which consisted of simple SAUC (87.0%), general SAUC (12.8%), and Sea Area Utilization Impact Assessment (SAUIC; 0.2%). The general SAUC was accomplished for Public Water reclamation (43.4%), seawater supply and drainage (17.5%), dredging sediment (5.5%), installation of port facilities (4.6%) and fishing harbor facilities (2.3%), and others (23.4%). Statements of Environmental Impact Assessment (EIA) were reviewed mainly for construction of port facilities (32.9%), followed by construction of industrial complex, development of tourism and leisure complex, road construction, and development of energy facilities. It would be necessary to strengthen effectiveness of the system, advertisement, and capability of conference and review agency, and to enhance confidence of marine EIA continuously, according to the increase of development projects, and diversity and enlargement of development types.

A Study on Determinations of Survey Station in Marine Ecosystems Based by Impact Prediction of Environment Impact Assessment in Coastal Development Projects (연안개발사업 환경영향평가 영향예측 결과에 근거한 해양생태계 조사정점 선정방안에 관한 연구)

  • Cho, Beom-Jun;Maeng, Jun-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.5
    • /
    • pp.767-779
    • /
    • 2012
  • In case of executing surveys in marine ecosystems, the most important things are scientific selection measures of survey stations that can represent various ecosystems characteristics in subjected areas. The situations show a lot of differences that understand characteristics of marine ecosystems in targeted areas according to selection methods and positions in survey stations. Investigation ranges and station numbers in marine ecosystems are classified according to project characteristics and scales. But, currently a clear divisions or objective standards are not. Therefore, this study tried to provide selection measures of survey station in scientific and objective marine ecosystems through precise analysis among environmental impact statements of coastal development projects until now. In this study, impact scopes of marine ecosystems correspond to physical impact predictions by undertaking projects. Impact ranges were divided into three(physical impact ranges) coastal waters. In case of proposing numbers of survey stations according to this survey ranges, numbers of investigation stations due to minimum survey scopes in targeted projects applied 20~30% of all numbers in survey stations. Number of survey stations due to average investigation scopes within physical impact ranges applied 60~70% of all numbers in investigation stations. Numbers of survey stations due to maximum survey ranges within physical impact scopes applied 10~20% of all numbers in survey stations. So, improvement measures were deducted. Finally, according to prediction ranges in impact of various coastal development projects, several kinds of conclusions are suggested. And, it is thought to be able to use as fundamental database to select investigation stations in marine organisms through this study.

A Study on the Improvement of the Consultations on Amendment in Environmental Impact Assessment of Industrial Complex Development (산업단지 조성사업의 환경영향평가 변경협의 개선방안 연구)

  • Joo, Yong-Joon;Sagong, Hee
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.3
    • /
    • pp.129-140
    • /
    • 2022
  • Environmental impact assessment on development projects is a process in which various stakeholders derive consultations by reflecting project characteristics and regional environmental status, and implementation of consultations is a prerequisite for securing sustainability of the local environment. The business plan can be changed to respond to changes in social and environmental conditions. And the business plan for which the environmental impact assessment consultation has been completed, it can be changed as a systematically prepared procedure (called Consultations on Amendment). As a result of investigating and analyzing the current status and major changes in the development project, Consultations on Amendment in industrial complexes were the most common, and the environmental impact is increasing accordingly. As the results of the analysis of operational status and the case studies, the main causes of Consultations on Amendment in industrial complex can be summarized into three categories: (1) formal demand forecasting for tenant industries, (2) excessive omission and simplification of administrative procedures under the Special Act, and (3) the use of an expedient change consultation system to facilitate environmental impact assessment consultation and shorten the period. This study proposes the following three measures to prevent the deterioration of the environmental impact assessment function due to frequent consultations on industrial complex changes; (1) Ensuring residents' participation procedures for Consultations on Amendment that changes important matters, (2) Reasonable revision of the "Simplification of Industrial Complex Procedures Act" to enhance the feasibility of industrial complex development plans and locations, (3) Development of evaluation criteria and methods for verification of real demand for objective demand management for industrial complexes, and (4) Preparation of a review guideline for Consultations on Amendment.

Studies on the Integrated Stream Naturalness Assessment Based on Abiotic and Biotic Factors (비생물 및 생물 요인에 기초한 통합적 하천자연도 평가기법에 관한 연구)

  • Pyo, Jae-Hun;Mun, Hyeong-Tae
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.1
    • /
    • pp.61-69
    • /
    • 2011
  • Integrated stream naturalness based on abiotic and biotic factors were developed. Abiotic factors considered in this study were types of land use in the riparian area, river bank and high water bed streamside, revetment, bed substrate and artificial construction of streamside. Biotic factors included types of vegetation, assemblages of fish, macroinvertebrate, bird and mammal(Otter) in streams. The presence/absence of legal species and biological assessment index were also weighted as important parameters in this study. Scoring criteria selected for each matrix was five rating system; 1=poor, 2=moderate, 3=fair, 4=good, 5=excellent. Numerical ratings for the matrix were then summed. This resulted in a minimum score of 13 if all matrix at a site were poor, and a maximum score of 65 if all matrix were excellent. Five grade system from poor(I) to excellent condition(V) was employed. To verify its validity in natural environment, the evaluation system was applied to the Gapchun stream which is a test bed selected. Our result showed that stream naturalness of each reach was clearly distinguished by biotic and abiotic characteristics. Determination of correlation coefficient between abiotic and biotic factors was also high ($R^2=0.96$, p<0.05). In conclusion, assessment for stream naturalness reflecting abiotic and biotic factors was useful method representing stream integrated.

The Evaluation and Comparison of Alternative Site for the Second Service Facilities Zone near the Tonghak Temple in Mt. Kyeryong National Park (계룡산 국립공원 동학사 제2집단시설지구의 위치선정평가 및 대안비교)

  • Lee, Hee-Seon;Lee, Kyoo-Seock
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.2
    • /
    • pp.29-37
    • /
    • 1995
  • The national park should be preserved in accordance with the regulation, but the development planning or facilities management planning has not been faithful to the spirits of the regulation. Recently natural environment has been radically changed, and especially damaged by large scale development of Service Facilities Zone. Thus the effective land use planning of the national park is required. Therefore, the purpose of this study is to propose the alternative site for The Second Service Facilities Zone in Mt. Kyeryong National Park using the GIS, and to compare the alternative site with the existing development site. Site selection was based on Rules of Combination which covers topographic analysis, viewshod analysis, distance analysis from hot spring well, land use analysis, and forest stand analysis.

  • PDF