• Title/Summary/Keyword: EHV

Search Result 154, Processing Time 0.068 seconds

Reliability Assessment of Forest Fire on EHV Polymer Insulator Strings (송전용 폴리머애자의 산불 영향 신뢰성 평가)

  • Min, Byeong-Wook;Shin, Tai-Woo;Choi, In-Hyuk;Choi, Han-Yeol;Park, Jae-Ung;Yu, Kun-Yang
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.436-437
    • /
    • 2006
  • Porcelain insulators have generally been used in Korea but polymer insulators which are superior in that they are light weight, explosion proof, impact proof, economical with construction characteristics, have been in use for the 154kV transmission line since 1999 following a worldwide trend towards the reduced weight, simplification and compact usage of new material insulators. However there have been approximately 500 cases of forest fires in Korea, so the transmission lines that for the most part pass through mountainous areas have been highly effected and the highly polymerized compound polymer insulator has raised concern about reliability in cases of exposure to forest fires. Therefore for the reliability assessment of the effect of forest fires on polymer insulators, mechanical and electrical characteristics are analyzed by an artificial flare test device and transmission facility surrounding conditions along with forest fire characteristics are surveyed. In addition to this, actual 90kV energized transmission line was tested with an artificial forest fire and the expanded usage of polymer insulators is presented through the analysis of mechanical and electrical characteristics and physical properties, and a study on the influence of forest fires on polymer insulators.

  • PDF

Leakage Current Characteristics of Experiment Outdoor Stations for Long-term Testing of EHV Insulators (송전용 애자의 옥외 장기실증시험을 통한 누설전류 특성)

  • Choi I. H.;Choi J. H.;Jung Y. H.;Lee D. I.;Jung G. J.;Shin T. W.;Min B. W.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.530-532
    • /
    • 2004
  • 옥외 장기실증시험 설비를 구축하여 154(kV) 송전 전압으로 1년 동안 자기애자(36,000lbs) 및 폴리머 애자(154 [kV] 용)에 대하여 비 또는 눈이 올 때 각 계절에 대한 누설전류 특성에 관하여 조사하였다. 그 결과 자기애자는 누설전류가 장마철, 한여름, 가을의 경우 잦은 집중호우로 첫날은 급격한 증가가 보였으면 폭우 후에는 자연세정으로 인한 폭우 전보다 더 낮게 나타났다. 그리고 겨울에 눈이 올 경우에는 적은 양의 눈으로도 자기 애자 표면에 눈의 쌓여 누설전류가 넓은 시간 높게 나타났으며, 겨울비가 올 경우에는 겨울 동안 눈으로 인해 염분 및 진애의 누적으로 폭우에 대하여 사계절 중 가장 높은 누설전류를 나타났다. 한편 폴리머 애자의 경우에는 사계절에 관계없이 누설전류 증감은 크지 않았으나 겨울비가 을 경우에는 누설전류가 수 백 $[\muA]$까지 증가하였다.

  • PDF

A Study on the Comparison and Analysis of Leakage Current according to Environmental Variation of EHV insulators(36,000LBS) by Pollution Level (송전용 자기애자(36,000LBS)의 오손 등급별 환경변화에 따른 누설전류 분석 및 비교 연구)

  • Choi I. H.;Choi J. H.;Jung Y. H.;Lee D. I.;Jung G. J.;Shin T. W.;Bang H. K.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.527-529
    • /
    • 2004
  • This paper researched leakage current characteristics of EHW insulators(36,000lbs) to artificially contaminated clay and kaolin through construction of long-periods testing facility. Insulators were contaminated and classified into the ESDD level(B, C and D) under IEC Pub. 60507 standards method. As a result of tests, leakage current of the heavily contaminated D level to clay was approximately 2,260 $[\muA]$, which is contaminated to kaolin was approximately 3,200 $[\muA]$, during initial rainfall. However after raining, leakage current of naturally washed contamination insulators was lower at approximately 300 $[\muA]$. As regular temperature $20^{\circ}C$, leakage current increased greatly in case humidity density was over $72\%$. But, leakage current was not influenced by temperature variation in case of regular $\%$ humidity.

  • PDF

Characteristics of TV Ghost Interference from Extra High Voltage Transmission Line (초고압 송전선로에 의한 TV Ghost 장해 발생 특성)

  • Ju, Mun-No;Yang, Gwang-Ho;Lee, Dong-Il;Sin, Gu-Yong
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.8
    • /
    • pp.412-417
    • /
    • 2000
  • TV ghost interference can be described as passive interference by the conducting part of transmission lines. In order to survey this interference from large-sized overhead EHV (extra high voltage) transmission line, TV reception quality was measured in the vicinity of that before and after construction. Instrumentation system was composed of ghost analyzer, TV received field intensity meter, VHF/UHF antennas, TV monitor and so on. The system is installed inside the vehicle. TV field intensity and PDUR (Perceived Desired wave to Undersired wave Ratio) are measured to evaluate TV ghost by using the system and vehicle. As the results, the useful data, which can be used to evaluate the effect of TV ghost interference from transmission lines could be obtained. In this paper, it is shown that the range of TV ghost interference from transmission lines can vary according to the frequency of TV electromagnetic wave, an incidence angle to the line and the other conditiions. At present, we are making efforts to establish a PDUR guideline for transmission lines.

  • PDF

A Study on the Electromagnetic Interference from 765kV Test Line (765kV 시험선로에서의 전자파 장해에 관한 연구)

  • 김정부;이동일;신구용;양광호;안희성;구자윤
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.7 no.1
    • /
    • pp.36-42
    • /
    • 1996
  • In general, EMI(electromagnetic interference) from EHV(extra high voltage) power lines above 50kV cause interference to AM radio and low VHF television reception. This paper describes the results of long-term measurement of RI and TV1 in 765kV, double circule of $6\times29.59mm$(1.65k inches) diammer $480mm^{2}$(Rail) ACSR conductors in suitable for 766kV transmission lines to provide acceptable EMI at 15m fro the beneath of outmost phase.

  • PDF

Algorithm for Fault Location Estimation on Transmission Lines using Second-order Difference of a Positive Sequence Current Phasor

  • Yeo, Sang-Min;Jang, Won-Hyeok;Kim, Chul-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.3
    • /
    • pp.499-506
    • /
    • 2013
  • The accurate estimation of a fault location is desired in distance protection schemes for transmission lines in order to selectively deactivate a faulted line. However, a typical method to estimate a fault location by calculating impedances with voltages and currents at relaying points may have errors due to various factors such as the mutual impedances of lines, fault impedances, or effects of parallel circuits. The proposed algorithm in this paper begins by extracting the fundamental phasor of the positive sequence currents from the three phase currents. The second-order difference of the phasor is then calculated based on the fundamental phasor of positive sequence currents. The traveling times of the waves generated by a fault are derived from the second-order difference of the phasor. Finally, the distance from the relaying point to the fault is estimated using the traveling times. To analyze the performance of the algorithm, a power system with EHV(Extra High Voltage) untransposed double-circuit transmission lines is modeled and simulated under various fault conditions, such as several fault types, fault locations, and fault inception angles. The results of the simulations show that the proposed algorithm has the capability to estimate the fault locations with high speed and accuracy.

Present Development Trends of 345kV XLPE Cables (345kV XLPE 케이블의 개발 현황)

  • Kim, Y.;Park, K.R.;Lee, S.H.;Heo, K.D.;Lee, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07c
    • /
    • pp.1881-1883
    • /
    • 2002
  • Recently, 345kV XLPE Cable and Accessories have been developed and will be applied for Youngseo$\sim$Youngdeungpo project in Korea. So, let this project and the process of development introduce on this paper. The cable type and length of this project is 345kv XLPE 1C*$2000mm^2$ 66km and all cable will be pulled on cable tunnel. The diameter of cable insulation was designed as 27mm, we could reduce it by appling for hi-tech and super-clean system. Joints were developed by a pre-fabricated type which considered high safety and economic issues. We had also done Pre-Qualification test for verifying the reliance of cable and accessories before construction. As we developed this 345kV XLPE cable system including its accessories at the same time, we can have higher technologies and contribute safe power in transmission lines. In adtionally, we can have a stable status for suppling EHV cable systems to a variety foreign customers by ourselves.

  • PDF

A study on transient stability of 345 KV power transmission line (345KV 송전선의 과도안정도계산 I)

  • 이재숙
    • 전기의세계
    • /
    • v.18 no.1
    • /
    • pp.24-29
    • /
    • 1969
  • This is preliminary study concerning the future construction and operation of 345KV power transmission line in Korea which will be added to the existing 161KV power system by the end of 1970 in order to increase the power carrying capacity between Seoul and Pusan area; 350 kilo meters aparts, in accordance with the ambitious second five years power development schedule of Korea Electric Company. The result of this study says that an intermidiate switching station should be installed at the middle position of the line to improve the transient stability of the system, considerable amount of capacitors or synchronous condenser are to be installed to reduce the voltage drop at receving end of line during the heavy load hours, and also in some measure to avoid the voltage rise by self-excitation of power generators during the light load hours and while energizing the line. This is the first attempt to realize the EHV power transmission line in Korea so that the additional study is necessary on the kind and size of conductors, the necessary number of insulators and the suitable clearance distances between conductor and steel tower or earth from the technical and economical view points. These are necessary steps to be taken by the writer before getting into the calculation on the transient stablity of the power system.

  • PDF

Development of single piece premolded joint for EHV XLPE cable system (초고압 XLPE 케이블용 프리몰드형 접속함 (Premolded Joint) 개발)

  • Shin, Doo-Sung;Choi, Soo-Geol;Ko, Eui-Gon;Ji, Eung-Seo;Min, Byung-Kwan;Kang, Chae-Hong;Jeon, Seung-Ik
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.410-412
    • /
    • 2001
  • 초고압 CV 케이블용으로 다양한 형태의 접속함이 사용되고 있으나, 최근 케이블 시스템의 사용 전압이 초고압화됨에 따라 접속함 또한 고품질, 고신뢰성이 요구되고 있다. 따라서 공장에서 엄격한 품질 관리가 용이하고, 현장에서 쉽게 조립할 수 있는 프리몰드형 접속함(Premolded Joint: PMJ)의 사용이 급격하게 증대되고 있다. 본 논문에서는 국내에서 최초로 $110kV{\sim}170kV$ 전압급의 PMJ 접속함 개발에 관하여 소개 하였다. 전기적, 기계적 및 열적 설계의 개념을 간략하게 소개하였으며, 접속함의 초기 성능 및 장기 신뢰성을 검증하기 위한 시험 및 평가 결과를 소개하였다.

  • PDF

Trends of Prefabricated Joints and their Jointing Techniques for EHV XLPE-insulated Power Cables (초고압 XLPE 전력케이블용 Prefabricated Joint 및 접속기술 동향)

  • Kim, Y.;Seong, J.K.;Han, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1608-1610
    • /
    • 1998
  • An oil-filled paper-insulated power cable and a XLPE-insulated power cable have been mainly applied as an extra-high-voltage underground power cable. But in recent the XLPE cable has been applied more widely than the OF cable, because of its advantages, such as the low-cost and simple installation. In general two types, molded and prefabricated, of straight joints are applied for the XLPE cables. For a tape-molded joint, one of molded joints, its electrical properties are excellent, but it has some disadvantages, such as a long working time. high skill of workers and the high cost of jointing equipments. For a prefabricated joint, developed and applied in Europe and Japan, its working time is short, its jointing procedures are simple, and its quality control is easy, but its prices are very high. In Korea the development of a compression-type PJ will be finished in the near future, and studies of its jointing techniques and equipments is actively going on. This paper describes the design and construction of the PJ, the jointing procedures and techniques for the PJ, and its future trends.

  • PDF