A study on transient stability of 345 KV power transmission line

345KV 송전선의 과도안정도계산 I

  • Published : 1969.01.01

Abstract

This is preliminary study concerning the future construction and operation of 345KV power transmission line in Korea which will be added to the existing 161KV power system by the end of 1970 in order to increase the power carrying capacity between Seoul and Pusan area; 350 kilo meters aparts, in accordance with the ambitious second five years power development schedule of Korea Electric Company. The result of this study says that an intermidiate switching station should be installed at the middle position of the line to improve the transient stability of the system, considerable amount of capacitors or synchronous condenser are to be installed to reduce the voltage drop at receving end of line during the heavy load hours, and also in some measure to avoid the voltage rise by self-excitation of power generators during the light load hours and while energizing the line. This is the first attempt to realize the EHV power transmission line in Korea so that the additional study is necessary on the kind and size of conductors, the necessary number of insulators and the suitable clearance distances between conductor and steel tower or earth from the technical and economical view points. These are necessary steps to be taken by the writer before getting into the calculation on the transient stablity of the power system.

Keywords