• 제목/요약/키워드: EGSE

검색결과 33건 처리시간 0.035초

ELECTRICAL GROUND SUPPORT EQUIPMENT (EGSE) DESIGN FOR SMALL SATELLITE

  • Park, Jong-Oh;Choi, Jong-Yoen;Lim, Seong-Bin;Kwon, Jae-Wook;Youn, Young-Su;Chun, Yong-Sik;Lee, Sang-Seol
    • Journal of Astronomy and Space Sciences
    • /
    • 제19권3호
    • /
    • pp.215-224
    • /
    • 2002
  • This paper describes EGSE design for the small satellite such like KOMPSAT-2 satellite. Recent design trend of small satellite and EGSE is to take short development time and less cost. For this purpose, the design for KOMPSAT-2 satellite and EGSE are not much modified from KOMPSAT-1 heritage. It means that it is able to be accommodated the verified hardware and software modules used in KOMPSAT-1 satellite program if possible. The objective of EGSE is to provide hardware and software for efficient electrical testing of integrated KOMPSAT-2 satellite in three general categories. (1) Simulators for ground testing (e.g. solar-simulation power, earth scenes, horizons and sun sensor). (2) Ground station type satellite data acquisition and processing test sets. (3) Overall control of satellite using hardline datum. In KOMPSAT (KOrea Multi-Purpose SATellite) program, KOMPSAT-2 EGSE was developed to support satellite integration and test activities. The KOMPSAT-2 EGSE was designed in parallel with satellite design. Consequently, the KOMPSAT-2 EGSE was based on the KOMPSAT-1 heritage since the spacecraft design followed the heritage. The KOMPSAT-2 baseline was elaborated by taking advantage of experience from KOMPSAT-1 program. The EGSE of KOMPSAT-2 design concept is generic modular design with preference in part selection with commercial off-the-shelf which were proven from KOMPSAT-1 programs, flexible/user friendly operational environment (graphical interface preferred), minimized new design and self test capability.

The Communication Satellite Transponder Testing by EGSE System

  • 조진호;;이성팔
    • 한국위성정보통신학회논문지
    • /
    • 제2권2호
    • /
    • pp.36-40
    • /
    • 2007
  • EGSE is used to check out satellite payload during the development prior to launch. The EGSE represented in this paper is a test system for Ka band communication transponder of COMS. The EGSE consist of two subsystems as CTS subsystem and PCTS subsystem. Communication Test subsystem (CTS) performs satellite transponder RF performance testing, data analysis and trending. Most of transponder RF performances are automatically tested by the CTS subsystem. Power, Command & Telemetry subsystem (PCTS) monitor telemetry messages from the transponder and send tele-commands to satellite transponder for the configuration change. PCTS also provide simulated S/C power to the transponder during the ground validation testing. The EGSE test functions are verified by the transponder simulator testing and will be used for the flight model transponders testing.

  • PDF

통신해양기상위성 전기적 지상 성능시험 장치 하드웨어 설계 (Electrical Ground Support Equipment(EGSE) Hardware Design for the Communication, Ocean & Metrological Satellite(COMS))

  • 조영호;양군호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 심포지엄 논문집 정보 및 제어부문
    • /
    • pp.269-270
    • /
    • 2007
  • The COMS(Communication, Ocean & Meteorological Satellite) is the geostationary satellite which will be performing three main objectives such as meteorological service, ocean monitoring and Ka-band satellite communications. This paper reports on the hardware architecture of the system electrical ground support equipment(EGSE) for the COMS satellite. EGSE is used to check out satellite during the development prior to lunch. The EGSE represented in this paper consist of two parts. First, I will deal with the OCOE(Overall Check Out Equipment) system which controls and operates the all EGSE system. In second part, we will introduce the SCOE(Specific Check Out Equipment) systems which can test the specific subsystems of the COMS satellite.

  • PDF

디지털위성중계기용 성능입증장치의 설계 및 구현에 대한 연구 (A Study on the Design and Implementation of EGSE for Digital Satellite Communication)

  • 김기중
    • 한국전자통신학회논문지
    • /
    • 제13권3호
    • /
    • pp.503-508
    • /
    • 2018
  • 본 연구는 디지털위성중계기용 성능입증장치의 설계 및 구현에 대해 기술하였다. 성능입증장치(EGSE : Electrical Ground Support Equipment)는 디지털위성중계기를 평가하는 장비로 정밀하고 정확한 측정이 요구된다. 성능입증장치는 디지털위성중계기를 검증하기 위하여 위성버스를 모사한 PLDIU(Payload Distribution and Interface Unit)와 계측장비연동장치, SHF대역 상향주파수/하향주파수 변환장치, 모뎀 등으로 구성되어 있다. 성능입증장치는 디지털위성중계기를 제작 후 성능확인 및 열진공시험 등의 우주환경시험 시 활용하였다.

대전자전 중계기용 성능 입증 장치의 설계 및 구현에 대한 연구 (A Study on the Implementation and Design of EGSE for Dehop/Rehop Transponder)

  • 김기중;김봉수
    • 한국전자통신학회논문지
    • /
    • 제17권1호
    • /
    • pp.147-152
    • /
    • 2022
  • 본 연구는 대전자전 중계기용 성능 입증 장치의 설계 및 구현에 대해 기술하였다. 성능 입증 장치(EGSE :Electrical Ground Support Equipment)는 대전자전 중계기를 평가하는 장비로 정밀하고 정확한 측정이 요구된다. 성능 입증 장치는 대전자전 중계기를 검증하기 위하여 위성 버스를 모사한 PLDIU(Payload Distribution and Interface Unit)와 계측장비 연동장치, L대역 상향주파수/하향주파수 변환장치, 모뎀 등으로 구성되어 있다. 성능 입증 장치는 대전자전 중계기를 제작 후 성능 확인 및 열진공시험 등의 우주 환경 시험 시 활용하였다.

통신위성 중계기 시험을 위한 EGSE 설계 및 구현 (Design and Implementation of EGSE for the CBS Transponder Testing)

  • 조진호;정용길;최완식;박종홍;이성팔
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2002년도 하계종합학술대회 논문집(1)
    • /
    • pp.235-238
    • /
    • 2002
  • In this paper we describe the design and implementation of Electrical Ground Support Equipment(EGSE) for the CBS transponder testing. The main task of EGSE is to check out satellite systems, at system or subsystem level, during integration and validation phases of their life-cycle. Through a combination of hardware and software elements, EGSE supports manual, semi-automatic and fully automated testing. Automation is achieved by offering users simple, yet powerful means to write their own test application programs (test sequences) in high-level, test-oriented language and to run them in a strict real-time environment. The core of this environment is a user-configurable real-time database, containing all the information needed to calibrate acquired data, check them against predefined thresholds, automatically react to out-of-range conditions, display data using animated graphics or synoptic windows, and so on.

  • PDF

고신뢰성 지상시험지원장비 조기 확보를 위한 시나리오 기반 위성 탑재체 패킷 분석방법 (Scenario Based Operating Satellite Payload Data Analysis Method to Secure Highly Reliable EGSE Early)

  • 이종태;이기준
    • 대한원격탐사학회지
    • /
    • 제33권5_1호
    • /
    • pp.521-535
    • /
    • 2017
  • 탑재체를 포함한 위성은 발사 이후 문제 발생시 조치할 수 있는 방법이 한정적이므로, 지상시험지원장비를 이용하여 그 기능을 충분히 검증하여야 한다. 또한 위성의 개발기간이 단축되고 있는 추세와 지상시험지원장비의 개발 완료시점이 전장품 엔지니어링 모델 개발완료보다 앞서야 한다는 점을 고려하면, 지상시험지원장비의 조기 확보는 위성 전체의 개발일정 준수를 위해서 반드시 필요하다고 할 수 있다. 본 논문에서는 지상시험지원장비의 일부인 탑재체 패킷 분석장치를 기능별 모듈화와 외부 파라메터화를 통해 시나리오 기반으로 동작할 수 있게 고안하여 고신뢰도의 지상시험지원장비 조기 확보방안을 제시하고, 구현한 장비를 실재 위성 개발사업에 적용한 결과를 보여준다.

전기지상지원장비 및 관제시스템 통합 개발을 위한 유럽 표준안 현황 (ECSS E70 Standard for developing common EGSE and MCS)

  • 허윤구;최종연
    • 항공우주산업기술동향
    • /
    • 제6권1호
    • /
    • pp.56-64
    • /
    • 2008
  • 위성체 총조립 및 시험(AIT; Assembly, Integration & Test)을 위한 전기지상지원장비(EGSE ; Electrical Ground Support Equipment)와 위성 임무 준비 및 운용을 위한 관제시스템(MCS; Mission Control System)은 동일한 시스템은 아니지만 많은 공통점과 호환 가능성을 갖고 있다. 하지만 우주 사업의 핵심 지상시스템인EGSE와 MCS는 사용 시기와 개발 조직이 달라서 오랫동안 별도로 개발 및 발전되어 왔다. 그러나 두 시스템이 기술적인 측면에서 유사한 기능과 역할을 하기 때문에 통합 또는 공통 개발에 대한 요구가 끊임없이 제기되고 있으며, 이미 세계적으로ECSS E70과 같은 관련 표준화 작업과 이를 바탕으로 실제 구현된 핵심 지상운영시스템의 개발이 최근에 기술적인 성숙을 이루고 있어 현재 거의 모든 우주 사업에서 핵심 지상운영시스템을 활용하거나 더 나아가 상용 제품을 적용하여 공통지상시스템을 개발하고 있다. EGSE와 MCS의 공통 기능에 관련된 표준화 작업은 ECSS를 통해 국제 표준(ISO, CCSDS 등)을 바탕으로 한 위성의 지상시스템에 대한 유럽 표준화 작업이 ECSS-E-70 Working Group에서 진행되고 있다. 여기서는 우주 산업에 관련된 표준화 단체인 ECSS에 대한 역사, 정책, 조직 및 문서 구조를 포함하여 ECSS에서 현재 진행되고 있는 지상시스템 및 운용 분야 관련 ECSS E70 표준화 작업의 내용 및 현황에 대해서 살펴보고자 한다.

  • PDF

위성 공통지상시스템 개발 동향

  • 최종연
    • 항공우주산업기술동향
    • /
    • 제5권2호
    • /
    • pp.33-42
    • /
    • 2007
  • 위성체 총조립 및 시험(AIT ; Assembly, Integration & Test)을 위한 전기지상지원장비(EGSE ; Electrical Ground Support Equipment)와 위성 임무 준비 및 운용을 위한 관제시스템(MCS ; Mission Control System)의 공동 개발은 미국과 유럽의 위성사업 기관 및 업체에서 지금까지 많은 연구가 되어 왔다. 비록 두 시스템이 다른 목적으로 사용되고 있지만 기술적으로 유사한 기능을 갖는 시스템으로서 많은 공통점과 호환 가능성을 갖고 있다. 두 시스템의 공동 개발은 시스템 개발과 위성 운용 교육 및 준비에 필요한 비용 절감뿐만 아니라 AIT 단계에서 위성운용단계로의 자연스러운 전환이 가능하다. 이는 AIT 단계에서 공통지상시스템 하드웨어 및 운영시스템, 시험/운용 절차서, 위성 데이터베이스의 사전 검증이 이루어지기 때문이다. 또한 위성 운용 요원의 AIT 참여를 통해 공통지상시스템 운용 훈련과 위성 관제 지식 습득이 자연스럽게 이루어 질 수 있다. 이로서 사업 일정과 개발 위험도를 최소화 할 수 있다. 이러한 두 시스템의 공통성과 호환성 및 공통시스템 개발 장점이 있기에 EGSE와 MCS의 공통 기능에 대한 표준화 작업은 1986년 만들어진 COES(Committee for Operations and EGSE Standard)에서 공식적으로 논의되기 시작하여 1994년 CNES와 ESA의 발의로 제정된 ECSS(European Cooperation for Space Standards)를 통해 국제 표준(ISO, CCSDS 등)을 바탕으로 한 지상시스템에 대한 유럽 표준화 작업이 ECSS-E-70 Working Group에서 진행되고 있다. 또한 검증된 지상시스템의 핵심 운영시스템의 소프트웨어 모듈의 재사용을 통해 최근에서 다양한 공통지상시스템이 개발되어 운용되고 있다. 이러한 배경으로 국내에서도 저궤도 위성 개발에서 EGSE 핵심 모듈인 TM/TC 처리 및 Database 관리 모듈을 AIT 단계에서 개발 및 검증 후에 MCS에서의 재사용을 적극적으로 고려하고 있다. 앞으로 국제적인 추세에 따라 AIT 및 지상국간의 기술 및 인력 교류와 핵심모듈 개발을 통한 공통지상시스템 개발의 활발한 전개가 예상된다.

  • PDF

Header Data Interpreting S/W Design for MSC(Multi-Spectral Camera) image data

  • Kong Jong-Pil;Heo Haeng-Pal;Kim YoungSun;Park Jong-Euk;Youn Heong-Sik
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2004년도 Proceedings of ISRS 2004
    • /
    • pp.436-439
    • /
    • 2004
  • Output data streams of the MSC contain flags, Headers and image data according to the established protocols and data formats. Especially the Header added to each data lines contain information of a line sync, a line counter and, ancillary data which consist of ancillary identification bit and one ancillary data byte. This information is used by ground station to calculate the geographic coordinates of the image and get the on-board time and several EOS(Electro-Optical Subsystem) parameters used at the time of imaging. Therefore, the EGSE(Electrical Ground Supporting Equipment) that is used for testing MSC has to have functions of interpreting and displaying this Header information correctly following the protocols. This paper describes the design of the header data processing module which is in EOS­EGSE. This module provides users with various test functions such as header validation, ancillary block validation, line-counter and In-line counter validation checks which allow convenient and fast test on imagery data.

  • PDF