• Title/Summary/Keyword: E-Project Management

Search Result 524, Processing Time 0.026 seconds

A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management (프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례)

  • Jung, Ha-Sung;Lee, Dong-Wha;Lee, Min-Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.3
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

Project Risk Management & Observational Method for soft ground improvement (연약지반을 대상으로 한 프로젝트 리스크와 현장계측의 과제와 대책)

  • Imanishi, Hajime
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.509-514
    • /
    • 2006
  • Considering the risk management, there are many examples and various studies for the corporation risk. However, I have never seen the project risk management that applied a construction site for practical approach. Therefore, I have developed a chart (I-Chart) for the project risk management, and also built a model (I-Chart scenario analysis) that I could use. I applied this model to container yard reclaimed land in harbor construction with approaching of geotechnical engineering.

  • PDF

The Effects of Project Newness on the Relationship between Project Management Styles and Performance (프로젝트의 신규성 정도가 프로젝트 관리방식과 성과간의 관계에 미치는 영향)

  • Park, O-Wwon;Cha, Jong-Seok;Kim, Sun-Woo
    • Journal of Korea Technology Innovation Society
    • /
    • v.15 no.2
    • /
    • pp.421-442
    • /
    • 2012
  • Many studies have been published on the relationship between project management styles and project performance. In recent researches, it is argued that project management styles should be different based on project characteristics and these project characteristics may have an effect on the relationship between project management styles and project performance. However, there are few empirical studies covering these issues. In this study, we examined the effect of project characteristics (i.e., degree of newness) on the relationship between project management styles (i.e., team autonomy, internal and external communication, individualism orientation) and project performance. The empirical results using 78 government sponsored R&D projects showed that team autonomy has a stronger positive effect on project performance as project newness becomes higher. In addition, as project newness becomes higher, internal communication showed a stronger positive effect on project performance, while external communication had a stronger negative effect.

  • PDF

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

A Successful Example of the PMIS to Dongnam Distribution Complex Project using TPMS(Total Project Management System) of the GS E&C (GS건설 TPMS를 통한 동남권유통단지 이주전문상가 현장 PMIS 성공사례)

  • Lee, Heung-Won;Park, Chan-Jeong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.129-134
    • /
    • 2007
  • In 1996, GS E&C became the first in the industry to adopt a Project Management System using EVM(Earned Value Management) to link schedule with profit/loss. In 2006, the TPMS(Total Project Management System) was completed by adding the concept of Lean Construction and JIT(Just In Time) to the Project Management System. This was done with the purpose of reducing waste and creating optimal work processes. This has been implemented on all sites and has enabled drastic increase of productivity. The portal provides customized information to the client, inspector and subcontractor personnel. Since various parties are receiving information that suits their requirements and is easy to use, usage has increased and since they are on the same platform, quick decisions and information sharing is possible. The purpose of the PMIS's success model in construction projects, this paper tests and proves the TPMS's efficiency and productivity to Dongnam Distribution Complex project.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

Essence Applicability Matrices for the Reduction of Project Cycle Time

  • Hong, Tae Hoon;Son, Jae Ho
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.57-68
    • /
    • 2006
  • Global competition and reduced project life cycle ultimately puts greater performance requirements on the capital project delivery systems used to maintain competitiveness. Despite continuing improvements in delivery cycle time, business owners of facilities continue to demand greater improvements in project delivery cycle time. Therefore, it is very important to investigate the various techniques and methods leading to reduction in project cycle time and also identify the applicability of identified techniques and methods. This paper introduces reduction techniques identified through literature review (i.e, Schedule Reduction Techniques (SRTs), Management Techniques (MTs), and Construction Institute Industry (CII) Best Practices (BPs). In order to collect applicability of these techniques under different project phases (Pre-project planning (PPP), Design (D), Material Management (MM), Construction (C), and Start-up (SU)), the Essence Applicability Matrices (EAM) is used.

A study on the development on project scope management module using rule and case-based reasoning (규칙과 사례기반추론 기법을 이용한 프로젝트 범위관리 모듈 개발에 관한 연구)

  • Shin, Ho-Kun;Jeon, Sung-Ho;Kim, Chang-Ho
    • The Journal of Information Technology
    • /
    • v.7 no.3
    • /
    • pp.127-137
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of a project. Scope management for a project planning is also essential job in system integration project. However project planning is very difficult because lots of factors and their relationships should be considered. Therefore project planning of system integration project has been done by project manager's own knowledge and experience. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study presents a methodology to cope with the limitations of the existing studies that have uniformly been customizing the methodology by only project complexity. We propose PPSM(Project planning support module) based on determination rules regarding route maps and document levels, and CBR(Case-Based Reasoning) for WBS identification.

  • PDF

Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI (CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발)

  • Jeong, Mi-Seo;Han, Hyuk-Soo
    • Journal of Internet Computing and Services
    • /
    • v.9 no.6
    • /
    • pp.155-163
    • /
    • 2008
  • Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.

  • PDF

A Study on the Induction of BPM and its Application Sphere for the Establishment of e-Trade Process (전자무역 프로세스의 확립을 위한 BPM 도입과 적용분야에 관한 연구)

  • Lee, Sang-Jin
    • International Commerce and Information Review
    • /
    • v.9 no.1
    • /
    • pp.99-117
    • /
    • 2007
  • The purpose of this study is to explore the application sphere of BPM(Business Process Management) to e-trade process using BPM technology and its service architecture in order to expand the usage of e-trade platform which is developing. After close reviewing the current status of trade process, the possibility of BPM application by e-trade process will be analyzed. The result of analysis is that BPM application to local L/C and purchasing confirmation process could be implemented because those processes are very suitable to apply standardized process and can minimize the risk and confusion of users. BPM application to remaining trade process have to be considered by mid-term and long-term project with the reflection of pilot project performance. Also this study suggests a business management model of e-trade process based on BPM technology which is the new IT technology and integrated interface in view of trade community.

  • PDF