• Title/Summary/Keyword: Duration Curve

Search Result 445, Processing Time 0.025 seconds

Reliability Evaluation of Distributed Generation and Distribution System Using Load Duration Curve (Load Duration Curve를 이용한 분산전원과 배전계통의 신뢰도 산출)

  • Bae, In-Su;Kim, Jin-O
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.11
    • /
    • pp.518-524
    • /
    • 2005
  • This paper presents an analytical method for the reliability evaluation of distribution system, including the distributed generations. Unlike the large sized generations of transmission system, the distributed generations have complexities in analyzing and determining the operation. In the process of evaluate reliability, it can be shown that the analytical method is simpler than the Monte-Carlo simulation and the method using Load Duration Curve model is more accurate than that using peak load model. The modeling of distributed generation to analysis distribution system reliability using LDC is proposed in this Paper, and is compared with the MCS method as a result of case studies.

Watershed Water Quality Management Plan Using SWAT and Load Duration Curve (SWAT와 부하지속곡선을 이용한 유역 수질 관리방안)

  • KAL, Byung-Seok;CHO, So-Hyun;PARK, Chun-Dong;MUN, Hyun-Saing;JOO, Yong-Eun;PARK, Jae-Beom
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.24 no.3
    • /
    • pp.41-57
    • /
    • 2021
  • This study evaluated the application of water quality management measures using the SWAT model and the effectiveness of the measures using the load duration curve targeting the Seohwacheon watershed located upstream of Daecheongho. As water quality management measures, artificial wetlands, reduction of neglected livestock, reduction of runoff from greenhouses, restoration of ecological rivers, application of LID technology, and management of point sources were applied. The applied technology evaluated the efficiency of water quality improvement measures by using the target water quality excess rate and the degree of load reduction for each sulfur through the load duration curve. The load duration curve was created by creating a long-term flow duration curve using SWAT and multiplying it by the target water quality. For the target water quality, the value corresponding to the 60th percentile was set as the target water quality using the 10-year data from the Okcheoncheon water quality observation point located in the downstream of Seohwacheon. Through this study, it was possible to confirm the applicability of various water quality measures through the SWAT model, and to examine the applicability of each period according to the sulfur through the load retention curve.

Application of Load Duration Curve and Estimation of Delivery Ratio by Flow Durations Using Discharge-Load Rating Curve at Jiseok Stream Watershed (유량-부하량관계식을 이용한 지석천 유역의 부하지속곡선 적용 및 유황별 유달율 산정)

  • Park, Jinhwan;Kim, Kapsoon;Hwang, Kyungsup;Lee, Yongwoon;Lim, Byungjin
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.523-530
    • /
    • 2013
  • This study has been carried out to clarify the characteristics of discharge and pollutant loading according to flow conditions at jiseok stream watershed (JSW). A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. By using the methods above, I've evaluated the water quality (WQ) of the JSW if it is satisfied with the standard target. I've collected the data of BOD and T-P from the JSW every 8 days for the duration of 12 months. And then, I've schematized the data upon the load duration curve and the results showed me that the WQ of JSW was satisfied with the standard target. I've also collected the same data every each day for the duration of 12 months from JSW and have schematized the data again. And the results showed that it also was satisfied with the standard target. To be concluded, I've determined that point pollution sources of JSW gives more significant impacts to the WQ than non-point pollution sources of JSW and hence, as time goes, point pollution sources will keep depriciating the WQ of JSW. Therefore, further efforts will be required to JSW to maintain the WQ.

Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds (부하지속곡선(Load Duration Curve; LDC)을 이용한 한강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Kim, Eunkyoung;Ryu, Jichul;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.732-738
    • /
    • 2015
  • Water quality in four major river basin in Korea was managed with Total Maximum Daily Load (TMDL) System. The unit watershed in TMDL system has been evaluated with Target Water Quality (TWQ) assessment using average water quality, without considering its volume of water quantity. As results, although unit watershed are obtained its TWQ, its allocated loads were not satisfied and vice versa. To solve these problems, a number of TWQ assessments with using Load Duration Curve (LDC) have been studied at other watersheds. The purpose of this study was to evaluate achievement of TWQ with Flow Duration Curve (FDC) and Load Duration Curve(LDC) at 26 unit watersheds in Han river basin. The results showed that achievement rates in TWQ assessment with current method and with LDC were 50~56 % and 69~73%, respectively. Because of increasing about 20% of achievement rates with using LDC, the number of exceeded unit watershed at Han river Basin was decreased about 4~6 unit watersheds.

Water Quality Characteristics Evaluation by Flow Conditions Using Load Duration Curve - in Youngbon A Watershed - (부하지속곡선을 이용한 유량 조건별 수질특성 평가 - 영본A 유역을 대상으로 -)

  • Park, Jinhwan;Kim, Kapsoon;Jung, Jaewoon;Hwang, Kyungsup;Moon, Myungjin;Ham, Sangin;Lim, Byungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.319-327
    • /
    • 2013
  • This study was conducted to identify runoff characteristics of pollutants using flow duration curve(FDC) and load duration curve(LDC) in Youngbon A watershed during 2009~2011. A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. From these methods, BOD, T-N, and T-P have evaluated whether water quality standards would have attained. Results showed that BOD loads of about 50% plotted above the LDC, while T-N and T-P loads of about 50% plotted below the curve. It means that BOD of about 50% have exceeded the water quality criteria, while T-N and T-P of about 50% have complied with the water quality standards. Meanwhile, BOD, TN and T-P loads plotted above the LDC of low flows, implying that they were more affected by point pollution sources than nonpoint pollution sources in the study watershed.

The Evaluation of Watershed Management Model using Behavioral Characteristics of Flow-duration Curve (유황곡선의 거동특성을 이용한 유역관리모형의 평가)

  • Kim, Joo Cheol;Lee, Sang Jin;Shin, Hyun Ho;Hwang, Man Ha
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.573-579
    • /
    • 2009
  • The performance of Rainfall-Runoff Forecasting System (RRFS), the watershed management model for the Geum river basin, is evaluated based on the agreement between the simulated and observed hydrographs and the behavioral characteristics of the flow-duration curves. As a result, the simulated hydrographs are well agreed with the observed ones except high flow discharges. It is inferred that most of the errors in the simulated hydrographs are due to the misestimation of agricultural water use in $2^{nd}$ quarter and the discrepancy of the peak discharges in $3^{rd}$ quarter. It is however judged that RRFS would give the reliable runoff hydrographs from the point of view of continuous model application. And simulated flow-duration curves and flow-duration coefficients are also similar to the observed ones except flood flow region. From the above result it is confirmed that the construction of Yongdam dam improves the state of flow-duration curve at the Gongjoo station.

A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River (낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구)

  • Shon, Tae-Seok;Park, Jae-Bum;Shin, Hyun-Suk
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.

Project Duration Estimation and Risk Analysis Using Intra-and Inter-Project Learning for Partially Repetitive Projects (부분적으로 반복되는 프로젝트를 위한 프로젝트 내$\cdot$외 학습을 이용한 프로젝트기간예측과 위험분석)

  • Cho, Sung-Bin
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.3
    • /
    • pp.137-149
    • /
    • 2005
  • This study proposes a framework enhancing the accuracy of estimation for project duration by combining linear Bayesian updating scheme with the learning curve effect. Activities in a particular project might share resources in various forms and might be affected by risk factors such as weather Statistical dependence stemming from such resource or risk sharing might help us learn about the duration of upcoming activities in the Bayesian model. We illustrate, using a Monte Carlo simulation, that for partially repetitive projects a higher degree of statistical dependence among activity duration results in more variation in estimating the project duration in total, although more accurate forecasting Is achievable for the duration of an individual activity.

Evaluation of Impaired Waterbody and Multivariate Analysis Using Time Series Load Curve -in Jiseok Stream Watershed- (시계열 부하 곡선을 이용한 수체손상 평가 및 다변량 분석 -지석천 유역을 대상으로-)

  • Park, Jinhwan;Kang, Taewoo;Han, Sungwook;Baek, Seunggwon;Kang, Taegu;Yoo, Jechul;Kim, Youngsuk
    • Journal of Korean Society on Water Environment
    • /
    • v.33 no.6
    • /
    • pp.650-660
    • /
    • 2017
  • In this study, pollutant emission characteristics by water damage period analyzed 11 items (water temperature, pH, DO, EC, BOD, COD, TOC, SS, T-N, T-P and flow) with load duration curve, time series load curve and factor analysis for three years (2014-2016). Load duration curve is applied to judge the level of impaired waterbody and estimate impaired level by pollutants such as BOD and T-P in this study depending on variation of stream flow. Water quality standard exceeded the flow of mid-range and low-range by flow condition evaluation using load duration curve. This watershed was influenced by point source more than non-point source. Cumulative excess rate of BOD and T-P kept water quality standard for all seasons (spring, summer, autumn and winter) except BOD 59% in spring. Water quality changes were influenced by pollutants of basic environmental treatment facilities and agricultural areas during spring and summer. Results of factor analysis were classified commonly first factor (BOD, COD, and TOC) and second factor (flow, water temperature and SS). Therefore, effects of artificial pollutants and maintenance water must be controlled seasonally and reduced relative to water damage caused by point pollution sources with effluent standard strengthened in the target watershed.

Improved method of the conventional flow duration curve by using daily mode discharges (일 최빈유량을 이용한 유황곡선 개선방안)

  • Park, Tae Sun
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.6
    • /
    • pp.355-363
    • /
    • 2021
  • The conventional Flow Duration Curve has limitations that it does not consider hydrologic persistence of daily discharge, that the daily discharge is greatly affected by the maximums or minimums, and that the date of occurrence and duration of a specific discharge cannot be known. In this study, we propose a Daily Mode Discharge Curve, which consists of aligning the daily discharge each year by the date of occurrence, calculating the daily mode discharge, and averaging them every 5 days. As a result of reviewing the long-term observational daily discharge data at 8 points upstream and downstream of the mainstream of the 4 major rivers in Korea, it was found that the daily discharge at all points shows hydrological persistence, and the distortion of it was alleviated by using Daily Mode Discharge Curve. We also suggest that the Daily Mode Discharge Curve is useful for utilizing reference discharge such as Drought, Low, Normal, Plentiful, and Flood Discharge.