• Title/Summary/Keyword: Distribution power networks

Search Result 263, Processing Time 0.031 seconds

Multi-objective Capacitor Allocations in Distribution Networks using Artificial Bee Colony Algorithm

  • El-Fergany, Attia;Abdelaziz, A.Y.
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.441-451
    • /
    • 2014
  • This article addresses an efficient heuristic-based approach to assign static shunt capacitors along radial distribution networks using the artificial bee colony algorithm. The objective function is adapted to enhance the overall system static voltage stability index and to achieve maximum net yearly savings. Load variations have been considered to optimally scope the fixed and switched capacitors required. The numerical results are compared with those obtained using recent heuristic methods and show that the proposed approach is capable of generating high-grade solutions and validated viability.

Cooperation Schemes of the LTC and SC for Distribution Volt/Var Compensation

  • Choi, Joon-Ho
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.4
    • /
    • pp.207-213
    • /
    • 2004
  • In this paper, the on-line volt/var control algorithms of the Load Tap Changer (LTC) transformer and Shunt Capacitor (SC) are proposed for distribution volt/var compensation. In the existing volt/var control of the distribution substation, the feeder voltage and reactive power demand of the distribution are mainly controlled by the LTC transformer tap position and on/off operation of the Sc. It is very difficult to maintain volt/var at the distribution networks within the satisfactory levels due to the discrete operation characteristics of the LTC and SC. In addition, there is the limitation of the LTC and SC operation times, which affects their functional lifetimes. The proposed volt/var control algorithm determines an optimal tap position of the LTC and on/off status of the SC at a distribution substation with multiple connected feeders. The mathematical equations of the proposed method are introduced. A simple case study is performed to verify the effectiveness of the proposed method.

A Service Restoration Algorithm for Power Distribution Networks Applying the Multi-Agent System

  • Jung Kwang-Ho;Cho Myeon-Song;Lee Seung-Jae;Lim Seong-Ll
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.2
    • /
    • pp.125-131
    • /
    • 2005
  • Service restoration is one of the most important missions in distribution system operation. This paper proposes a multi-agent system approach to distribution system restoration. Every relay is developed as an agent by adding its own intelligent, self-tuning and communication ability. The relay agent independently calculates and corrects its restoration index through communication with neighboring agents and its own intelligence. The proposed algorithm is applied to a simple network to demonstrate its soundness and effectiveness.

Analysis of Chip Performance by Core and I/O SSN Noise on DLL Board (DLL 보드 상에 코어 및 I/O 잡음에 의한 칩의 성능 분석)

  • Cho, Sung-Gon;Ha, Jong-Chan;Wee, Jae-Kyung
    • Journal of the Microelectronics and Packaging Society
    • /
    • v.13 no.4
    • /
    • pp.9-15
    • /
    • 2006
  • This paper shows the impedance profile of PEEC(Partial Equivalent Electrical Circuit) PDN(Power Distribution Networks) including core and I/O circuit. Through the simulated results, we find that the core power noise having connection with I/O power is affected by I/O switching. Also, using designed $74{\times}5inch$ DLL(Delay Locked Loop) test board, we analyzed the effect of power noise on operation region of chip. Jitter of a DLL measure for frequency of $50{\sim}400MHz$ and compared with impedance obtained result of simulation. Jitter of a DLL are increased near about frequency of 100MHz. It is reason that the resonant peak of PDNs has an impedance of more the 1ohm on 100MHz. we present the impedance profile of a chip and board for the decoupling capacitor reduced the target impedance. Therefore, power supply network design should be considered not only decoupling capacitors but also core switching current and I/O switching current.

  • PDF

A Study on the STATCOM Application for Efficient Operations of Wind Farm (풍력발전단지의 효율적인 운전을 위한 STATCOM 적용 가능성 연구)

  • 장성일;최정환;박인기;황혜미;최돈만;김광호;유능수
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.5
    • /
    • pp.250-256
    • /
    • 2003
  • In this papur, the STATCOM (STATic synchronous COMpensator) application for efficient operations of wind farm is described. The wind farm connected with the electric power network is one of good alternative energy sources. However, it would be also highly possible that interconnection of wind farm causes unwanted influences on distribution system operation, protection and control. This paper proposes the STATCOM application for reducing the negative effects from interconnection of wind farm with distribution networks. The simulation results show that STATCOM would be on effective and useful device to resolve the bad influences from wind farm on distribution networks and improve the operational efficiency of wind farm. In the simulation, the radial distribution network of IEEE 13 bus was modeled using PSCAD/EMTDC.

An Adaptive Relaying Algorithm on Utilities' Electrical Feeders for Improving the Reliable Operation of Wind Farm Interconnected with Utility Grid (계통 연계 풍력발전단지의 운전효율 향상을 위한 배전 계통의 적응형 보호 계전 알고리즘)

  • Jang, Sung-Il;Kim, Ji-Won;Choi, Don-Man;Kim, Kwang-Ho;Kim, Hyung-Rae
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.338-341
    • /
    • 2003
  • This paper proposes the adaptive relaying algorithm of protective devices applied in the neighboring distribution feeders for reliable and efficient operations of a wind farm interconnected with distribution networks by dedicated lines. Generally, it would be highly possible that the wind turbine generators are influenced by abnormal grid conditions such as disturbances occurring in the neighboring distribution feeders as well as the dedicated power line. The delayed operation time of protective devices for satisfying the coordination might overly expose the interconnected wind turbine generators to the fault and cause damage to them. In order to reduce the damages on the interconnected wind farm about the faults happening in distribution networks, this paper describes the proper delayed operation time of protective relay.

  • PDF

Assessment of the Protection Algorithm Applied in Distributed Generations for Faults Occurred in the Interconnected Distribution Networks (외부 배전선 사고에 대한 분산전원 보호 알고리즘의 동작 수준 평가)

  • Jang, S.I.;Kim, S.G.;Park, Y.U.;Kim, K.H.;Choi, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.337-340
    • /
    • 2003
  • This paper describes the operational characteristics of protection algorithm applied in distributed generations(DG) for faults occurred in the interconnected distribution networks. The DG can be Influenced by abnormal grid conditions such as disturbances occurring in the neighboring distribution feeders as well as the interconnected power line. Particularly, in case of the fault happening in the neighboring distribution feeders emanated from the substation to which DG is connected, the protective devices in the DG might mis-operate. The mis-operation of protective devices can be varied by the fault conditions. The simulation results for Hoenggye substation model composed of five feeders using PSCAD/EMTDC showed that the number of mis-operation of protective devices applied in DG is about 0.66 times per one year.

  • PDF

Minimum BER Power Allocation for OFDM-based Cognitive Radio Networks

  • Xu, Ding;Li, Qun
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.7
    • /
    • pp.2338-2353
    • /
    • 2015
  • In this paper, the optimal power allocation algorithm that minimizes the aggregate bit error rate (BER) of the secondary user (SU) in a downlink orthogonal frequency division multiplexing (OFDM) based cognitive radio (CR) system, while subjecting to the interference power constraint and the transmit power constraint, is investigated under the assumption that the instantaneous channel state information (CSI) of the interference links between the secondary transmitter and the primary receiver, and between the primary transmitter and the secondary receiver is perfectly known. Besides, a suboptimal algorithm with less complexity is also proposed. In order to deal with more practical situations, we further assume that only the channel distribution information (CDI) of the interference links is available and propose heuristic power allocation algorithms based on bisection search method to minimize the aggregate BER under the interference outage constraint and the transmit power constraint. Simulation results are presented to verify the effectiveness of the proposed algorithms.

A New Volt/Var Control of Substation for Distribution Volt/Var Regulation (배전계통 전압/무효전력조정을 위한 새로운 전압/무효전력제어 방식)

  • Choi, Joon-Ho;Kim, Jae-Chul;Son, Hag-Sig;Im, Tae-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.285-288
    • /
    • 2001
  • In this paper we proposed the on line volt/var control schemes of the load Tap Changer (LTC) transformer and shunt capacitor bank for distribution volt/var regulation. In the existing volt/var control of the distribution substation, the voltage of feeders and var of distribution systems is mainly controlled by the LTC transformer tap position and on/off status of the shunt capacitor. The LTC and shunt capacitor bank has discrete operation characteristics and therefore it is very difficult to control volt/var at the distribution networks within the satisfactory levels. Also there is limitation of the operation times of the LTC and shunt capacitor bank because it is affects on their functional lifetime. The proposed volt/var control algorithm determine an optimal tap position of LTC and on/off status of shunt capacitors at a distribution network with the multiple feeders. The mathematical equations of the proposed method are introduced. Simple case study was performed to verify the effectiveness of the proposed method.

  • PDF

Optimal Location and Sizing of Shunt Capacitors in Distribution Systems by Considering Different Load Scenarios

  • Dideban, Mohammadhosein;Ghadimi, Noradin;Ahmadi, Mohammad Bagher;Karimi, Mohammmad
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.5
    • /
    • pp.1012-1020
    • /
    • 2013
  • In this work, Self-adaptive Differential Evolutionary (SaDE) algorithm is proposed to solve Optimal Location and Size of Capacitor (OLSC) problem in radial distribution networks. To obtain the SaDE algorithm, two improvements have been applied on control parameters of mutation and crossover operators. To expand the study, three load conditions have been considered, i.e., constant, varying and effective loads. Objective function is introduced for the load conditions. The annual cost is fitness of problem, in addition to this cost, CPU time, voltage profile, active power loss and total installed capacitor banks and their related costs have been used for comparisons. To confirm the ability of each improvements of SaDE, the improvements are studied both in separate and simultaneous conditions. To verify the effectiveness of the proposed algorithm, it is tested on IEEE 10-bus and 34-bus radial distribution networks and compared with other approaches.