• Title/Summary/Keyword: Discharge plan

Search Result 251, Processing Time 0.023 seconds

A Case Research of Application of Submarine Structure for Discharge in the Power Plants (발전소 해양 배수 구조물의 적용사례)

  • Park, See-Boum;Bae, Dong-Chan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1689-1692
    • /
    • 2008
  • In this research, these days extension of electric power station plant and new building plan is tending to more bigger size and much more cooling water for discharge, therefore submarine structure for discharge has needed various types and the large one. The domestic power plant was applied to once-through CW system structure that pipe line type, immersed PC-box culvert type and submarine headrace tunnel type of discharge structure. It is possible that the future structure type of submarine discharge is expected by a case research of application and plan.

  • PDF

A Study of Effective Discharge Method for Sedimentation Sludge (침전슬러지의 효율적인 배출방안에 관한 연구)

  • Oh, Sueg-Young;Byun, Doo-Gyoon
    • The KSFM Journal of Fluid Machinery
    • /
    • v.8 no.2 s.29
    • /
    • pp.16-22
    • /
    • 2005
  • This research inspects the discharge state for inside of sedimentation basin, and, through the aboard literature and data, examine sedimentation sludge about discharge plan of effective sedimentation sludge that can discharge in state of high concentration. In this study, we are going to attempt an economy with improvement efficiency for discharge of sedimentation sludge in a water treatment plant.

A Study of Optimal Water Supply Planning in Mountainous Area (산지유역에서의 최적용수공급방안에 관한 연구)

  • Kim, Ji-Hak;Park, Ki-Bum
    • Journal of Environmental Science International
    • /
    • v.15 no.10
    • /
    • pp.967-973
    • /
    • 2006
  • In this study used tank model and specific discharge to calculate low-flow of mountain basin and supply data that need in water resources plan. Low-flow is calculated byspecific discharge and area ratio method as resulted that calculate storage of low-flow by tank model was construed that showd all similar aspect. In judged to help in water resources plan establishment calculating low-flow using model to supplement uncertainty of observed data in that calculate of low-flow ungaged mountain area. It shows by economical and realistic plan until 12 years after development that run parallel and use economic performance analysis result valley flow and groundwater. But wide area water services and Chungju dam since 12 years onward was expose that is economic.

A Study on effective Discharge Equipment for Sedimentation Basin (효율적인 침전슬러지 배출설비에 관한 연구)

  • Park, Jae-Kyeoung;Oh, Sueg-Young;Lee, Nam-Young;Oh, Jeong-Jin
    • 유체기계공업학회:학술대회논문집
    • /
    • 2003.12a
    • /
    • pp.259-264
    • /
    • 2003
  • This research inspects discharge state of inside of sedimentation basin, md, through the aboard literature and data, examine sedimentation sludge about discharge plan of effective sedimentation sludge that can discharge in state of high concentration.

  • PDF

Development and Evaluation of Sediment Delivery Ratio Equation using Clustering Methods for Estimation of Sediment Discharge on Ungauged Basins in Korea (국내 미계측 유역의 유사유출량 예측을 위한 군집별 유사전달율 산정식 도출 및 평가)

  • Lee, Seoro;Park, Sang Deog;Shin, Seung Sook;Kim, Ki-sung;Kim, Jonggun;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.5
    • /
    • pp.537-547
    • /
    • 2018
  • Sediment discharge by rainfall runoff affects water quality in rivers such as turbid water, eutrophication. In order to solve various problems caused by soil loss, it is important to establish a sediment management plan for watersheds and rivers in advance. However, there is a lack of sediment data available for estimating sediment discharge in ungauged basins.. Thus, reasonable research is very important to evaluate and predict the sediment discharge quantitatively. In this study, cluster analysis was conducted to classify gauged watersheds into hydrologically homogeneous groups based on the watershed characteristics. Also, this study suggests a method to efficiently predict the sediment discharge for ungauged basins by developing and evaluating the SDR equations based on the PA-SDR module. As the result, the SDR equations for the classified watersheds were derived to predict the most reasonable sediment discharge of ungauged basins with 0.24 % ~ 10.89 % errors. It was found that the optimal parameters for the gauged basins reflect well characteristic of sediment movement. SDR equations proposed in this study will be available for estimating sediment discharge on ungauged basins. Also it is possible to utilize establishing the appropriate sediment management plan for integrated management of watershed and river in Korea.

Estimation of Maintenance Flow for Suitable Utilization of Fishway (어도의 적절한 이용을 위한 유지유량 평가)

  • Kim, Seok-gyu;Kim, Chul;Kim, Seonghwan;Ko, Kwangyong
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.2
    • /
    • pp.281-287
    • /
    • 2009
  • Achieved monitoring regularly about fishway that is a intake dam belongings to Kyeongchon for 5 years. Result that achieve monitoring, discovered pressing issue of opening and closing degree of discharge control part in fishway. In this research, analyze discharge relation with fishway and intake sluice and presented operation plan of opening and closing of discharge control part. Investigated necessity intake discharge and benefited area to analyze relation of discharge that is flowed in fishway and discharge escaping by intake sluice. When opened discharge control part step by step gradually, analyzed discharge. Compared with survey discharge making ration curve of fishway and intake sluice using orifice and submerged weir formula. Because operation of intake dam is necessary intake discharge and upriver inflow discharge by time, operation uses by survey discharge and calculated opening discharge of fishway by opening discharge of intake sluice via monthly inflow discharge. To sum up, calculated floodgate opening height of fishway by water level to present maintenance standard of intake dam.

The Characteristic of Frequency Spectrum of Electromagnetic Waves Radiated from Discharge in Air (기중방전 진전에 따른 방사전자파의 주파수 스펙트롬 특성)

  • 박광서;윤대희;박창기;주재현;최병주;이광식;이동인
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1999.11a
    • /
    • pp.285-289
    • /
    • 1999
  • Insulation diagnosis techniques of power equipments for the stable power supply and prevention from accidents are of high importance. Diagnosis techniques is able to prevent from large accidents before they happen by finding signs of the accidents. From this point of view, this paper simulated discharge progress and partial discharge using needle-plan electrode system in air, studied the distribution of frequency spectrum of the radiated electromagnetic waves using biconical antenna and spectrum analyzer. From results of this study, the new method was introduced for measurement and analyzation of the radiated electromagnetic waves in accordance with discharge progress in air, Besides, according to the consideration of the mutual relation between frequency spectrum of the radiated electromagnetic waves and discharge progress, it was confirmed that detecting partial discharge and estimating discharge progress were possible.

  • PDF

Characterization on the Pollution Discharge Load at the Unit Watershed for the Management of Total Maximum Daily Loads - in Guem River Basin (수질오염총량관리 단위유역별 오염물질 배출부하량 특성분석 - 금강수계를 대상으로)

  • Park, Jun Dae;Choi, Ok Youn;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.786-795
    • /
    • 2012
  • Water quality management should be focused on the pollution concentrated area so that the improvement of water quality can be achieved effectively for the management of Total Maximum Daily Loads (TMDLs). It is necessary to consider discharge characteristics in the TMDL plan. This study analysed discharge characteristics such as pollution generation and discharge load density, and reduction potential by each unit watershed, and categorized the unit watershed into four groups according to its discharge load characteristics. This analysis can be used as helpful information for the prioritization of pollution reduction area and selection of pollution reduction measures in the development of TMDL plans.

Design of the discharge cleaning system for KSTAR vacuum vessel (KSTAR 제1벽 세정을 위한 방전세정 시스템 설계)

  • Jeong, S.H.;In, S.R.
    • Journal of the Korean Vacuum Society
    • /
    • v.16 no.5
    • /
    • pp.383-387
    • /
    • 2007
  • In this paper the design of the discharge cleaning system for KSTAR vacuum vessel is described. We first discuss about the parameters which are related the efficiency of discharge cleaning. The RG(RF-assisted Glow) discharge which has the ignition and sustain pressure lower than those in the case of DC discharge, thus has the higher efficiency of discharge cleaning. So we adopt the RG discharge, in practical design, for KSTAR discharge cleaning system. For uniformity of the cleaning effect, we plan to install two discharge cleaning systems in A- and I-port of the KSTAR vacuum vessel. The designed system will be adapted for the study of the fuel recycling and of the boronization as well as the discharge cleaning of the KSTAR vacuum vessel.

Expected Annual Damage Estimation with Uncertainty (불확실성을 고려한 연피해 기대치 산정)

  • Kim, Hung Soo;Kim, Yoo Jin;Lee, Ji-Won
    • Journal of Wetlands Research
    • /
    • v.5 no.1
    • /
    • pp.41-52
    • /
    • 2003
  • The flood damage reduction studies have been performed by the channel improvement plan and the levee has mainly constructed with the freeboard concept. However, the freeboard concept might be an inappropriate choice as a safety factor of the levee because many uncertainties are involved in the procedure of the channel improvement plan studies. So, we considered the uncertainties In the discharge-probability, stage-discharge, and stage-damage functions and estimate the expected annual damage. The Monte Carlo technique for uncertainty analysis is used. As our results, the expected annual damage with uncertainty shows the larger value than without uncertainty. Since the expected annual damage with uncertainty already considers the safety factor it is the proper result. However, the expected annual damage without uncertainty does not consider the safety factor yet. Thus, if the expected annual damage without uncertainty considers the freeboard concept, it could be compared with the expected annual damage with uncertainty for the evaluation of the overestimation or underestimation of the levee construction.

  • PDF