• 제목/요약/키워드: Discharge estimation

검색결과 561건 처리시간 0.054초

장기유출의 수문적 모형개발을 위한 주요 수계별 단위도 유도 (Determination of Unit Hydrograph for the Hydrological Modelling of Long-term Run-off in the Major River Systems in Korea)

  • 엄병현;박근수
    • 한국농공학회지
    • /
    • 제26권4호
    • /
    • pp.52-65
    • /
    • 1984
  • In general precise estimation of hourly of daily distribution of the long-term run-off should be very important in a design of source of irrigation. However, there have not been a satisfying method for forecasting of stationar'y long-term run-off in Korea. Solving this problem, this study introduces unit-hydrograph method frequently used in short-term run-off analysis into the long-term run-off analysis, of which model basin was selected to be Sumgin-river catchment area. In the estimation of effective rainfall, conventional method neglects the Soil moisture condition of catchment area, but in this study, the initial discharge (qb) occurred just before rising phase of the hydrograph was selected as the index of a basin soil moisture condition and then introduced as 3rd variable in the analysis of the reationship between cumulative rainfall and cumulative loss of rainfall, which built a new type of separation method of effective rainfall. In next step, in order to normalize significant potential error included in hydrological data, especially in vast catchment area, Snyder's correlation method was applied. A key to solution in this study is multiple correlation method or multiple regressional analysis, which is primarily based on the method of least squres and which is solved by the form of systems of linear equations. And for verification of the change of characteristics of unit hydrograph according to the variation of a various kind of hydrological charateristics (for example, precipitation, tree cover, soil condition, etc),seasonal unit hydrograph models of dry season(autumn, winter), semi-dry season (spring), rainy season (summer) were made respectively. The results obtained in this study were summarized as follows; 1.During the test period of 1966-1971, effective rainfall was estimated for the total 114 run-off hydrograph. From this estimation results, relative error of estimation to the ovservation value was 6%, -which is mush smaller than 12% of the error of conventional method. 2.During the test period, daily distribution of long-term run-off discharge was estimated by the unit hydrograph model. From this estimation results, relative error of estimation by the application of standard unit hydrograph model was 12%. When estimating by each seasonal unit bydrograph model, the relative error was 14% during dry season 10% during semi-dry season and 7% during rainy season, which is much smaller than 37% of conventional method. Summing up the analysis results obtained above, it is convinced that qb-index method of this study for the estimation of effective rainfall be preciser than any other method developed before. Because even recently no method has been developed for the estimation of daily distribution of long-term run-off dicharge, therefore estimation value by unit hydrograph model was only compared with that due to kaziyama method which estimates monthly run-off discharge. However this method due to this study turns out to have high accuracy. If specially mentioned from the results of this study, there is no need to use each seasonal unit hydrograph model separately except the case of semi-dry season. The author hopes to analyze the latter case in future sudies.

  • PDF

와이어 가공 조건 자동 생성 2 단계 신경망 추정 (Automatic Generation of Machining Parameters of Electric Discharge Wire-Cut Using 2-Step Neuro-Estimation)

  • 이건범;주상윤;왕지남
    • 한국정밀공학회지
    • /
    • 제15권2호
    • /
    • pp.7-13
    • /
    • 1998
  • This paper presents a methodology for determining machining conditions in Electric Discharge Wire-Cut. Unification of two phase neural network approach with an automatic generation of machining parameters is designed. The first phase neural network, which is 1 to M backward-mapping neural net, produces approximate machining conditions. Using approximate conditions, all possible conditions are newly created by the proposed automatic generation procedure. The second phase neural net, which is a M to 1 forward-mapping neural net, determines the best one among the generated candidates. Simulation results with ANN are given to verify that the presenting methodology could apply for determining machining parameters in Electric Discharge Wire-Cut.

  • PDF

수리실험에 의한 조력발전용 수문의 유량계수 산정에 관한 고찰 (Study on the Estimation of Discharge Coefficient of Sluice for Tidal Power Generation by Performing Physical Experiment)

  • 오상호;이광수;이달수;장세철
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 추계학술대회 초록집
    • /
    • pp.160.1-160.1
    • /
    • 2011
  • In this study, the influence of methodology of assessing water levels on the discharge coefficient of sluice for tidal power generation was investigated. A physical experiment was performed in a planar open channel by installing 1/70 scale model of the sluice caisson in the planar open channel. In front of and behind the sluice model, sloping bathymetry was made to reproduce corresponding field condition. By analyzing the experimental results, it was found that the location of measuring water levels significantly affects the estimates of the discharge coefficient, due to the variability of the parameter according to the head difference between the measuring locations. Therefore, it is necessary to be careful in estimating and utilizing the discharge coefficient in the relevant study of a tidal power generation.

  • PDF

신경망을 이용한 전력용 변압기의 부분방전 위치추정 (Estimation of The Partial Discharge Position Using Neural Networks in The Power Transformers)

  • 김재철;윤용한;김영식;권동진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1994년도 하계학술대회 논문집 C
    • /
    • pp.1649-1651
    • /
    • 1994
  • This paper presents a new method for estimating partial discharge position using improved cross-correlation technique and neural networks in the power transformer. When ultrasonic signal is occurred by partial discharge, we detected these signals and calculated cross-correlation values with Hamming window. Also, we estimated partial discharge position using neural network with cross-correlation values. In the result of case study, we can estimate more accurately the partial discharge position than any other algorithms.

  • PDF

수력 발전기 권선에서의 운전중 부분방전 측정기법 (On-line partial discharge measurement techniques of hydro-generator windings)

  • 황동하;김진봉;김용주;박명수;김택수
    • 대한전기학회논문지
    • /
    • 제45권2호
    • /
    • pp.294-300
    • /
    • 1996
  • In hydro-generator, a groundwall insulation of stator windings gradually deteriorates due to mechanical, thermal, electrical and environmental stresses. These stresses combine to result in loose windings, delamination of the stator insulation and/or electrical tracking of the endwinding, all of which can lead to stator insulation failures. Conventionally, off-line tests such as partial discharge measurement, DC/AC current and .DELTA.tan.delta. tests has been used for estimation of winding condition. However, off-line test requires large power supply and generator outage. In addition, major cause of insulation problems such as loose wedges and slot dischages may not be found with off-line diagnoses. This paper introduces the on-line partial discharge measurement techniques using frequency spectrum analyzer(FSA) for the generator stator windings. The experimental results from the UIAM #1 hydro-generator confirms a optimistic application of on-line generator diagnosis method as a reliable tool for evaluation of winding condition.

  • PDF

Estimation of Discharge for the Amazon River Branches with Wavelet Analysis

  • Katabira, Kyoichiro;Ogawa, Susumu;Sakurai, Takako;Takagi, Mikio
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
    • /
    • pp.346-348
    • /
    • 2003
  • In this study, we attempted to estimate the discharge of the Amazon River branches from JERS-1/SAR images, which are independent of the weather. We visualized some traces of the Amazon River branches, transformed river shapes into a one-dimensional signal, and calculated the characteristics of the river shapes such as the meandering wavelength and the amplitude with Fourier and wavelet analysis. Then, we related the characteristics of the river shapes with the existing discharge data and derived some regression equations. Finally, we estimated the discharge of the Amazon River branches from the SAR images.

  • PDF

Minimum Entropy Deconvolution을 이용한 지하수 상대 재충진양의 시계열 추정법

  • 김태희;이강근
    • 한국지하수토양환경학회:학술대회논문집
    • /
    • 한국지하수토양환경학회 2003년도 추계학술발표회
    • /
    • pp.574-578
    • /
    • 2003
  • There are so many methods to estimate the groundwater recharge. These methods can be categorized into four groups. First groupis related to the water balance analysis, second group is concerned with baseflow/springflow recession, and third group is interested in some types of tracers; environmental tracers and/or temperature profile. The limitation of these types of methods is that the estimated results of recharge are presented in the form of an average over some time period. Forth group has a little different approach. They use the time series data of hydraulic head and specific yield evaluated from field test, and the results of estimation are described in the sequential form. But their approach has a serious problem. The estimated results in forth typeof methods are generally underestimated because they cannot consider the discharge phase of water table fluctuation coupled with the recharge phase. Ketchum el. at. (2000) proposed calibrated method, considering recharge- and discharge-coupled water table fluctuation. But the dischargeis considered just as the areal average with discharge rate. On the other hand, there are many methods to estimate the source wavelet with observed data set in geophysics/signal processing and geophysical methods are rarely applied to the estimation of groundwater recharge. The purpose this study is the evaluation of the applicability of one of the geophysical method in the estimation of sequential recharge rate. The applied geophysical method is called minimum entropy deconvolution (MED). For this purpose, numerical modeling with linearized Boussinesq equation was applied. Using the synthesized hydraulic head through the numerical modeling, the relative sequenceof recharge is calculated inversely. Estimated results are very concordant with the applied recharge sequence. Cross-correlations between applied recharge sequence and the estimated results are above 0.985 in all study cases. Through the numerical test, the availability of MED in the estimation of the recharge sequence to groundwater was investigated

  • PDF

최적화된 pRBF 뉴럴 네트워크에 이용한 삼상 부분방전 패턴분류에 관한 연구 (A Study on Three Phase Partial Discharge Pattern Classification with the Aid of Optimized Polynomial Radial Basis Function Neural Networks)

  • 오성권;김현기;김정태
    • 전기학회논문지
    • /
    • 제62권4호
    • /
    • pp.544-553
    • /
    • 2013
  • In this paper, we propose the pattern classifier of Radial Basis Function Neural Networks(RBFNNs) for diagnosis of 3-phase partial discharge. Conventional methods map the partial discharge/noise data on 3-PARD map, and decide whether the partial discharge occurs or not from 3-phase or neutral point. However, it is decided based on his own subjective knowledge of skilled experter. In order to solve these problems, the mapping of data as well as the classification of phases are considered by using the general 3-PARD map and PA method, and the identification of phases occurring partial discharge/noise discharge is done. In the sequel, the type of partial discharge occurring on arbitrary random phase is classified and identified by fuzzy clustering-based polynomial Radial Basis Function Neural Networks(RBFNN) classifier. And by identifying the learning rate, momentum coefficient, and fuzzification coefficient of FCM fuzzy clustering with the aid of PSO algorithm, the RBFNN classifier is optimized. The virtual simulated data and the experimental data acquired from practical field are used for performance estimation of 3-phase partial discharge pattern classifier.

평균유속공식을 활용한 하천 유량 산정 (Estimation of Discharge Using Mean Velocity Equations)

  • 추태호;고덕구;이상진
    • 한국수자원학회논문집
    • /
    • 제43권3호
    • /
    • pp.265-273
    • /
    • 2010
  • 본 연구에서는 기존의 수위만을 고려하여 작성된 수위-유량관계곡선식을 개선하기 위하여 경심, 하상경사, 수심 등 비교적 쉽게 취득할 수 있는 하천의 수리특성인자를 활용하여 유량을 산정할 수 있는 방법을 제안하였다. 알버타대학에서 제공된 보고서 내용 중 수리실험실 및 자연하천의 수리자료를 활용하여 평균유속 공식인 Manning식과 Chezy식으로부터 하천의 수리학적 특성이 반영된 조도계수 n값과 C값을 산정하고 이를 토대로 유량을 산정하였다. 제안된 유량산정 방법은 실측치에 근사하여 정확도가 개선됨을 확인하였으며 기존의 수위-유량관계곡선식에서 추정된 유량과 비교하고 그 적용성을 검토하였다.

VRFB를 위한 BOP 구성 및 BMS 기능구현에 관한 연구 (A Study on the Configuration of BOP and Implementation of BMS Function for VRFB)

  • 최정식;오승열;정동화;박병철
    • 조명전기설비학회논문지
    • /
    • 제28권12호
    • /
    • pp.74-83
    • /
    • 2014
  • This paper proposes a study on the configuration of balancing of plant(BOP) and implementation of battery management system(BMS) functions for vanadium redox flow battery(VRFB) and propose a method consists of sensor and required design specifications BOP system configuration. And it proposes an method of the functions implementation and control algorithm of the BMS for flow battery. Functions of BMS include temperature control, the charge and discharge control, flow control, level control, state of charge(SOC) estimation and a battery protection through the sensor signal of BOP. Functions of BMS is implemented by the sensor signal, so it is recognized as a very important factor measurement accuracy of the data. Therefore, measuring a mechanical signal(flow rate, temperature, level) through the BOP test model, and the measuring an electrical signal(cell voltage, stack voltage and stack current) through the VRFB charge-discharge system and analyzes the precision of data in this paper. Also it shows a good charge-discharge test results by the SOC estimation algorithm of VRFB. Proposed BOP configuration and BMS functions implementation can be used as a reference indicator for VRFB system design.