Purpose: This study was conducted to compare three discharge criteria; 1) discharge criteria of S Hospital determined by nurses, 2) discharge readiness determined by patients, and 3) the Modified Post-Anesthetic Discharge Scoring System (MPADSS). The usefulness of MPADSS as a discharge criteria for the patients'safe return to home after ambulatory surgery was also evaluated. Methods: A total of 370 day surgery cases were investigated. The MPADSS was employed in every 30 min. in parallel with discharge readiness assessment by nurses and patients. The percentage of the patients who were categorized as being ready to discharge were compared according to three discharge criteria. Results: The percentage of patients scored to be as MPADSS > 9 in 30 min, 60 min, 90 min were 96.5%, 99.5%, 100%respectively. Whereas 11.1%, 44.3%, 71.1%of patients rated themselves as being ready to discharge and 2.7%, 23.5%, 54.3% of patients actually discharged by nurses according to discharge criteria of S Hospital. Conclusion: Nurses tend to keep patients longer in the hospital when compared to the patient's own assessment about their readiness to home and to that of MPADSS. Faster discharge in the evening than day time suggests patient discharge can be influenced by nursing factors. This brings out the importance of scoring system to determine the safe discharge. The MPADSS could be a useful tool in evaluating patients for safe discharge.
The purpose of this study was to develop Intensive Care Unit (ICU) admission and discharge criteria that would lead to the appropriate utilization of ICU resources and nursing services. For this study, a conceptual framework was developed through a review of the literature. Then in order to identify the overall health condition of patients in the ICU, and to draw up preliminary criteria, the medical records of 58 patients who were admitted to the ICU of Y Medical Center in Seoul between March, 1999 to February, 2000 of were analyzed. Two expert validity tests were done for the preliminary criteria for admission and discharge with 21 patients over 18 years of age who were admitted patients and for 12 patients who were discharged between May 30, 2000 and June 5, 2000 a clinical validity test was also done. After this process, the final admission and discharge criteria were developed. The results of this study are summarized as follows: 1. After a review of the literature, there were 9 categories for admission criteria cardiologic, gastrointestinal, neurologic, endocrine, post-op care of major surgery, vital signs, laboratory values, and a category of miscellaneous items. Discharge criteria had 3 categories which were vital signs, laboratory values, and a category of miscellaneous items. 2. From the medical records of the 58 patients who were admitted to the ICU, 45 items for preliminary criteria for admission and 17 for discharge were identified. 3. The two expert validity tests showed that of the 45 items 29 admission items received over 75 percent agreement. The 16 admission items which received less than 75 percent agreement were revised or deleted from the admission criteria. Of the 17 discharge items, 11 had over 75 percent agreement and 6 less then 75 percent agreement. These were revised or deleted from the discharge criteria. 4. In the clinical validity test, 14 admission items showed more than 75 percent agreement and 11 discharge items more than 83 percent agreement. 5. The final criteria consisted of 29 items for admission and 11 items for discharge. Since patients being considered for admission to the ICU have complex problems, there is a need to make the decision based on more than a single issue. This tool will insure that the ICU nursing care and treatment resources are appropriately used by allowing a multi-professional health team to make admission and discharge decisions.
The recent rainfall has happened to exceed the design rainfall after 1990 often, due to the characteristic of the rain to be changed. So, it is failing the ability safety of flood defense equipments to exist. This study analyzed the rainfall of Busan in 2003 since 1961 through the FARD2002(Frequency Analysis of Rainfall Duration). The result is equal to the thing which the design rainfall increased a little since 1991. The change of design rainfall created the result to be a flood discharge increase. This study investigated about the impact to influence on the river bank according to the change of flood discharge, the rainfall pattern change as well. This study used the program of HEC-RAS with HEC-HMS and calculated flood discharge with flood level of river. The result is equal to the thing which the computation became a flood level which exceed 50year(River design criteria-Korea water resources association 2002) criteria with 30year(River establishment criteria-Ministry of construction & transportation 1993), because of an area of impermeability increased of model basin.
In this paper we suggest new criteria for the classification of the electrode gap between common and scan electrodes. The electrode gap is categorized as a short, middle, and long gap according to the criteria. Among these structures, we focus on the erase waveform of a mid-gap structure. we report an unstable discharge arising from the erase ramp period in a mid-gap structure. Based on the Vt close curve, we analyze the unstable discharge at various conditions. Our analysis reveals that the unstable discharge is ignited between surface electrodes and caused by un-erased wall charges accumulated on the outer edges of electrodes. By reducing the voltage level of the last sustain pulse, the problem is solved.
Durability of tunnel drains is important, because the accumulation of groundwater around the tunnel due to clogging of filter or reduction of discharge capacity of drain causes reduction of the life time of tunnel linings. In this paper, clogging and discharge capacity of drain and filter of tunnels are evaluated using a gradient ratio test and filter design criteria. The results of the gradient ratio test showed that gradient ratio(GR) is high when fine content is high in the soil samples and equivalent opening size(EOS) of filter materials is small. Measured GR was less than allowable critical gradinet ratio : 3.0, which is the clogging criteria of U.S. Army Corps of Engineers.
Purpose: In this study, we investigated the clinical profile, survival at discharge, and proportion of children with acute liver failure (ALF) meeting the criteria for, yet surviving without, liver transplantation (LT). Methods: Medical case records of children aged >28 days to ≤15 years over a period of 7 years, identified from pediatric admission and discharge registers, were screened. Children satisfying the criteria for ALF were included in this study. Results: A total of 71 records meeting the pediatric ALF (PALF) criteria were included. The survival rate at discharge was 61% (n=44). A considerable proportion of children satisfied the King's College Criteria (KCC) (56.3%) and the European Association for the Study of the Liver (EASL) criteria (7%) for LT at admission. Nonetheless, the survival rate in the absence of LT was 42.5% in children who satisfied the KCC and 20% in those who met the EASL criteria. Infection (29.5%) and paracetamol overdose (19.7%) were the major identifiable causes of PALF. Hepatitis A was the most common infection identified. No significant predictors of poor outcomes were identified in multivariable analysis. Conclusion: Our study highlights the changing survival rates and the clinical and etiological profiles of patients with PALF. In areas with poor access to LT services, survival in these children could be improved through early referral to centers with adequate intensive care facilities. Preventing ALF and referring patients to LT services are paramount to reducing mortality.
Currently government certified test method for an automobile remanufactured products is insufficient. Thus many automotive parts in the remanufacturing market are lacking proper evaluation criteria and production of defective products are causing customer dissatisfaction. In this paper a power steering oil pump, which requires stringent manufacturing standards, is studied by the failure mode and effect analysis approach. The research suggested that the test criteria such as discharge flow characteristic test, tightness test, pulley run-out test, pressure switch operation test, low temperature test and rotation pressure durability test should be performed to evaluate the reliability of remanufactured power steering oil pumps. As a result of tests, the performance of remanufactured power steering oil pump satisfied the evaluation criteria of pressure switch operation test and low temperature test. However, the remanufactured power steering oil pump failed to satisfy the evaluation criteria on discharge performance test, tightness test and pulley run-out test. These performance evaluation tests proved the necessity of standard process for the remanufactured power steering oil pump.
In this study, occurrence status of nonpoint pollutants and characteristics of discharge by each nonpoint pollutants were examined through monitoring on nonpoint pollutants caused when raining in vineyard belonging to the agricultural area of various land use patterns. Also, the first flush analysis limited to studies on the existing non-percolation area was applied to percolation area to ascertain availability and criteria of study. Various water quality and sluice of nonpoint pollutants were analyzed, based on which discharge of nonpoint pollutants in agricultural area was ascertained to be influenced greatly by artificial factors such as period, cultivation, management, etc. Meanwhile, the first flush phenomenon at agricultural area was ascertained to occur, and the first flush was quantified through calculation of the first flush ratio. If MFF30 is based, discharge load by each nonpoint pollutants caused when raining was investigated to include 40.8% on the basis of total discharge. In case of SS in pollutants showed the highest first flush phenomenon of 64.8%. Through such a result, calculation possibility of the initial rain criteria was ascertained, and it was determined that reliability-assured criteria were calculated through further monitoring.
이 연구에서는 2006년 집중호우 시 산사태 및 토석류가 발생한 강원도 인제군의 기룡산 유역을 대상으로 사면붕괴 및 계상변동을 추정하여 만사 상태에 도달한 불투과형 사방댐이 토사유출 조절에 미치는 영향을 정량적으로 해석하고, 이를 토대로 사방댐의 설계 및 준설기준을 고도화하는 데에 필요한 새로운 인자를 제안하였다. 일반적으로 사방댐은 계획평형기울기 구간과 계획홍수기울기 구간에서 각각 토사유출의 억제와 조절 기능을 발휘하고 있다. 연구대상유역에 시공된 불투과형 사방댐은 계획억제토사량에 해당하는 저사량이 $2,111m^3$로 설계되었지만, 2006년 집중호우로 인한 산지교란 발생 시에는 해당 사방댐 직상부로부터 250 m의 계류구간에 걸쳐 $3,996m^3$의 유출토사를 조절한 것으로 관측되었다. 결과적으로 해당 사방댐은 유출토사 억제를 위한 계획억제토사량보다 큰 규모의 계획조절토사량을 나타내어 만사된 이후에도 유출토사의 조절이라는 사방댐의 기능을 발휘하고 있었다. 이와 같이 사방댐의 토사유출 조절기능은 토사유출 억제기능과 구분하여 평가하여야 하지만, 현재 우리나라에서는 현지에서 유역 특성을 실측한 자료를 기반으로 한 계획억제토사량 또는 계획조절토사량을 사방댐의 설계 및 준설기준 인자로서 고려하고 있지 않다. 따라서 합리적인 사방댐의 설계 및 유지관리 기준을 마련하기 위해서는 사방댐의 토사유출 억제기능과 조절기능을 정량적으로 해석한 현장자료가 축적되어야 하며, 이는 우리의 사방기술이 보다 객관적이고도 체계적인 면모를 갖춘 과학적 기술로 발전할 수 있는 방안일 것이다.
In the vertical drain method, discharge capacity is generally one of the most important factor which affect on the estimation of the drain efficiency. However, adopting the drain considering discharge capacity only is not sufficiently considered method so that systematic criteria for adoption is necessary to choose the most suitable drain. Therefore, this study represents the application method considering behavior of the ground and vertical drain which is coupled together and ground improvement efficiency analyzing various cases of discharge capacity test performed in the recent soft ground improvement projects. According to the analysis, most drains tend to satisfy the required discharge capacity. It presents that deformed shape of the drains and well resistance estimation along the ground settlement, improvement efficiency by water content ratio along the depth and shear strength obtained after ground improvement should be considered altogether with the discharge capacity to select the proper drain. Also, appropriate adoption of drain material considering the ground condition is vital through analyzing the field measured data and comparing the result of the discharge capacity test as various vertical drain materials are being constructed continuously.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.