• Title/Summary/Keyword: Digital Mock-up Test

Search Result 10, Processing Time 0.034 seconds

Performance Evaluations of Mock-up Tests for ALC Panel Curtain Wall in Building Exterior (ALC 패널을 활용한 건축물 외장 커튼월에 대한 Mock-up Test 성능 평가 연구)

  • Kim, Young-Ho;Lee, Yong-Soo
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.4
    • /
    • pp.25-32
    • /
    • 2013
  • The green building is one of biggest factors to go the goal of energy saving and environmental conservation, reduction of energy consumption, friendly energy technology, recycling of resource, and environmental pollution reduction technology. The purpose of these green buildings realized by the energy-saving technology such as the exterior materials or curtain wall system. The curtain wall system is a element that come to insulated portions of building envelope that results in heat loss. The purpose of this paper is to carried out mock-up tests for exterior wall used in autoclaved lightweight concrete panels in green building practices. Mock-up test execute a mixed process between standard test procedure and complex test procedure based on AAMA 501(American Society for Testing and Materials) and ASTM 283, ASTM 330(American Society for Testing and Materials). In results, tests meet the requirements that grant values in steps of procedures provided on ASTM and AAMA. ALC panel is suitable for a exterior wall product to be gratified thermal cycling performance and structural capacity, deflection(H/200) and lateral displacement(H/50), for curtain walls.

Development of the Interface Module for an Effective Application of a Digital Mockup

  • Song, Tai-Gil;Kim, Sung-Hyun;Lim, Gwang-Mook;Yoon, Ji-Sup;Lee, Sang-Ho
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.2407-2409
    • /
    • 2005
  • As the cumulative amount of spent fuel increases, the reliable and effective management of the spent fuel has become a world-wide mission. For this mission, KAERI is developing the Advanced Spent Fuel Conditioning Process (ACP) as a pre-disposal treatment process for spent fuel. Conventional approach to the development of the process and the remote operation technology is to fabricate the process equipment on the same scale as the real environment and demonstrate the remote handling operation using simulated fuel called a mock-up test. But this mock-up test is expensive and time consuming, since the design may need to be modified and the equipment fabricated again to account for the problems found during a testing. To deal with this problem, we developed a digital mockup for the ACP. Also, for an effective utilization of the digital mockup, we developed user interface modules such as the data acquisition and display module and the external input device interface module. The result of this implementation shows that a continuous motion of the manipulator using the external device interface can be represented easily and the information display screens responded well to the simulation situation.

  • PDF

A Study on the Problem Analysis and Quality Improvement in Fabricating Free-Form Buildings Facade Panels through Mock-up Panels Production (Mock-up 부재제작을 통한 비정형 건축 외장부재의 제작 문제점 분석 및 개선방안에 관한 연구)

  • Kwen, Soon-Ho;Shim, Hyoun-Woo;Ock, Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.11-21
    • /
    • 2011
  • The most critical issue in free-form buildings is how to construct the free-formed exterior facade panels. Their geometric complexity delivers many cons and problems in fabricating and constructing their shapes. To construct a free-form building, first of all, its skin has to be chopped into small pieces, which is called panelization. After panelization, the panels go through an optimization process to construct them economically. The panel's geometries are modified or regenerated through this optimization process. In this study, the panel optimization process of free-form buildings are performed through a case study. The panel shapes of the case study are modeled with Digital Project. To test the constructability of the various panels, 8 mock-up panels are made and laser scanning technology is applied to measure the preciseness of the panels manufactured in comparison with their original design.

Experimental Study of Remote Handling Performance for Pyroprocessing Facilities (파이로 공정장치의 원격 취급성에 관한 실험적 연구)

  • Yu, Seung-Nam;Kim, Sung-Hyun
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.5
    • /
    • pp.524-530
    • /
    • 2012
  • In this study, it is performed that the assessment of feasibility of developed material processing facilities using tele-operation manipulator system for the pyroprocessing. To evaluate the performance of developed facilities using tele-operation system, several performance indices are considered as remote visibility, remote reachability and remote manipulability. These are applied to RHEM (Remote Handling Evaluation Mock-up) and digital mock-up system respectively. Through this approaches, several requirements for the system improvement are deduced and preliminary inspection for real system application is fully performed. Additionally, assembly and disassembly tasks for the repair of remote handling system are also examined remotely in RHEM and evaluated those performances.

Construction of Aluminum Curtain Wall with 3D Elevation for TRUTEC Building (트루텍 빌딩의 3차원 입체 커튼월 시공)

  • Park, Choel;Hong, Doo-Pyo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.119-122
    • /
    • 2007
  • TRUTEC building, which is located at DMC B block is zone, is just one the office building in Soeul. TRUTEC building is designed by Barkow Leibinger Architeken in Germany, has 5 stories under and 12 stories above and has been finished with the unique three dimensional curtain wall unit. Big trial to make unique elevation succeeded as getting rid of the typical plain curtain wall unit. In addition, aluminum bars are treated by the latest CNC machine in order to achieve 3D section. Construction of curtain wall is highly focused from the moment of contract to keep the schedule because the contract period is 18 months. Regular design meeting and technical meeting between stakeholders including construction manager, designer, engineer, consultant and so on have been held during the construction to minimize the risks from the unique elevation and trial. Step by step mock-up test (design mock-up and visual mock-up on site) has been performed before functional mock-up test.

  • PDF

Preliminary Field Test on Daylighting Performance of Perpendicular Light Pipe System (수직형 라이트파이프의 채광성능에 관한 예비평가)

  • Shin, Hae Mi;Park, Hoon;Kim, Jeong Tai
    • KIEAE Journal
    • /
    • v.8 no.1
    • /
    • pp.53-60
    • /
    • 2008
  • The daylighting affects on the human biological cycles and physiological alterations. Daylighting is also an important element in visual comfort and it sometimes influences the quality of vision. Therefore the absence of natural light during the day brings contradictory result. To solve the problems of natural light lack and provide sufficient daylight in interior spaces, it might be necessary to apply some daylighting systems. One of these systems, light pipe system, which is simple, cheep and easily constructed, is very useful to apply for small buildings. The light pipe is simple means of directing daylighting (diffuse and direct lighting)into interior space. In order to application of light pipe system in Korea, it is necessary to optical data of light pipe system. This study aims to evaluate preliminary experiment of the daylighting environment of light pipe system. Light pipe system, that aspect ratio is 1:2(diameter and length), was installed in a windowless mock-up with $27m^2$. The mock-up model was constructed as a prototype of Korean office surface. Illuminance was measured with a Topcon IM-5 Luxmeter to evaluate the distribution of the illuminance on a floor. The indoor and outdoor illuminance and the internal/external illuminance ratio are compared to discuss with in the graphs. Luminance was measured with Radiant imaging Promertric 1400 that is digital photometer to evaluate the distribution of luminance on interior surface. The contrast of luminance is discussed with table and graphs.

An Effective Implementation Method for Dual Use of Web-based Multidimensional Interactive Digital Contents (웹기반 다차원 민군겸용 인터액티브 디지털 콘텐츠의 효과적인 구현 방안)

  • Gang, Seok-Hun;Kim, Dae-Cheong
    • Journal of National Security and Military Science
    • /
    • s.3
    • /
    • pp.197-242
    • /
    • 2005
  • Active catalog is a kind of digital content that enables consumers to test the functions and features of products from their PCs as if they were using it in real life, by simulating the actions and responses of the product. This new type of interactive digital content can be used extensively to make sales personnel training manuals, sales tools, user manuals and user trouble shooting documents. With active catalogs, companies will be able to compare different designs, show actions according to different functions, and evaluate user reaction to new products without having to produce a single physical prototype or mock-up. At the same time, consumers will be able to understand and 'operate' the product and make well-informed purchase decisions. In this paper, we present a visual event-driven modeling tool, PlayMo, for creating active catalogs, analyze the advantages of using PlayMo, describe the event-driven method used by PlayMo and also introduce two enhanced characteristics of the Event Flow Chart with which the events in PlayMo are structured. Interactive digital content by using the PlayMo3D makes easy, simple and effective design for e-learning, e-catalogue, e-marketing/sales, e-prototyping, customer support, etc. Through its application-ready 3D function visualization solution, engineers and designers can rapidly turn a CAD design model into a 3D interactive virtual product, and the effective function prototyping job can be also completed within a minute.

  • PDF

Development of gear type grease lubricator by rapid prototyping (쾌속조형기에 의한 기어식 주유장치의 개발)

  • Wang, Duck Hyun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.13 no.6
    • /
    • pp.46-53
    • /
    • 2014
  • An automatic grease lubricator provides an adequate amount of fresh grease constantly to any type of rotating machine to minimize friction heat and reduce friction loss. This study seeks to develop an automatic grease lubricator by means of rapid prototyping with a gear-driven mechanism and a controlled operation time. The ultimate design is to lubricate an adequate amount of grease by a simple dip-switch clicking mechanism according to an advanced set cycle. The backlash of the gear was minimized to increase the power, and to increase the power of the mechanism, the binding frequency and the thickness of the coil were changed. To control the rotation cycles of the main shaft according to certain set numbers, different resistances and chips were used in the design of the circuit which controls the electrical signals via a pulse. A digital mock-up was analyzed and the rapid prototyping (RP) trial products were tested with a PCB circuit and grease. An evaluation of the outlet capacity of RP trial products was conducted, as the friction caused by the outlet on the wall surface was an important factor in the operation of the equipment. Finally, a finishing process was applied to decrease the roughness of a surface to a comparable level to test the performance of the product.

The Development of Automatic Grease Lubricator Driven by Gear Mechanism with Controlled Operating Time (주유시간 조절이 가능한 기어 메커니즘 구동방식의 자동그리스주유기 개발)

  • Wang, Duck-Hyun;Lee, Kyu-Young;Lee, Sang-Hoon
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.23 no.2 s.179
    • /
    • pp.199-206
    • /
    • 2006
  • Automatic grease lubricator is equipment that provides adequate amount of fresh grease constantly to the shaft and the bearings of machines. It minimizes the friction heat and reduces the friction loss of machines to the least. This research is to develop automatic grease lubricator by gear driven mechanism with controlled operation time. The ultimate design of this equipment is to lubricate an adequate amount of grease by a simple switch clicking according to the advanced set cycle. The backlash of the gear was minimized to increase the output power. To increase the power of gear mechanism, the binding frequency and the thickness of the coil were changed. To control the rotating cycles of the main shaft according to its set numbers, different resistance and chips were used to design the circuit to controls electrical signals with pulse. The body of the lubricator was analyzed by stress analysis with different constructed angle. The stress analysis for differing loading pressures applied to the exterior body of grease lubricator due to the setup angle, was found that the maximum stress was distributed over the outlet part where the grease lubricator suddenly narrowed contracts. Digital mock-up was analyzed and the rapid prototyping(RP) trial products were tested with PCB circuit and grease. The evaluation of the outlet capacity for RP trial products was conducted, because the friction caused by the outlet on the wall surface was an important factor in the operation of the equipment. Finally, the finishing process was applied to decrease the roughness of the surface to a comparable level and was able to test the performance examination for the product.