• Title/Summary/Keyword: Development project

Search Result 6,327, Processing Time 0.029 seconds

Characteristics Analysis on Budget Distribution of Master Plan for Comprehensive Development Projects of Rural Villages (농촌마을종합개발사업의 기본계획 사업비 특성분석)

  • Kim, Dae-Sik;Lee, Seung-Han
    • Journal of Korean Society of Rural Planning
    • /
    • v.17 no.1
    • /
    • pp.13-27
    • /
    • 2011
  • This study analyzed the budget investment plans for the unit-project items(UPI) of 176 project districts for the rural village comprehensive development projects (RVCDP). This study classified the master plan reports of 176 project districts into 88 unit project items in aspect of project management, in order to analyze characteristics of distribution of budget in each project item. Most of all unit project items have similar types of uniform distribution with plus skewness in frequency pattern analysis except the total budget of the project district. This study analyzed the characteristics of budget distribution per province, year, and geographical types of region. Furthermore this paper also analyzed ratio of budget in unit project items to find out distribution pattern of each budget between project items over time. The hierarchical system for UPI of RVCDP consisted of three steps, which are 4 items of the first step on Strength of Rural-urban Exchange & Regional Capability (RURC), Green-income Infrastructure & Facility (GIF), Culture- health-welfare Facility, and Eco-environment & Landscape facility (ELF), 13 items for the second one, and 52 items for the third project items. From the results of the budget investment analysis for 5 years from 2004 to 2008, the budget investment ratios of RURC and ELF have steady state for every year, while GIF in decreasing and ELF in increasing over time. The ratios of UPI on infrastructure were decreased, whereas those on culture, health, and welfare were increased. Portion of tow project items among 52 items, which are community centers for village residents and rural experimental study facility, has 30% of total budget investment. Futhermore, the budget ratios of seven project items showed 50% of total budget. Average value of project budgets for five years was optimized as a type of exponential function in the case of decent array for ranking order.

A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project (형상관리기법을 활용한 대형 프로젝트 정보화 전략개발)

  • Won, Seo Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

A Study on the Project Evaluation Indicators for the Efficient Integrated Rural Development in Block Grants System (포괄보조금제도하에서 효율적인 농어촌지역개발을 위한 사업평가지표 연구)

  • Lee, Joo-Yong;Kim, Sun-Joo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.1
    • /
    • pp.57-62
    • /
    • 2011
  • Block Grants System to the agriculture sector has been started from 2010. This paper has been studied for the effective Integrated Rural Development under Block Grants System. For this, project evaluation items and indicators (PEI) were studied by internal and external example and specialist questionnaire on project evaluation. As the result of study, necessity of project, faith of project, efficiency of project, utilization of resources and operating capability were established in planning step, and most important PEI was established the necessity of project. And in enforcement step, performance result, monitering, capability, achievement and maintenance were established, and most important PEI was established performance results. Finally, monitering, capability, achievement and maintenance were established in completion step.

A Study on Maintenance Actual Condition and Revitalization of Rural Development Project (일반농산어촌개발사업 완료지구 시설물 실태분석 및 활성화 방안 연구)

  • Choi, Young-Wan;Kim, Keun-Ho;Eun, Hee-Chang;Lee, Young-Kyu;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.1-8
    • /
    • 2016
  • This study is intended to prepare an revitalization plan of region where rural development project is completed through an analysis of the actual condition of facility operation and maintenance in the region where the project is completed. The results of survey of actual condition of facility operation in the region where rural development project was completed showed that the facilities were not self-sufficient in terms of operation and maintenance cost. Therefore, a prerequisite to the revitalization of region where the project is completed is to prepare an alternative plan for increasing the efficiency and applicability of currently already prepared facilities. Second, a project operation organization system should be streamlined and the competency of operation personnel should continue to be strengthened. Third, it is necessary to prepare a support system and establish cooperation networks for increasing the extensibility of project and continuing to induce community revitalization in the region where the project is completed in the future.

Evaluation and improvement of forest watershed management projects in Korea

  • Rhee, Hakjun
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.4
    • /
    • pp.885-901
    • /
    • 2020
  • A forest watershed management project was introduced in 2004 to develop ecologically sound forest watersheds. It includes landslide prevention and erosion control, water resource management, landscape development, and forest resource management. However, it has been managed fragmentarily and inefficiently, far from the original intents. This study investigated current status, problems, and improvement measures of the project. Literature reviews were conducted on forest watershed management in Korea and other countries, and surveys were conducted on 201 erosion control experts. When introduced, the forest watershed management project was well planned and implemented as intended. It later turned to focus only on disaster prevention such as erosion control dams and stream conservation measures. The survey results showed that a majority (89% and 86%) of surveyees wanted increases in the project period and budget. They also responded that conflicts with local residents (51%) and determining project locations (32%) were the most difficult tasks when implementing the projects, and only 36% kept project records. To plan and implement the projects as intended, the following suggestions should be considered: (1) establishment of a solid legal foundation and improvement of the erosion control practices law; (2) increase in the project period (from 1 to 2 - 3 years) and budget; (3) development of a manual for project site selection and guidelines; (4) monitoring and systematic information management; and (5) development of spatial analysis tools for watershed analysis and management.

Performances of Farm Management Consulting Project (농가경영컨설팅 추진현황과 성과)

  • Kang, Kyeong-Ha;Jung, Ho-Gun;Park, Heung-Gyu;Lee, Min-Soo
    • Journal of Agricultural Extension & Community Development
    • /
    • v.8 no.2
    • /
    • pp.245-261
    • /
    • 2001
  • The consulting industry had enjoyed growth rates over the past 20 years which show no signs of slowing in their momentum. Since 1995, it began to discuss institutionalization of consulting in the agricultural sector in Korea. Rural Development Adminstration has launched farm management consulting project by means of benchmarking for farming innovation in 1988, which consists of establishing consulting team, developing standard diagnosis form of sixty crops and materials, training consultants, having various public relations, and making information systems. Until October, 2001, sixty seven thousands of farmers have benefited on this project. It is now appreciated as a alternative for new agricultural extension approach. Analyzing the changes of farm management practice level through consulting shows improvement, which data have been stored in web database. It is expected that farm management consulting project be main stream of agricultural extension in this country.

  • PDF

Study on the Status Change in Rural Landscape Planning and Landscape Project in the General Agriculture Fishing Village Development Project (일반농산어촌개발사업에 있어 농촌경관계획과 경관사업부문의 위상변화에 관한 연구)

  • Lee, Su Hyun;Cho, Tong Buhm
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.4
    • /
    • pp.119-128
    • /
    • 2019
  • Although the General Agricultural Fishing Village Development Project had a significant impact on the landscape formation and management in rural area, the rural landscape planning and project sectors was not stable by fluctuation variables. On the basic understanding the institutional status of rural landscape planning, some conclusions could be discussed as follows through the analysis of quantitative and qualitative changes and the background factors. The rural landscape plan lacked its own legal and institutional foundations, and the landscape project of the General Agricultural Fishing Village Development Project was mainly focused on the environment-improving H/W project for expanding the basic living infrastructures. In order to reflect the characteristics of the region and become independent rural landscape management, it is necessary to change the contents so that the S/W business such as the deepening landscape awareness and empowerment linked with improving the physical landscape. To this end, it is necessary to establish a foundation for the rural landscape planning system to have its own status, and it seems to seek to supplement with what is included S/W contents reflecting the context of higher level landscape planning. The landscape sector of the General Agricultural Fishing Village Development Project proved to be in the process of shrinking in both quantity and quality, despite the temporary expansion in the past. In addition, considering the distortion of the contents of landscape projects in rural sites, it seems that the rural landscape-related public project are now in a position to seek a new phase change beyond quantitative expansion. In particular, along with institutional improvements to secure the independent status of rural landscape planning that contributes to village community regeneration and social sustainability through the role of intermediary support organizations in landscape management activities. Through the integrated landscape plan, which is established in advance and led by the residents in the early stages, there is a need to change the direction to enhance meaning of the landscape planning goes beyond the facility design or space improvement.

An Extended Benefit-Cost Analysis of Land Consolidation and On-farm Development Project -With Respect to Jigok Land Consolidation and On-farm Development Project in Seosan, Chungnam Province, Korea- (경지정리사업의 확장편익-비용분석 - 충남서산시 지곡지구를 중심으로 -)

  • Lim, Jae-Hwan;Lee, Min-Soo
    • Korean Journal of Agricultural Science
    • /
    • v.29 no.1
    • /
    • pp.66-83
    • /
    • 2002
  • The economic feasibility analysis including benefit-cost ratio and internal rate of return of a land consolidation and on-farm development project was mainly depended upon the direct benefits and costs arising during project life. Therefore the projects were neglected in allocating the government's financial funds and loans on account of the low economic rate of return of the project. Accordingly the extended benefit-cost analysis method should be introduced and adapted to cover not only the benefit s such as non-market values of environmental and food security fun ct ions of the project but also market values of the project outputs. The main purposes of this study are (1) to prepare a guide line for economic feasibility analysis based on the IBRD and ADB guidelines, (2) to estimate the benefits from productivity increase, labor saving, savings of O&M cost of farm mechanization and project facilities, savings of farmer's burden for their public health, increasing environmental and public functional value of paddy fields, improving food security condition and formation of peaceful and uncontroversial rural society by implementing the land consolidation and on-farm development, (3) to introduce the newly adapted analytical method as the extended benefit cost analysis which could make possible to be included the values of non-market goods such as the food security and the environmental public function of paddy fields. To carry out this study, the existing publications on the guidelines for economic agricultural projects were reviewed and consultation was made with a For the post evaluation study of the land consolidation and on-farm development project, field survey in Jigok and other comparative area were made to get available information. According to the project completion report, Jigok land consolidation and on-farm development project has 55ha of benefit area out of 69ha of gross area. The project was started in November 11th, 2000 and completed october 30th, 2001. The total project costs were amounted to 2,548 million won and the annual project benefits were estimated at 335million won evaluated by domestic market prices. The ERR(Economic Rate of Return) and SRR(Social Rate of Return) of the project based on the shadow pricing system were estimated at 4.4% and 16% respectively. On the other hand, the ERR and SRR based on the domestic market value system were amounted to 6.37% and 14.62%. In conclusion, Korean land consolidation and on-farm development projects have not carried out from the view point of economic rate of return under shadow pricing system but from the view point of domestic pricing system. For the future feasibility studies on land consolidation projects have to be carried out including the non-market values as environmental and food security function of the projects.

  • PDF

Estimation of the Expected Socio-economic Benefits of the Largescale Comprehensive Agricultural Development Project and Jointcost Allocation -In the Case of Kumgang Project Area- (대단위 농업종합개발사업의 사회경제적 기대편익 추정과 결합비용의 배분 -금강지구를 중심으로-)

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.159-176
    • /
    • 1996
  • This study is aimed at reviewing the methods of joint cost allocation and allocating the joint cost of estuary dam with specially repect to Kumgang Large-scale Agricultural Comprehensive Development Project. Apart from the water resource development project propelled by Water Resource Development Corporation in connection with Law of Multipurpose Dam Development, the Largescale Comprehensive Agricultural Development Projects couldn't ins-titutionally be carried out cost allocation of common facilities, even though it were concerned with irrigation, municipal and industrical water supply, flood control, sightseeing and industrial zone development components. To decrease farmer's burden of the project costs and, operation and maintenance costs, the joint costs of common facilities like estuary dam included in agricultural development projects have to be allocated by suitable method as alternative cost-remaining benefit method and the analytical activity should be supported by revising the concerned laws as Rural Development and Promotion and, Rural Rearrangement conpatible with the law for multipurpose dam development. Kumgang Agricultural Comprehensive Development Project was selected as a case study for the estimation of socio-economic benefits by project components and joint cost allocation of the estuary dam. The main results of the study are as follows; Joint cost allocation and unit charges by components 1. The project area will be 25,554ha with total project cost of 624,860 million won including the estuary dam cost of 120,843 million won. The project costs were ex-pressed by 1994 constant price. 2. Total quantity of water was estimated 365 million tons which were consisted of 245 million tons for irrigation, 73 million tons for municipal water and 47 million tons for industrial water. 3. The rates of joint cost allocation were amounted to 34.2% for agriculture, 2.5% for sightseeing, 45.7% for transportation, 11.8% for M & I water supply and 5.8% for flood control respectively. 4. The unit financial charges by project components were estimated at 7.88 won per ton for irrigation, 16.11won for M & I water, 1,686won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The financial charges using straitline method for depreciation were estimated at 7.88won per ton for irrigation, 9.12won per ton for M & I water, 624won per vehicle one pass for transportation and 331won per Pyeong for sightseeing area. 5. The unit economic charges by project components were estimated at 21.1 won per ton for irrigation, 15.2won for M & I water, 977won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The economic charges using straitline method for depreciation were estimated at 11.72won per ton for irrigation, 8.61won per ton for M & I water, 331won per vehicle one pass for transportation. Policy recommendation 1. The unit operation and maintenance costs for irrigation water in the paddy field couldn't be imposed as the water resource cost untreated. 2. The dam costs including investment cost and O & M cost, as a joint cost, had to be allocated by each benefited components as transportation, M & I water supply, flood control, irrigation and drainage, and sightseeing. But the agricultural comprehensive project have been dealt as an irrigation project without any appraisal socio-economic benefits and any allocating the joint cost of estuary dam. 3. All the associated project benefits and costs must be evaluated based on accounting principle and rent recovery rate of the project costs and O & M costs should be regulated by the laws concerned. 4. The rural development and promotion law and rural rearrangement law have to be revised comprising joint cost allocation considering free rider problems. 5. The government subsidy for the agricultural base development project has to be covered all the project costs. In case of common facilities representing joint cost allocation problems, all the allocated casts for other purposes like transportation and M & I water supply etc. should be recovered for formation in investment fund for agricultural base development and to procure O & M costs for irrigation facilities.

  • PDF

Design and Implementation of Project Learning Site by Using XML (XML을 이용한 프로젝트 학습사이트의 설계 및 구현)

  • Choe, Hyeon-Geun;Ha, Tae-Hyeon
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.613-628
    • /
    • 2005
  • The purpose of this study was to design and implementation of project learning site by using XML. The development of the Internet site for project learning was planned as per preparation, development and test/application stages. At the stage of preparation, literature and cases were reviewed to find the elements of design principles needed for development of a project learning program and those required in the actual development. At the stage of development, the elements of the design principles and those for the actual development, both explored from the stage of preparation were used to develop a draft Internet site for project learning. The elements used for the development of the Internet site for project learning were motivation, specification of learning goals, reminiscence of preceding knowledge, positive participation in teaching activities, learning-guide feedback, evaluation, reinforcement and correction. It is changing web based format. XML advent because of HTML limitations of web based internet and expand it's field. XML is able to gather data on HTML of text based format, thus it is possible to control it's inside. It is expected that many teachers apply this model to their classes and show realistic results.

  • PDF