• 제목/요약/키워드: Development Type Project

Search Result 512, Processing Time 0.033 seconds

Waterfront Development Project Pattern Analysis of the Coastal Zone Management of the Osaka Bay

  • Yang, Jae-Joon;Yhang, Wii-Joo
    • Journal of Navigation and Port Research
    • /
    • v.27 no.3
    • /
    • pp.329-333
    • /
    • 2003
  • Study of the background and state of Osaka's waterfront space development and analysis of the functions of 22 chosen major facilities of development project reveals the following four types: amenity-oriented development, large-scale synthesis type development, renewal compound area type development, exchange communication promotion type development. Osaka bay area has served primely as the base of harbors, industry and energy, while analysis of the ongoing project has found that the city has been making a functional transition to a type of development to live up to the needs of the times, suggesting that is wise that Korea's future direction of waterfront development be oriented toward environmental-friendly development by taking advantage of low-density area's natural resources. Given the plurality and complexity of the law of coastal zone, what is needed is a legal maintenance for coastal zone's clear-cut coordinating function and for environmental-friendly development with the limitations of seaside and coastal functions in mind.

A Study on the Analysis of the Importance of Natural Landscape by the Development Project (개발사업에 의한 자연경관 영향 저감방안 중요도 분석에 관한 연구)

  • Shin, Min-Ji;Shin, Ji-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.2
    • /
    • pp.99-117
    • /
    • 2019
  • Environmental impact assessment (EIA), which predicts, evaluates, and manages the influences on natural landscape, plays a role of monitoring natural resources for systematic management of natural landscape. However, the function of verification and correction of the system is still insufficient and feed-back, one of the most important features of EIA follow-up, has not been introduced in Korea's EIA system yet. As a procedure, it is required to check if the opinions of the evaluators are properly reflected to the outcomes of the project through a reviewing process after assessing environmental impacts of a development project. In reality, despite the awareness about the importance of follow-up inspection of the conformity with, the system mainly focuses on the agreement during the planning stage of the development project and fails to continuously manage after its completion. There have been various preceding studies related to prediction, evaluation, and management of environmental impacts on natural landscape for better management. They primarily dealt with the problems in the EIA process and suggested improvement measures, including directions for institutional development, step-by-step goals, and operation methods, to address the problems which arise in the EIA follow-up process. However, suggested measures are not actively applied with the focus only put on institutional operation, there are virtually no standardized methods to predict and assess landscape changes due to the development project and to manage landscape after the project. Against this backdrop, this study aims to explore the existing methods to analyze the impacts natural landscape and to establish a system where landscape management is continued after the development project. To this end, we will suggest reducing methods according to the predicted changes in landscape for post-project management of natural landscape. Characteristics of reduction methods by project type were examined through reviewing the guide to natural landscape rating and the importance of development project impacts on natural landscape by type of reduction was evaluated through questionnaire for experts. Evaluated types of reduction are classified and presented by characteristics of each development project and content of reduction type.

A Study of Development Schedule Estimation Based on Development Type (소프트웨어 개발형태 기반 개발기간 추정 연구)

  • Park Seok-Gyu;Kim Woon-Yong
    • Journal of the Korea Computer Industry Society
    • /
    • v.7 no.3
    • /
    • pp.191-198
    • /
    • 2006
  • Area of software measurement is active more than thirty years. There is a huge collection of researches but still no concrete software development effort, duration and cost estimation model. The data sets used to conduct previous studies in the duration estimation model are often small and not too recent, these types of models should not be apply in recent projects that have complex architecture and various development environment. Therefore, Oligny et al. presents empirical models that predict software project duration in accordance with project platform based on project effort using the log data transformation. These models are based on the analysis of 396 project data provided by release 4 of the ISBSG Benchmark. Applying Oligny et al.'s models to 534 project data provided release 6 of the ISBSG Benchmark, the project duration is affected by development type more than development platform. Therefore, This paper presents the model of duration estimation according to development type. This paper proves the duration is more affected by development type than development platform. And, The model according to development type is more adequate for duration estimation.

  • PDF

A Research on the core PMO function and operation type for the IT project of financial industry in Korea (금융권 핵심 PMO 기능과 운영형태에 관한 연구)

  • Lee, Jae-Beom;Lee, Jae-Chul;Chang, Yun-Hi
    • Journal of Digital Convergence
    • /
    • v.7 no.3
    • /
    • pp.35-47
    • /
    • 2009
  • The IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques, TQM to decrease project failure, and to increase IS performance. But, in spite of such various efforts, the latest Standish Group's research indicates that the project scale is bulkier than $1{\sim}2$ year ago and IS development project's batting average falls from 34% to 28% at the same time, proceeded project is increased, and project discharged arrives to $15%{\sim}18%$. According to a research, success possibility increased by 37% after a year of PMO introduction, and increased sharply by 62% after 2 years and by 65% after S years. This research has a goal to survey how the PMO function and operation type affect the IS project performance in the financial industry. I determine nine independent variables and three dependent variables from previous researches. The results of this study are that the four core functions of PMO have relationship with project performance. But, technical support function does not relate with organization performance. Among the four core PMO operation types, three types have an effect on the IS project performance except the perfectionist type.

  • PDF

The Strategy for Improvement of System md Model Development for Upland Area Integrated Improvement Project (밭지역 종합정비를 위반 모델 개발 및 제도개선방안)

  • Kim Young Hwa;Han Kuk Heon;Park Ji Sung;Kim Chae Soo
    • KCID journal
    • /
    • v.11 no.1
    • /
    • pp.64-76
    • /
    • 2004
  • For effective development of upland areas, e development model of upland area integrated improvement project are suggested which on standard type and integrated infrastructure improvement type, rural Income raising type and eco-friendly consolidation type

  • PDF

Key Success Factors for Collaborative Technology Development Projects: The Case of Small & Medium Firms in the Korean Electronics Parts Industry (공동기술개발 프로젝트의 성패요인: 우리나라 전자부품 중소기업 분석)

  • 이광희;김영배
    • Journal of Technology Innovation
    • /
    • v.6 no.2
    • /
    • pp.122-158
    • /
    • 1998
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 82 projects in the Korean electronic parts industry. The patterns of R&D collaboration were categorized into 4 types by two criteria development motive(technology Push/market pull) and Project initiator (focal firm/partner). The bivariate relationships revealed that project characteristics (technological complexity, market uncertainty), management characteristics (participation in project formulation), problem solving characteristics(problem solving performance of the focal firm, users active role in problem solving, active role of university or research institute in problem solving) and success rates appear to be different among four types of collaboration. Each type of collaborative R&D projects also had different KSFs. The KSFs of type 1 (technology Push and focal firm initiation), for instance, include the strategic importance of the project, focal firms share of cost, active role of university or research institute in problem solving, while those of type 4(market pull and customer initiation) cover reliability of partner relationship, a time at partners involvement, information sharing. The findings suggest that the different contingencies brought different patterns and KSFs of collaborative R&D project, since different information, resources, and partners roles were needed to successfully implement the projects according to development motive and project initiator Finally, managerial, policy, and theoretical implications for the collaborative R&D activities in the Korean electronics parts industry were discussed, based on empirical results of this study.

  • PDF

An Influence Analysis of the Social Capital and Participation Intention by the Regional Capacity Building for Rural Regional Development (농촌지역개발 지역역량강화사업이 사회적 자본형성과 사업참여의도에 미치는 영향)

  • Hwang, Young Seob;Cho, Tong Buhm
    • Journal of Korean Society of Rural Planning
    • /
    • v.27 no.1
    • /
    • pp.43-56
    • /
    • 2021
  • Social capital is the basis for enabling regional development, and although it is the result of regional development that produces greater productivity through the combination of human and material capital, there is a lack of discussions in connection with rural development. This study saw that the local capacity building project affects the social capital of the local residents and such social network is realized through the rural area development project based on the participation of the residents. As a result of the analysis, the regional capacity building project has a positive influence on the social capital of the region and the willingness to participate in the project, and bridge-type social capital has shown a mediating effect on education and consulting fields. Only when local social capital, especially bridge-type social capital, is cultivated through the regional capacity building project can the project be transformed into one suitable for local conditions through active participation of residents.

Trend Analysis of Development Projects in Gyeonggi Province - Focusing on the Target Projects of Environmental Impact Assessment - (경기도 개발사업의 추이 분석 - 환경영향평가 대상사업을 중심으로 -)

  • Kim, Su-Ryeon;Sung, Hyun-Chan
    • Journal of Environmental Impact Assessment
    • /
    • v.25 no.1
    • /
    • pp.15-24
    • /
    • 2016
  • This study was analyzed the distribution tendencies and statuses of development projects for EIA projects. According to the result of this study, in the annual analysis, a number of consultations and areas have shown increasing trend across the board. In the project type analysis, there are development project types; urban development, industrial complex, sport facility installation, resort complex development, road construction, which have a lot of developments. In the cities analysis, a number of consultations were about 53% on the top 5 cities, the areas were focused on 75%, and the development projects were concentrated in the southern distribution of Gyeong-gi province. The development axis, from 2004 to 2006, was C-type, but it was extended to O-type until 2010. Therefore, the development will expand into nature conservation zones and forest areas to the east. The development restriction area will be disappeared gradually because the development density of the surrounding Seoul city is more advanced, and we could predict that may be accelerated conurbation between the neighboring cities. Thus, when the development project is located, it would be reviewed difference in existing development project type, project size, and concentration in each city on the basis of environmental capacity.

Development of Loss Model Based on Quantitative Risk Analysis of Infrastructure Construction Project: Focusing on Bridge Construction Project (인프라건설 프로젝트 리스크 분석에 따른 손실 정량화 모델 개발 연구: 교량프로젝트를 중심으로)

  • Oh, Gyu-Ho;Ahn, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.208-209
    • /
    • 2022
  • This study aims to analyze the risk factors caused by object damage and third-party damage loss in actual bridge construction based on past insurance premium payment data from major domestic insurers for bridge construction projects, and develop a quantitative loss prediction model. For the development of quantitative bridge construction loss model, the dependent variable was selected as the loss ratio, and the independent variable adopted 1) Technical factors: superstructure type, foundation type, construction method, and bridge length 2) Natural hazards: flood anf Typhoon, 3) Project information: total construction duration, total cost and ranking. Among the selected independent variables, superstructure type, construction method, and project period were shown to affect the ratio of bridge construction losses, while superstructure, foundation, flood and ranking were shown to affect the ratio of the third-party losses.

  • PDF

A Study on Environment-friendly Location & Review Criteria by Development Project Types (개발사업 유형별 환경친화적 입지 및 검토기준 연구)

  • Sung, Hyun-Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.12 no.4
    • /
    • pp.34-46
    • /
    • 2009
  • and to provide (case example-focused) guidelines for environment-friendly oriented plans. Key findings of this study are as follows : first, a total of 2,465 development projects covering $173km^2$ were undertaken in Gyeonggi province in last three years. Second, based on the analysis of 16 development projects in four types, about 20 alternative environment-friendly location were suggested. Thirdly, 56 environment-friendly criteria were suggested for the environmental assessment items by setting at least three alternatives. Going forward, if discussion case examples by project type, environment-friendly location criteria by project type, and environment friendly review criteria by assessment item suggested in this study are fully utilized when initiating or approving various development projects in the future, environment-friendliness will be enhanced in development projects.