• Title/Summary/Keyword: Development Priority

Search Result 1,514, Processing Time 0.028 seconds

Development and Application of a Chemical Ranking and Scoring System for the Management of Endocrine Disrupting Chemicals (환경성 내분비계장애물질(EDCs)의 우선관리순위 결정법 개발 및 적용)

  • Lim, Miyoung;Park, Ji Young;Ji, Kyunghee;Lee, Kiyoung
    • Journal of Environmental Health Sciences
    • /
    • v.44 no.1
    • /
    • pp.76-89
    • /
    • 2018
  • Background: Exposure to endocrine disrupting chemicals (EDCs) has been considered one of the main causes of a range of endocrine diseases in modern society. An EDC priority list considering exposure, toxicity, and societal concern should be established for EDC management. Methods: The chemical ranking and scoring (CRS) system for EDCs was based on exposure, toxicity,and societal concern. The exposure score system was based on usage, circulation volume, bioaccumulation, and detection in consumer products. The toxicity score system was based on carcinogenicity and reproductive and developmental toxicity. The societal concern score system was based on domestic or international regulations and mass media reports. Results: A total of 165 EDCs were considered in the CRS system. The top-five priority EDCs were Bis(2-ethylhexyl) phthalate (DEHP), Benzene, Bisphenol A, Dibutyl phthalate (DBP) and Trichloroethylene. Phthalates, bisphenols and parabens were identified as priority chemical groups. Conclusion: We developed a CRS system for EDCs to identify priority EDCs for management. This will be a foundation to provide an EDC management plan based on scientific decision-making.

Development of U-Service Priority Model Based on Customer and Provider's View (수요·공급자를 통합한 u-서비스 우선순위 평가모형 개발)

  • Jang, Jae-Ho;Um, Jung-Sup
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.2
    • /
    • pp.132-147
    • /
    • 2008
  • So far ubiquitous service (u-service) priority has seldom been empirically examined based on the customer's view. It is usual to prioritize the relative importance of u-service variables by the supplier's intuition and a few specialist's experienced knowledge. Such approaches have the disadvantage that they provide only limited empirical information on the field practices in relation to u-service since customer demand of u-service is poorly defined despite abundant interest in this problem. Therefore, the aim of this research was to develop u-service priority model in the context of multi-criteria framework integrating customer and supplier's view, using high technology acceptance theory as major controlling factors. An important question was how to measure or represent criteria that is important to u-service and should be included in a priority model. The selection criteria for the model variables were derived from high technology acceptance theory and AHP approach through the analysis of frequency count, elimination of overlapping factors and brainstorming with specialists. Daegu showed top-rankings in transportation-aid service, guidance service for the eyesight disabled and u-telematics service. In contrast, disaster prevention service and industrial specialized town service ranked highly in the typical supplier's approach were not a dominant determining factor in the u-service priority. The model identified the fact that typical high priority service in terms of supplier's view did not necessarily accompany the important predictor for the u-service priority.

  • PDF

Priority assessment and estimation of annual power generation for potential development site of hydroelectric dam in North Korea (북한지역 수력발전댐 개발가능지점에 대한 연간가능발생전력량 분석 및 개발 우선순위 평가)

  • Kwon, Minsung;Kim, Tae-Woong;Ahn, Jaehyun
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.10
    • /
    • pp.929-939
    • /
    • 2018
  • In North Korea, hydropower which occupies about 63% of power generation is a major electric power source, and North Korea has many advantages in the geographical for developing hydroelectric power. In this study, Information on the basin and dam capacity for 33 potential development site of hydroelectric dam was analyzed using DEM, and potential annual power generation was estimated by applying results of long-term runoff simulation with MWSWAT model for recent 30-year. The potential annual power generation at 33 dam was estimated to be about 28% of the current hydroelectric power in North Korea. In addition, a priority of dam development in each province was assessed by estimating the scale of an industry and prospecting the population change in the future. And a priority for dam development within the province was estimated based on the dam capacity and the potential annual power generation. The priority of each province was ranked in order of Pyeongannamdo, Hamgyungnamdo, Hamgyungbukdo, Hwanghaebukdo, Pyeonganbukdo, Jagangdo, Ryanggangdo, Hwanghaenamdo, and Gangwondo. The results of this study can be used as an initial review data for advancing to hydropower development project in North Korea.

Multiple Target Management of Air-to-Air mode on Airborne AESA Radar (항공기 탑재 AESA 레이다의 공대공 모드 다표적 관리 기법)

  • Yong-min Kim;Ji-eun Roh
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.5
    • /
    • pp.580-586
    • /
    • 2023
  • AESA radar is able to instantaneously and adaptively position and control the beam, and this enables to greatly improve multi-target tracking capability with high accuracy in comparison to traditional mechanically-scanned radar system. This paper is primarily concerned with the development of an efficient methodology for multi-target managenent with the context of multi-target environment employing AESA radar. In this paper, targets are stratified into two principal categories: currently displayed targets and non-display targets, predicated upon their relative priority. Displayed targets are subsequently stratified into TOI (target of interest), HPT (high priority target), and SAT (situational awareness target), based on the requisite levels of tracking accuracy. It also suggests rules for determining target priority management, especially in air-to-air mode including interleaved mode. This proposed approach was tested and validated in a SIL (system integration lab) environment, applying it to AESA radars mounted on aircraft.

Priority-based Multi-DNN scheduling framework for autonomous vehicles (자율주행차용 우선순위 기반 다중 DNN 모델 스케줄링 프레임워크)

  • Cho, Ho-Jin;Hong, Sun-Pyo;Kim, Myung-Sun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.25 no.3
    • /
    • pp.368-376
    • /
    • 2021
  • With the recent development of deep learning technology, autonomous things technology is attracting attention, and DNNs are widely used in embedded systems such as drones and autonomous vehicles. Embedded systems that can perform large-scale operations and process multiple DNNs for high recognition accuracy without relying on the cloud are being released. DNNs with various levels of priority exist within these systems. DNNs related to the safety-critical applications of autonomous vehicles have the highest priority, and they must be handled first. In this paper, we propose a priority-based scheduling framework for DNNs when multiple DNNs are executed simultaneously. Even if a low-priority DNN is being executed first, a high-priority DNN can preempt it, guaranteeing the fast response characteristics of safety-critical applications of autonomous vehicles. As a result of checking through extensive experiments, the performance improved by up to 76.6% in the actual commercial board.

Analysis and Strategy of Economic Development Policy for SMEs in Indonesia

  • DAHLIAH, Dahliah;KURNIAWAN, Agus;PUTRA, Aditya Halim Perdana Kusuma
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.5
    • /
    • pp.103-110
    • /
    • 2020
  • This study analyzes the strategy of determining economic development planning on SME improvement in Indonesia. A qualitative approach was conducted through interview questionnaires with twenty respondents, including sixteen Regional Apparatus Work Unit, Fisheries and Marine Office lecturers, subdistrict heads, and development observers. The method used is Analytical Hierarchy Process (AHP). AHP prioritizes criteria and sub-criteria to increase economic growth, reduce poverty, and increase community participation, while indicating the sub-criteria to optimize resource potential, strengthen micro-economy, develop tourism potential, utilize fishery potential and cultivation, and improve institutional performance. The AHP weighting results based on competitiveness and regional development of Bantaeng Regency is the priority in policy-making for a solution. The research shows that the government strategy, based on the perception of the stakeholders, is: optimizing resources strategy with priority to maximize the resource-carrying capacity that includes agriculture and farm, tourism development potential strategy, self-reliance of community groups and coaching and management. Strategies to strengthen micro economy include: industrial control, SMEs, community cooperatives and infrastructure improvements, strategies to improve institutional performance work capacity and work ethic, and strategies to utilize fisheries and cultivation potential technological development, provision of processed industries of fishery products, and improvement of the quality of the environment.

Establishing the Development Priority of Undeveloped Urban Parks Using GIS (GIS를 이용한 미시설공원의 개발 우선순위 설정 연구)

  • 김윤종;이인성;이석민
    • Spatial Information Research
    • /
    • v.6 no.1
    • /
    • pp.35-45
    • /
    • 1998
  • In order to support effective decision-makings related to greenery planning, this study construct a fundamental database about greenery information for Seoul metropolitan area using GIS and Remote Sensing. Greenery evaluation index consists of ecological/ environmental, utilization, social condition value which are used to determine the development priority of undevelopment parks. These indexes will also be utilized for the green area conservation classification for Seoul metropolitan area. This study is a part of previous project called "Management Policy of the Total Amout of Greenery", which was conducted in Seoul Development Institute.Institute.

  • PDF

Risk Priority and Allocation of Private Investment in Port Development

  • Seong, Yu-Chang;Youn, Myung-Ou;Keum, Jong-Soo;Kinzo, Inoue
    • Journal of Navigation and Port Research
    • /
    • v.30 no.7
    • /
    • pp.599-605
    • /
    • 2006
  • The Port Development has been achieved by the Government because it needs large scale of funds. However, since 1994, the Govenment has been implemeting private investments for constructing and operating the ports and so on. Although the Government had high expectation that it could expedite the expansion of the port facilities, there were many problems in view of construction, management, financial and social environment. This study figure out that most of the important reasons are the uncertainty of risk allocation between private investors and the Government, using with Analytic Hierarchy Process. It is expected that the results of this study will encourage more private investors to participate in port private investments in the future.

An Estimation on Development Capacity under Urban Growth Management Policies: A Case of Maryland in the U.S. (도시성장관리정책 하에서의 개발용량 추정과 정책적 함의: 미국 매릴랜드 주를 사례로)

  • Sohn, Jung-Yul;Knaap, Gerrit
    • Journal of the Korean Geographical Society
    • /
    • v.43 no.1
    • /
    • pp.52-70
    • /
    • 2008
  • Using MD Property View database on 15 counties in Maryland in the U.S., this study attempts to explore the estimation process on the housing development capacity under the Maryland's urban growth management policy known as the Smart Growth Initiatives. This study also seeks to draw the implications of the estimated development capacity by individual counties on successful implementation of the urban growth management policy. The finding shows that this region has land for residential use enough to accommodate growth for the next 30 years. However, contrary to the goal of the Smart Growth Initiatives, a majority of development capacity is located not only outside the Priority Funding Area designated by the Smart Growth Initiatives but also at counties that are located far away from the major metropolitan area. In addressing this problem, the state does not need to either abolish or immediately expand the Priority Funding Area. Rather, the state requires local governments to include housing elements in their comprehensive planning, to provide periodic estimates on housing and employment capacity, and to establish and manage database on the location and the capacity of developable land.