• 제목/요약/키워드: Development Life Cycle

검색결과 1,520건 처리시간 0.032초

스마트 무인기 시스템 요건 도출 (Generation of System Requirements for Smart UAV)

  • 이정진
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.17-22
    • /
    • 2004
  • This paper present the brief generation process of system requirements or mart UAV from a development obejective. The current Snart UAV requirements deal with the restricted life cycle from development to test and verification exclusive of full life cycle beacuse of the new technology demonstration research program funded by goverments. The Smart UAV system consists of flight vechicle, avionics, communication link, payload, ground control stationand ground supporting system. In thus paper, top-down flown requirememts are intoduced how to allocate to each sub-system.

  • PDF

SE기반의 전순기 항공기 중량.평형관리 Program 개발 (SE Model-Based Program Development for Aircraft Full Life-Cycle Weight & Balance Control)

  • 김정훈;박차환;정영화;김문규;강민성
    • 시스템엔지니어링학술지
    • /
    • 제3권2호
    • /
    • pp.25-32
    • /
    • 2007
  • There has been no systematic accumulation in the aircraft weight data even though those are crucial in the full life-cycle weight and balance program of aircraft. Companies, government agencies, and the Korea Air Force have been controling the data separately. The lack of communication between these institutes prevented the mutual use of the data. This study deals with a SE model-based weight and balance program development process for the full life-cycle weight and balance control of aircraft which enabled the efficient and mutual use of the weight data from the various institutes.

  • PDF

공동주택의 신축공사와 리모델링 공사에 공종별 에너지 소비량 및 환경영향 비교 연구 (A Comparison of Embodied Energy and Environmental Impact on the New Building and Remodelling of Construction Types in Apartment Housing)

  • 이강희
    • 한국주거학회논문집
    • /
    • 제14권5호
    • /
    • pp.65-74
    • /
    • 2003
  • Recently, the environmental conservation has been emphasized over the world. Building industry should carefully reflected the development focused on the economic aspect as well as the environmental considerations. Therefore, it requires the technology development to mitigate the environmental pollution through the reducement of the energy and resources usage amount over the building life cycle. For these, it should be required to set up the analysis methodology to grasp the amount of the environmental pollution and energy and resources in each step of building life cycle. In this paper, it aimed at preparing the analysis process and analyzing the embodied energy and $CO_2$ and $SO_x$ emission according to the building work, field work, mechanical and electrical work on the new building and remodelling, utilizing the inventory analysis which is one of the LCA process.

한국형발사체개발사업 정보 관리를 위한 PLM 시스템 구축 (PLM System Development for Data Management of KSLV-II Program)

  • 권병찬;박창수;김근택
    • 항공우주시스템공학회지
    • /
    • 제8권2호
    • /
    • pp.49-54
    • /
    • 2014
  • The main purpose of Korea Space Launch Vehicle II(KSLV-II) Program is to develop a domestic launch vehicle that can deliver a 1.5ton class application satellite into a Low Earth Orbit(600~800km). The data management is an essential factor in systems engineering for success of large-scale complex systems development, and it systematically manages the information and technical data for the total life-cycle of a system. In this paper, data management policies and processes on KSLV-II program are presented, and product life-cycle management system for KSLV-II program is also presented.

최소기대비용에 기초한 교량의 최적내진신뢰성 (Optimal Seismic Reliability of Bridges Based on Minimum Expected Life Cycle Costs)

  • 조효남;임종권;심성택
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.249-256
    • /
    • 1999
  • This study is intended to propose a systematic procedure for the development of the reliability-based seismic safety and cost-effective Performance criteria for design and upgrading of long span PC bridges. In the paper, a set of cost function models for life cycle cost analysis of bridges is proposed. The total life cycle cost functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses. The damage costs are successfully expressed in terms of Park-Ang median global damage indices and damage probabilities. The proposed approach is successfully applied to model bridges in both regions of a moderate seismicity area like Seoul, Korea and a high one like Tokyo, Japan. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as long span PC bridges.

  • PDF

자동차 배출가스 규제를 위한 전생애평가 시스템 구축 (The Development of the Life Cycle Assessment Systems for the Constraint of the Motor Vehicle Emission)

  • 조재립;김경훈;김우식
    • 산업경영시스템학회지
    • /
    • 제20권43호
    • /
    • pp.365-379
    • /
    • 1997
  • Currently the problem of air pollution caused by the motor vehicle emission is of the most serious problems to be solved. Life Cycle Assessment is a process to evaluate the environmental burdens associated with a product or process by identifying and quantifying energy and materials used and wasters to the environment. This paper establishes a Life Cycle Assessment Systems which satisfies the criteria motor vehicle emission for the automobile producers who are currently producing the automobiles with catalytic convert. This plan also considered the constraint of the effective motor vehicle emission by way of the exhaust gas recirculation, electronic fuel injection, closed loop carburetor. In order to develope the performance of the LCA systems, the recent emissions test data have also been applied. The result of the development LCA systems has proved that the LCA plans presented in this paper satisfies the criteria motor vehicle emission and will be contributed to constrain the motor vehicle emission most effectively.

  • PDF

교량의 생애주기비용 분석을 위한 비용함수 모델 및 시스템 개발 (Development of System and Cost Function Model for Life Cycle Cost Analysis of Bridge)

  • 박미연;선종완;엄인수;조효남
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.704-711
    • /
    • 2005
  • Recently Life Cycle Cost Analysis for civil infrastructures such as pavements, bridges, and dams has been emphasized However, so far, there are few systems available for life cycle cost analysis of bridges at design stage. Therefore, the objective of this paper is to develop a user-friendly life-cycle cost analysis system for LCC-effective optimal design decision making at design stage. The program is based on the proposed LCC model, formulation, analysis modules and systematic procedure that suit Korean construction conditions. It is expected that the developed system can be effectively utilized for more LCC-effective design of bridges. It is applied to an actual bridge design project in order to demonstrate its effectiveness and applicability.

  • PDF

Analysis of Production Process Improvement with Life Cycle Assessment $Technology{\sim}$ Example of HDPE Pipe Manufacturing

  • Tien, Shiaw-Wen;Chiu, Chung-Ching;Chung, Yi-Chan;Tsai, Chih-Hung;Chang, Chin-Fa
    • International Journal of Quality Innovation
    • /
    • 제8권2호
    • /
    • pp.32-56
    • /
    • 2007
  • Life Cycle Assessment (LCA) aims to analyze possible impact upon manufacturing process and availability of products, and also study the environmental considerations and potential influence during entire life cycle ranging from procurement, production and utilization to treatment (namely, from cradle to tomb). Based on high-density polyethylene (HDPE) pipe manufacturing of company A, this case study would involve evaluation of environmental influence during the production process. When the manufacturing process has been improved during "production process" and "forming cooling" stage, it is found that capital input on "electric power" and "water supply" could be reduced, thus helping to sharpen the competitive power of company A, and also ensure sustainable economic and industrial development in accordance with national policies on environmental protection.

안전성활동의 추적성을 위한 초기 위험원 도출 기법에 대한 연구 (A Study on Identification of Hazards for Their Tracking and Management)

  • 한찬희;이영수;안진;조우식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1008-1015
    • /
    • 2007
  • The primary purpose of the safety management is to prevent the loss of lives or physical damages arising from potential hazards in the railroad signaling system. Since such potential hazards may occur at any time during the system life cycle from design and development to maintenance, safety management activities have to be continuously taken in the course of the system life cycle. The identification of potential hazards is the early step of the safety management. However, such identification activities have to be continued during the system life cycle. Further, they have to be closely linked with system functions to prevent functional problems. This study provides a systematic approach to identification of potential hazards for their tracking and management during the system life cycle to assure the identification and definition of the most appropriate hazards.

  • PDF

철도차량 전과정 단계별 온실가스 발생량 비교를 통한 저탄소 운영방안 연구 (Low Carbon operation study through comparing GHG contribution of each stages of railway vehicle)

  • 이철규;김용기
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.183-186
    • /
    • 2010
  • Advanced Railway countries are developing technologies of production and management for low-carbon and green growth of their railway industry to hold a dominant position under post-Tokyo protocol regime through integrated approach which uses environmental quantitative analysis of train life cycle by using LCA(Life Cycle Assessment). On the contrary, Korea railroad industry attempts to make an environmental improvement only for using regenerative energy and improvement in operating energy consumption through adapting reduction weight of material technology and etc. without systematic environmental analysis approaches such as comparing and analyzing energy consumption as well as GHG emission in each life cycle stages of train. Therefore, In this paper, low-carbon management and comprehensive environmental improvement for sustainable development of Korea railway industry through analyzing the result of life cycle analysis in abroad are suggested.

  • PDF