• Title/Summary/Keyword: Development Cost

Search Result 8,049, Processing Time 0.035 seconds

Development of Program for Estimation of Direct or Indirect Loss Cost Due to Industrial Disaster (산업재해로 인한 직.간접 손실비용 산출 프로그램 개발)

  • 최광만;서재민;임차순;류병태;고재욱
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.2
    • /
    • pp.63-68
    • /
    • 2001
  • In this study the main elements which can be commonly adopted to every kind of business are selected through the research, case-study, benchmarking common items of a direct or indirect loss cost. As a result of the development of a program for evaluating loss cost a case or accumulated data can be easily managed through estimating the direct and indirect loss cost as tell as the ratio between directs and indirect cost. The program is fit to case-study and we are compared direct cost with indirect cost. Automatically, this program showed ratio between directs and indirect cost for style, scale of accident The person in charge of safety and hygiene can have better chances to get into management also the owner or the CEO can recognize the importance of management of safety and hygiene. So this can guide the company to invest in a prevention of disaster and to adopt a safety and hygiene management promote the prevention activity of a company, and finally decrease the accident rate in the country.

  • PDF

Development of Novel Electrode Materials for Plasma Display Panel

  • Kim, Chul-Hong;Chae, So-Ra;Lee, Min-Hee;Jeong, Hyun-Mi;Kim, Beom-Kwon;Heo, Eun-Gi;Choe, Deok-Hyeon;Lee, Byung-Hak
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2008.10a
    • /
    • pp.1437-1440
    • /
    • 2008
  • In this paper, we mainly deal with metallic electrode materials and patterning processing of plasma display panels. We focus on the recent development status, where low cost and high performance electrode materials such as Ag-based single-layered bus, low cost-in-use and anti-migration address electrodes are briefly introduced. The technological trends and further works on novel electrode materials and processing are also discussed.

  • PDF

An Overview of Time Estimation in the Appraisal of Completeness for Software

  • Kim, Yukyong
    • Journal of Software Assessment and Valuation
    • /
    • v.16 no.1
    • /
    • pp.21-26
    • /
    • 2020
  • The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.

Comparative Evaluation on the Cost Analysis of Software Development Model Based on Weibull Lifetime Distribution (와이블 수명분포에 근거한 소프트웨어 개발모형의 비용 분석에 관한 비교 평가)

  • Bae, Hyo-Jeong
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.3
    • /
    • pp.193-200
    • /
    • 2022
  • In this study, the finite-failure NHPP software reliability model was applied to the software development model based on the Weibull lifetime distribution (Goel-Okumoto, Rayleigh, Type-2 Gumbe), which is widely used in the software reliability field, and then the cost attributes were compared and evaluated. For this study, failure time data detected during normal operation of the software system were collected and used, the most-likelihood estimation (MLE) method was applied to the parameter estimation of the proposed model, and the calculation of the nonlinear equation was solved using the binary method. As a result, first, in the software development model, when the cost of testing per unit time and the cost of removing a single defect increased, the cost increased but the release time did not change, and when the cost of repairing failures detected during normal system operation increased, the cost increased and the release time was also delayed. Second, as a result of comprehensive comparative analysis of the proposed models, it was found that the Type-2 Gumble model was the most efficient model because the development cost was lower and the release time point was relatively faster than the Rayleigh model and the Goel-Okumoto basic model. Third, through this study, the development cost properties of the Weibull distribution model were newly evaluated, and the analyzed data is expected to be utilized as design data that enables software developers to explore the attributes of development cost and release time.

A Study on the Mid-Long Term Direction for Development of Software Cost Estimation Guidelines (소프트웨어 사업대가기준 중장기 발전 방향에 관한 연구)

  • Kim, Woo-Je;Kwon, Moon-Ju
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.1
    • /
    • pp.139-155
    • /
    • 2010
  • The purpose of this paper is to develop a framework of software cost estimation guidelines and to derive a mid-long term direction for development of the software cost estimation guidelines. In this paper, all the steps in the software life cycle are researched in the view of cost estimation, and current software cost estimation guidelines and models have been reviewed and analysed first. Second, a plan to separate unit cost per function point from standard procedure in current software cost estimation guidelines is presented to strengthen maket self-regulating function as a mid-long term developmental direction for software cost estimation guidelines. Third, construction of cost repository, making standard procedure for software cost estimation guidelines, development of various kinds of software cost estimation models, and a system for experts on software cost estimation are presented as the prerequisites for the future model framework of software cost estimation guidelines. Finally a roadmap for establishing the future model is proposed.

A Study on the Estimation of Software Development Cost of IT Projects in Public Sector (공공부문 정보화사업의 소프트웨어 개발비용 예측에 관한 연구)

  • 박찬규;구자환;김성희;신수정;송병선
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.191-204
    • /
    • 2002
  • As the portion of information systems (IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for scientific and efficient management of IS budget. Since IS budget makes much effect on the delivery time, quality and productivity of IS projects, the exact cost estimation is also necessary for the successful accomplishment of IS projects. The primary concern in the cost estimation of IS projects is software cost estimation, which requires the measurement of the size of softwares. There are two methods for sizing software : line-of-code approach, function point model. In this paper, we propose a function-point-based model for estimating software cost. The proposed model is derived by collecting about fifty domestic IT projects in public sector and analyzing their relationship between cost drivers and development effort. Since the proposed model is developed by simplifying the function point model that can be used only when detailed user requirements are specified, it can be also applied at project planning and budgeting phase.

Mooring Cost Sensitivity Study Based on Cost-Optimum Mooring Design

  • Ryu, Sam Sangsoo;Heyl, Caspar;Duggal, Arun
    • Journal of Ocean Engineering and Technology
    • /
    • v.23 no.1
    • /
    • pp.1-6
    • /
    • 2009
  • The paper describes results of a sensitivity study on an optimum mooring cost as a function of safety factor and allowable maximum offset of the offshore floating structure by finding the anchor leg component size and the declination angle. A harmony search (HS) based mooring optimization program was developed to conduct the study. This mooring optimization model was integrated with a frequency-domain global motion analysis program to assess both cost and design constraints of the mooring system. To find a trend of anchor leg system cost for the proposed sensitivity study, optimum costs after a certain number of improvisation were found and compared. For a case study a turret-moored FPSO with 3 ${\times}$ 3 anchor leg system was considered. To better guide search for the optimum cost, three different penalty functions were applied. The results show that the presented HS-based cost-optimum offshore mooring design tool can be used to find optimum mooring design values such as declination angle and horizontal end point separation as well as a cost-optimum mooring system in case either the allowable maximum offset or factor of safety varies.

The Comparative Software Development Cost Model Considering the Change in the Shape Parameter of the Erlang Distribution (어랑분포의 형상모수 변화에 따른 소프트웨어 개발 비용모형에 관한 비교 연구)

  • Yang, Tae-Jin
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.9 no.6
    • /
    • pp.566-572
    • /
    • 2016
  • Software Reliability implemented in software development is one of the most important issues. In finite failure NHPP software reliability models for software failure analysis, the hazard function that means a failure rate may have constant independently for failure time, non-increasing or non-decreasing pattern. In this study, software development cost analysis considering the variable shape parameter of Erlang distribution as the failure life distribution in the software product testing process was studied. The software failure model was applied finite failure Non-Homogeneous Poisson Procedure and the parameters approximation using maximum likelihood estimation was accompanied. Thus, this paper was presented comparative analysis by applying a software failure time data to the software, considering the shape parameter of Erlang distribution for development cost model analysis. When compared to the cost curve in accordance with the shape parameter, the model of smaller shape can be seen that the optimal software release time delay and more cost. Through this study, it is thought that it can serve as a preliminary information which can basically help the software developers to search for development cost according to software shape parameters.

A Study on the Integration Check Framework Development of SaaS Adoption for the Cost Estimation (SaaS 도입 시 예산추정을 위한 통합점검프레임워크 개발에 관한 연구)

  • Yoon, Seong-Jeong;Kim, In-Hwan;Kim, Min-Yong
    • Journal of Information Technology Services
    • /
    • v.12 no.3
    • /
    • pp.345-377
    • /
    • 2013
  • Government agencies have many difficulties for the information system development and operation. One of the difficulties is a budget estimation. Each government agency suggests individually different estimation for the personnel expenses and IT infrastructure adoption costs in the same field of informatization promotions. The other one is the operation costs are increased exponentially in every year[42, 51]. Those difficulties make government agencies can not help adopting SaaS. In fact, most of IT consulting company and government agencies already recognized a variety of SaaS advantages. The most typical SaaS's advantages are cost reduction, Software rapid development and deployment. However, once government agencies decide to adopt SaaS, they can not avoid many problems and difficulties. There is no information in a detailed item in a budget. In those kinds of situation, there is no choice whether government agencies accept SaaS provider's suggesting adoption costs or not. Thus, we provide a sheet of SaaS adoption cost estimation to government agencies. To know the cost factors, this study uses TCO(Total Cost of Ownership)'s criteria. To give a management point, this study uses Gartner's Application development Life Cycle. In this study, the integration check framework which is SaaS adoption cost estimation makes government agencies possible to establish a adequate budget.

Sensititivity Analysis For Development Of Gulf Of Alaska

  • Pak, Ee-Tong
    • 한국해양학회지
    • /
    • v.11 no.2
    • /
    • pp.57-63
    • /
    • 1976
  • It was attempted to analyze the sensitivity of the oil prospect place named MARIA which placed inside Gulf of Alaska. For the analysis, P6031090, ECOANA( computer) which installed in the head office, Shell Oil Co was used and the data needed for computer programming were 1) Unit of Production data 2) Production Schedule 3) Total Gross Yearly Expenses and 4) Total Gross Capital and so on. The important data among the computer output 1) PVPAT (Present Value After Tax): $1,167,077,500 2) Payout After Tax: 3.14 Years (256,284,810 BBL Production) 3) Earning Power: 42% (After Tax) 4) PVPAT/BBL : $1.22 5) Capital/BBL : $2.00. On the other hand, the effect acted upon PVPAT with varying the Platform cost, Facility cost, Pipeline cost and Well cost was observed in comparion with the basic for range from 50% to 200%. Resultantly, the order was 1) Pipeline cost 2) Facility cost 3) Well cost 4) Platform cost for range form 100% to 200%. This project was completed by the contract with Shell Oil Co., and the geological data needed for this analysis were given by the head office and the development project started from Jan. 1976.

  • PDF