A Study on the improvement method for Idea from the design VE using ASIT (ASIT 기법을 활용한 설계VE 아이디어 개선방안에 관한 연구)

  • Lee, Gun;Go, Seong-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1023-1028
    • /
    • 2007
  • It is the most important thing of the overall VE that we create inventive ideas from idea phase in the design VE. However, it is hard that it take a long time and create a superior idea using Brainstorming. And, it was real to lodge an alternative plan proposed on the idea thinking phase, it is true that an alternative plan of existing simply costdown apply to a change and insert isn't different from an inventive idea deduction. Also creating alternative idea, many expert hold on to only his field and it was exposed a limit depend on a team's experience or intuition than technical solution. In this study, we analyzed the problem of the present design VE processing and analyzed the problem through a survey to an expert, and then we'll suggest a possibility for an efficient design VE.

  • PDF

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction (시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구)

  • Cho, Ki-Yon;Park, Mi-Yun;Kim, Sung-Hun;Seo, Jong-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF

VE/LCC Analysis Models of Breakwaters by Fuzzy Reliability Approach (퍼지 신뢰성 이론에 의한 방파제의 VE/LCC 분석모델)

  • Ahn, Jong-Pil;Park, Ju-Won;Yu, Deog-Chan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.159-167
    • /
    • 2007
  • In this study, the concepts of integrated VE analysis assessment is introduced in order to achieve "Design for Deterioration performance" in design VE phase. For this purpose, a framework for fuzzy reliability based LCC and value analysis model using fuzzy logic based approach for breakwaters Projects is suggested. It is anticipated that the methodology Proposed in this paper can also be utilized in the design and maintenance phase of other facilities where decision making is made for the fuzzy reliability based life cycle cost and value analysis.

Review of effectiveness at the Construction implementation design VE study by the selected target through CostModeling in the Pre-functional analysis Phase (건설공사 실시설계 VE시 기능분석 이전 단계에서 CostModeling을 통한 핵심 쟁점 사항 도출에 의한 효용성에 관한 고찰)

  • Jeong, Yeon-Goo;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.244-245
    • /
    • 2021
  • Design VE (Value Engineering) has been basic design and implementation design separately, but due to the recent change in guidelines, it is changing to implement only once in the implementation design stage. However, in the implementation design stage, construction costs, plans, and specifications based on the volume details are almost completed. Therefore, it is effective to perform the function analysis step after identifying information analysis and key issues through CostModeling based on functional center for the selected target in the process of implementing the VE performance procedure.

  • PDF

A Study on the Hindrance Factors of the Productivity in Design VE Phase (설계 VE단계에서 발생하는 생산성 저해요소 분석 - '00공사 사옥 신축공사' 사례를 중심으로 -)

  • Choi, Ji-Hye;Sang, Jun;Kim, Ban-Seok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.178-179
    • /
    • 2013
  • After the introduction of the design VE system in 1990s, based on the legal system has made a rapid growth. Also It is evaluated as qualitative growth. Despite this growth, VE effort can cause the occurrence of the risk. In this paper carried out to hindrance factor that decrease the productivity in VE phase for strategy to improve the utilization of basic data.

  • PDF

Procedures and Strategies for a Function Definition in the Design Phase VE (설계VE에서 기능정의를 위한 절차 및 방안)

  • Lee, Hyun-Jong;Park, In-Woo;Hyun, Chang-Taek;Koo, Gyo-Jin;Hong, Tae-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.151-156
    • /
    • 2007
  • 2006년부터 VE 대상프로젝트가 확대되고, 기본설계와 실시설계단계에 각 1회씩 설계VE를 적용토록 규정되어 설계단계별로 VE가 각각 적용되는 프로젝트가 늘어나고 있다. 그리고 원가절감과 성능향상으로 프로젝트 가치를 높인 설계VE 사례도 많아지고 있다. 하지만 기본설계와 실시설계단계의 조건에 적합한 VE 수행방안에 대한 연구가 미진하고 참여자들의 경험과 이해가 부족하여 단계별 설계VE를 효율적으로 수행하는데 많은 어려움이 있다. 본 연구에서는 기본설계단계와 실시설계단계로 나누어 VE를 수행한 실무사례를 분석하여 기능정의와 아이디어 창출간의 연관관계 및 각 설계단계에서 기능정의를 수행할 때 발생하는 문제점을 도출하였다. 문제점을 해결하고 효과적인 설계VE를 수행하기 위하여 다음과 같은 개선방안을 제시하였다. 첫째, 설계프로세스의 흐름에 맞추어 기본설계에는 공간기능에 대하여하고 실시설계에는 부위에 대하여 기능정의를 수행한다. 이때 상위의 레벨에는 하위의 레벨의 기능정의가 연계되는 기능분류체계 (FBS : Function Breakdown Structure)를 제안하였다. 둘째, 기본설계와 실시설계단계의 기능정의를 수행하는 프로세스 (FDP : Function Definition Process)를 제안하였다. 셋째, 실시설계단계에서는 부위별 요구 성능 평가 매트릭스 (EFM : Element Function Matrix)를 적용하여 기능정의와 아이디어 창출이 연계되도록 하였다. 설계VE의 주요 부분인 기능정의 과정에 대한 문제점을 도출하여 해결방안을 제시함으로써, 보다 효과적인 설계VE의 수행을 기대할 수 있다.

  • PDF

Improvement for Subject Selection using SWOT Analysis in the Design Value Engineering (설계VE에서 SWOT분석을 이용한 대상선정 개선방안)

  • Yun, Su-Won;Kim, Hong-Hyun;Min, Kyung-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.872-876
    • /
    • 2008
  • 설계VE 프로세스 과정 중 기능분석을 성공적으로 수행하지 위해서는 VE대상의 선정이 중요하다. 그러나 설계VE활동시 대상선정 단계에서 설계VE 집중검토대상을 선정해야 하지만 그 활용성이 미비하였으며, 활용방법에 어려움이 따랐다. 이에 본 연구는 대상선정을 명확하게 하여 차후 기능분석에서 효과적으로 반영할 수 있는 방안으로 SWOT분석을 제안하고자 한다.

  • PDF

Alternative Evaluation Method of GFI-based Construction Value Engineering (GFI를 활용한 건설공사 시공VE 대안평가 방법)

  • Kim, Sooyong;Lee, Youngrok;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.3-10
    • /
    • 2015
  • Value engineering (VE) of the construction project is classified into design phase value engineering and construction phase value engineering. Design phase value engineering must apply to over 10 billion public construction projects by government law. Therefore, the design value engineering apply to actively in construction projects. In contrast, the construction value engineering apply to a limited certain construction project. The reason is that construction value engineering process can not reflect practical demands quality. The construction value engineering can implement to positive impact through the feasibility verification for constructability. In this research, we propose a method of construction value engineering that reflect the practical demands. This method is experts alternative evaluation of using by GFI-based. And, this study was applied to the practical cases to verify the applicability of the proposed method. As a result, proposed alternative evaluation method were analyzed highly efficient in terms of applying the process as well as the method compare to the conventional method.

Analysis of Main Control Factors for Design Value Engineering Work in Construction Projects (건설 프로젝트 설계VE 업무의 중점 관리 요인 분석)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.128-137
    • /
    • 2006
  • Recently the role and the importance of design value engineering is expected to be high, so research is needed for its effective accomplishment. But in domestic arena, the introduction of the history of design value engineering is too short and insufficient in act of research. Therefore in this research we have suggest the standard for the effective accomplishment of design value engineering work. The way is the abstraction many causes. firstly, we analyzed the team project case of value engineering professional instruction. second, we analyzed the cause of problem produced in accomplishment process of design value engineering work through research for the professional field. So from the base of the analyzed content, we have suggest main control factor for the effectiveness of design value engineering work and the following scheme and process of work efficiency optimization.