• Title/Summary/Keyword: Design-By-Contract

Search Result 267, Processing Time 0.031 seconds

The Design and Development of a Onchain Game for Scalability Verification of Blockchain Platform (블록체인 플랫폼의 성능 및 확장성 검증을 위한 온체인 게임 설계 및 개발)

  • Jang, Kwang-Soo;Lee, Ook
    • Journal of Digital Convergence
    • /
    • v.18 no.10
    • /
    • pp.253-263
    • /
    • 2020
  • Since the birth of the Ethereum in 2015, various decentralized applications (DApp) based on blockchain smart contract technology have appeared. However, CryptoKitty's case showed instability in terms of performance and scalability in real-world service environments. To solve this, a blockchain platform that developed a high transaction per second (TPS) has appeared, but there have been no environments and services to test it. Therefore, this paper intends to design and develop a game that can record the contents of all games on the chain and verify the performance and scalability of the blockchain platform through oversized transactions. The developed game generated a total of 6.3 million blocks and 8.9 million transactions through by 682 and verified the improved performance and scalability of the existing platform. Additionally, the maximum TPS was measured at 1,309 during the test period. In the future, it is expected that performance and scalability can be compared in a realistic environment through the method presented in this paper.

A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector - (현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로-)

  • Chung Myung-Woo;Lee Hwa-Young;Seo Yong-Chil;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2001
  • Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.

  • PDF

An Analysis on affecting factors about lowly using 3D CAD by using the AHP (계층분석법을 이용한 3D CAD 활용 저조에 대한 영향 요인 분석 연구)

  • Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun;Ahn, Byung-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.188-196
    • /
    • 2007
  • Because the construction is becoming bigger and the construction environment is rapidly changing, IT/IS(Information Technology and Information System) of the construction is recently suggested with the alternative proposal. So not only is a study progressed in the area of the BIM(Buidilng Information Modeling), VC(Virtual Construction) and CIC (Computer-Integrated Construction) but also of the information database of the construction for building the information infrastructure of the construction in the domestic construction. Because object-oriented 3D CAD improves the efficiency of a design work and includes the object information which can use with the base of the information database of the construction, it has the high value not only in the design level but also in the construction life cycle. But compared with the effect, the use of 3D CAD is sluggish in the construction. In this study, after surveying about lowly using 3D CAD on the point of AEC (Architect-Engineer-Contract), the result is analyzed with AHP(Analytic Hierarchy Process). So the aim of this study is to offer the base to find the solution of the Affecting factors about lowly using 3D CAD.

The Effects of Goal Incongruity between Franchisor and Franchisee on Regulatory Focus, Performance, and Opportunism of Franchisee (프랜차이즈 본부와 가맹점 간 목표불일치가 가맹점의 조절초점, 성과, 그리고 기회주의에 미치는 영향)

  • Lee, Byong-Kwan Steven;Oh, Sejo;Kim, Sang-Duck
    • Journal of Distribution Science
    • /
    • v.12 no.2
    • /
    • pp.39-47
    • /
    • 2014
  • Purpose - The ultimate goal of a franchise system comes from its win-win strategy. Agency theory uses goal incongruity to examine complex contracting problems between buyers and suppliers. Goal incongruity within a contractual relationship can be defined as the agent's desire not to cooperate. It is the degree to which the contractual terms do not satisfy the agent's goals. The greater the goal incongruity between the agent and the contract, the more likely it is that the agent will meet the terms of the contract. Thus, goal incongruity between buyers and suppliers has close relationships with both behavioral and financial performance. This study tries to examine these relationships in the franchise context using a model including related variables, such as regulatory foci, financial performance, and opportunism, to explain the reasons that not all franchisees perform their best. In particular, the study examines the effects of goal incongruity on regulatory focus, and the effects of regulatory focus on performance and opportunism. In short, the objective is to determine goal incongruity's effect on regulatory foci, and the effect of regulatory focus on performance and opportunism. Research design, data, and methodology - This study used data collected from the franchisee managers of 104 franchisors in South Korea. The franchisors include more than 10 franchisees, the majority of whom have been in business for more than five years. The study also surveyed 104 franchisees, matched with their franchisors for the sake of a dyadic approach. The study used regression analysis to test the hypotheses. Results - H1 and H2 predicted that goal incongruity would decrease promotion focus and increase prevention focus. Supporting H1, the result indicates goal incongruity had a positive effect on promotion focus. However, H2 was not supported. Goal incongruity had no significant effect on prevention focus (β = -.375, t = -4.331 and β = -.145, t = -1.950, respectively). H3 and H4 predicted that promotion focus would increase financial performance and decrease opportunism. Supporting these hypotheses, the results indicate that promotion focus had a positive effect on financial performance and a negative effect on opportunism (β = .771, t = 7.899 and β = -.765, t = -6.778, respectively). H5 and H6 predicted that prevention focus would decrease financial performance and increase opportunism. However, the results do not support these hypotheses. The results indicate that prevention focus had no effects on opportunism or financial performance (β = -.130, t = -1.070 and β = .090, t = .641, respectively). Overall, the evidence generally supported the hypotheses. Conclusion - Goal incongruity between a franchisor and a franchisee increases the franchisee's financial performance and opportunism, and the relationship is mediated by promotion focus. Interestingly, however, prevention focus has no mediating effect between goal incongruity and performance. Even though no significant relation exists between goal incongruity and prevention focus, the results have two implications. First, decreasing goal incongruity can improve financial performance and suppress franchisee opportunism. Second, the relationship between goal incongruity and performance affects promotion-focused franchisees.

Impacts of Buyer-Supplier Cooperation on Trust and Performance: Moderating Role of Governance Mechanism (구매자와 공급자 간 협력활동이 신뢰 및 성과에 미치는 영향: 거버넌스의 조절효과를 중심으로)

  • Kim, Kyung-Tae;Hui, Liang;Lee, Jung-Seung
    • Journal of Distribution Science
    • /
    • v.14 no.8
    • /
    • pp.113-121
    • /
    • 2016
  • Purpose - This paper aims to examine the impact of buyer-supplier cooperation on suppliers' trust on buyers and the moderating role of buyers' governance mechanism between the sharing activities and trust. Research design, data, and methodology - An integrated research model is designed to materialize the research hypotheses. First, the impact of buyer-supplier cooperation is empirically analyzed by looking into how the sharing activities, in the field of information, resource, and knowledge, of buyer with supplier will affect the trust of supplier on buyer. Second, the moderating effect of contract-based governance mechanism of buyer is empirically analyzed. Third, the influence of trust on innovation performance of suppler is empirically analyzed. Results - Our findings provide supporting evidence for some of our hypotheses. First, all of the sharing activities are significantly influential, but in different degree, to trust of supplier. Second, contract-based governance mechanism of buyer have a moderating effect on the relationship between sharing activities and trust, positively in resource-sharing activities, negatively in information-sharing activities, not significant in knowledge-sharing activities. Third, supplier's trust on buyer positively affects supplier's own innovation performance. Conclusions - The strategies applied in supply chain management have become important as the competition among firms has shifted from competition between individual firms to competition between supply chains. A customer's sharing activities with its supplier may contribute to an increase in innovation performance. The supplier's information-sharing activity with its customer could affect its information-sharing activities with its main supplier. Cooperative activity with a partner in the supply chain is cultivated and amassed into relationship knowledge, and this study shows that the cooperative relational knowledge related to information-sharing activities enables firms to participate in sharing activities with their main suppliers. Increasing evidence shows that sharing various activities between buyer and supplier improves trust and performance outcomes, and enables firms to maintain competitive advantage. From the perspective of knowledge theory, external knowledge is becoming more important in firms' innovation activities, because innovative knowledge is acquired primarily through interaction with another organization. In addition, relationship learning could be an important tool in absorbing the supplier's core technology, information, expertise, and core competencies, increasing relational value.

Strategies for Continuous Transactions with Customers for B2B Software Retailers: Case Study (B2B 소프트웨어 유통 중소기업을 위한 고객과의 지속거래 유지 전략: 사례 연구)

  • Choi, Yong-Jun;Kim, Wan-Ki
    • Journal of Distribution Science
    • /
    • v.16 no.12
    • /
    • pp.81-93
    • /
    • 2018
  • Purpose - The purpose of this study was to propose a specific and empirical continuous transaction strategy through service quality of improvement to small and medium Korean companies whose main business is B2B distribution and sale of general-purpose SW. Research design, data, and methodology - The research procedure is largely divided into two phases. In the first phase, the service quality, the customer satisfaction, and the continuous transaction research hypothesis and the verification are carried out. Experimental data were collected from 450 companies, CEO companies of SMEs innovation institutes, and 510 companies from medium and large enterprises. From September 15 to October 5, 2015, 215 questionnaires were used. And research hypothesis and test were conducted by SPSS SW Ver. 20. Results - The results of the study confirm that service quality has a positive effect on customer satisfaction and continuous transaction: as the detailed items for improving the service quality, 'responsiveness', 'assurance' and 'empathy' have been adopted. Therefore, there are critical factors of a company's survival through continuous transaction. Conclusions - Through this study, we confirmed that the survival of small businesses require continuous improvement in service quality. Among the factors improving service quality, empathy means service satisfaction of customers; so, it is necessary to continuously improve it by evaluating customer satisfaction. Responsiveness means rapid response to customer needs and reliability; it is necessary to enhance customer responsiveness by continuous job training and service training. Finally, assurance is the same as sales product or after service. This means that it is necessary to not only issue the "supply contract," but also improve the reliability of the sales product by securing the competence of the consulting professional. However, because the service quality measurement factors selected in this study are the measurement factors that are mainly applied to large companies or those in the service industries, it is important to consider the type of sales of software distribution companies.

The Analysis of the Weights of Country Risk by Participants of Overseas Construction Projects (건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석)

  • An, Byung-Ho;Kim, Jin-Eon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.150-159
    • /
    • 2013
  • The government has focused on activation of overseas construction projects and strengthening competitiveness in the long term. In recent years Public construction contract as well as design, engineering, construction management(CM) are gradually expanding into other countries, but risk analysis cases in the field are slight. In this study, We utilized PI scale and drew a conclusion about the importance of overseas risk by participants. We compared its features from the risk factor based on Risk Matrix. As a result of this study total of 6 section 31 Country Risk factors for the importance of overseas risk by participants were drawn, and the key risk factors (17 constructor, 14 designers, 17 CMr) based on Risk Matrix were derived. By utilizing the result of this study will be used as the basic data for establishing risk management strategy to meet each business and planning evaluation model.

Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (AHP 기법을 이용한 BTO 민간투자사업 협상의 주요쟁점 특성분석)

  • Roh, Tae-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.8
    • /
    • pp.234-244
    • /
    • 2007
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

A Study on Characteristic Analysis of Major Issues in Negotiating Concession Agreement for BTO Projects Using AHP (계층화분석법에 의한 BTO 민간투자사업 협상의 주요쟁점 특성분석에 관한 고찰)

  • Roh, Tae-Ho;Kim, Jong-Won;Lim, Chang-Sik;Lee, Jong-Chool
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.137-146
    • /
    • 2008
  • Both competent authorities and private entrepreneurs face plenty of risks when negotiating BTO(Build Transfer Operation) methods of PPI(Private Participations in Infrastructures) projects. Also, success and failure of projects largely depend on the concession agreement contract. In this study, for more efficient negotiation, major issues are examined, and quantitatively analyzed to find out not only the relationship but also the characteristics of which these issues share. Questionnaire research was conducted through both research and by experts who were divided into an ordering agency, design company and constructor. Characteristics of major issues were quantitatively analyzed using the Likert index method, ANOVA(ANalysis of VAriance) and AHP(Analytic Hierarchy Process) analysis. Case studies were examined in order to estimate construction cost, rates of return, government finance support, level of operation-revenues guarantees, estimating operational costs and usage fees. With these 6 items, relative priority, relative impression which is sensible to risk and extent of difficulty in presenting data which is objective were quantitatively analyzed by the ordering agency, design company and constructor groups. From the analysis, there were some similarities between the design company and constructor groups while there was less of similarities between the ordering agency and design company or constructor. The government is diversifying the methods of project promotion, and PPI project from infrastructure-centered to public culture facilities are being expand. The current study will provide not only supporting efficient negotiation but also revitalizing PPI projects.

A Study on the Data Organization of Specification Information for reference of Design Information (설계정보 참조를 위한 시방정보의 자료구조화에 관한 연구)

  • Kim Jae-hyun;Song Younk-Kyou;Kim Uk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.92-100
    • /
    • 2001
  • The architectural drawing, construction project specification, etc. are included in the contract of a documents. However, construction project specification, for being documentation, is not utilized to such an extent. The reason is that specification information is difficult in collecting information in relation to the architectural drawing, material finishing list and other architectural information. Therefore, an integrated model, which can be associated with other architectural information, is needed, and a DB based on this integrated model must be established in order for it to be utilized in design, construction, and management. The DB, which is established through this process, must be updated according to modification in design, and construction. Furthermore the specification must be in document on the web for reference. Consequently in this research, the structure of integrated model has been introduced, and it has made the search and preparation of the integrated model on the Internet, using the specification information DB established for the mutual reference of DB, possible. The improvements of construction project specification standards are expected by this system. Also, it will bring about Improvements upon claim prevention, and design, construction, management qualities. Furthermore, it will make the use of information more convenient in practical business such as order agency, design service and building site.

  • PDF