  • Performance curve of the desiccant rotor is an important information when developing and selecting the desiccant dehumidifier. The effective utilization of the energy is major capacity for the system and the desiccant performance curve is a design ability for a designer. By the rotor supply contract with DRI, ECO-DRY programs would be offered. Moreover, it could make remarkable progress in the desiccant system and energy saving. It is good to introduce the programs with the amicable help of DRI.

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

A Case Study on Collaborative Activities for Newly Installation of an Engine in a Helicopter (헬기 엔진의 신규장착을 위한 지원 사례 연구)

  • Ahn, Ieeki;Kim, Jae-Hwan;Sung, Oksuk
    • Journal of Aerospace System Engineering
    • /
    • v.8 no.2
    • /
    • pp.27-32
    • /
    • 2014
  • From the flight safety and the performance point of views, a new engine installation impacts an helicopter development or upgrade program significantly. More than a close relationship between an aircraft manufacturer and an engine manufacturer is necessary for the best integration work from the program initiation phase. In this paper, technical cooperation between aircraft and engine companies, and technical supports by the engine manufacturer for the T700/701K engine during the Surion development program are summarized. The applications of official technical program documents, US Mil-spec, France airworthiness regulations as the standard of the engine installation work, and engineering activities at each phase such as contract, design and manufacturing, flight clearance, ground and flight tests are described. This paper would be a cornerstone for the future domestic helicopter development program.

Study on design of computer maintenance & repair system using SLA technique (SLA 기법을 활용한 컴퓨터 유지보수 시스템 설계에 관한 연구)

  • 김성선;최용식;신승호
    • KSCI Review
    • /
    • v.12 no.1
    • /
    • pp.21-27
    • /
    • 2004
  • In this study We designed development and operation of computer maintenance & repair system which is efficient and systematic on the disorder of PC in the places with many computers such as company, public organization. school, etc. We designed so as to clearly measure and manage the service level by using SLA(Service Level Agreement) technique which is being used actively in network maintenance & repair contract. And We designed system which can provide One Stop Service so that the whole process of service including service demand point, maintenance & repair activity, user's satisfaction.

  • PDF

Calatrava's Morphogenetic Mechanism Based on Methodological Hypothesis; Analogy and Analysis (칼라트라바의 방법론적 전제에 의한 형태구성 메커니즘)

  • Park, Sun-Woo;Choi, Sun-Young;Park, Chan-Soo;Choi, Chui-Kyung
    • Proceeding of KASS Symposium
    • /
    • 2006.05a
    • /
    • pp.142-152
    • /
    • 2006
  • The purpose of this study is to explore an inquisitive and innovative approach to structure and form, Calatrava's morphogenetic mechanism and to trace the ideas behind his working methods and his theoretical preoccupations. The bridges and buildings of S. Calatrava possess a breathtaking rhythm and of them some are designed to expand and contract like living organisms. The analogy Calatrava has used as a creative tool to mutate human bodies into arcing roof forms and bridge suspensions is introduced to illustrate the morphogenetic process. At the same time, the analysis used developing how to design frame structures foldable with brilliant mathematical solution is also investigated. Consequently, the potentialities of Calatrava's morphogenetic mechanism to invent new systems are generated by methodological hypothesis; analysis and analogy.

  • PDF

Sequential Pattern Mining for Customer Retention in Insurance Industry (보험 고객의 유지를 위한 순차 패턴 마이닝)

  • Lee, Jae-Sik;Jo, Yu-Jeong
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2005.05a
    • /
    • pp.274-282
    • /
    • 2005
  • Customer retention is one of the major issued in life insurance industry, in which competition is increasingly fierce. There are many things to do to retain customers. One of those things is to be continuously in touch with all customers. The objective of this study is to design the contact scheduling system(CSS) to support the planers who must touch the customers without having subjective information. Support-planers suffer from lack of information which can be used to intimately touch. CSS that is developed in this study generates contact schedule to touch customers by taking into account existing contact history. CSS has a two stage process. In the first stage, it segments customers according to his or her demographics and contract status data. Then it finds typical pattern and pattern is combined to business rules for each segment. We expert that CSS would support support-planers to make uncontacted customers' experience positive.

  • PDF

Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage (건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석)

  • Lim, Se Jong;Jeong, Seong-choon;Na, Ye Ji;Won, Jeong-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

A Study on the Application of Design Process in the Architectural Design Practice (건축설계 실무과정에서 디자인 프로세스의 적용에 관한 연구)

  • Kang, Mi-hyun;Kim, So-ra;Shin, Byeong-uk
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.24 no.3
    • /
    • pp.59-66
    • /
    • 2022
  • This study aims to find out how architectural designers applied the design process and what content is applied in the practical process of architectural design in Korea, and to improve it if there is a problem. So the study is carried out by investigating 13 architects(Including one person who wants to keep his work private) with extensive experience in architectural design. The architects were questioned on how and what content the design process was used for their representative works that had been designed. And interviews and field surveys were conducted on other matters to be improved. The survey was conducted from November 2021 to July 2022. According to the conclusion of this study, First, Most architects were applying the design process in the architectural design practice. These are caused by an impact on education, but there was also an aspect of preparation in terms of guidelines such as the Architects Association and storage rights. Second, Although the design process differed in each name and phase, it was generally carried out in the order of the start phase, the planning work phase, the basic design phase, the intermediate design phase, the implementation quarterly, and construction. Third, The step-by-step work of the design process differed slightly depending on the architect, but counseling and contract work were mainly performed at the start-up phase, and field surveys, legal investigations, and case studys were conducted at the planning phase. In the basic design phase, some contents related to architectural programming, basic drawings, images, and models were used as main work contents. In the intermediate design phase, secondary contents such as licensed books and facility facilities were the main tasks. In the implementation design phase, detailed maps and various frost facilities were finally inspected. Since then, construction and supervision have been carried out in the order of progress. Forth, As for the contents to be improved in the future, the architect's ability, the designer's knowledge of the overall architecture, the design supervision system, and the expansion of time for the initial design process were answered.

A Study on the Evaluation System for Bidders to According to the Best Value Bid System by Technology Proposal Method (기술제안방식의 최고가치낙찰제도 입찰자 평가체계에 관한 연구)

  • Yeo, Sang-Ku;Lee, Gun;Lee, Hyun-Chul;Go, Seong-Seok
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.211-216
    • /
    • 2009
  • Bidding systems in the domestic public construction work have been amended many times since the lowest-bidding system was implemented in 1951. However, this hasn't had much success. Competition in technical development among companies has declined as the contracts for buildings are given to company which submits the lowest price without considering traits of projects. In addition, as the construction market turns to the limitless competition system due to FTA(Free Trade Agreement), advanced techniques are needed to promote the national competitive power. Considering the needs of the times, Korean government announced that "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" are included to 4 existing bidding systems in October 2007. Thus this study aims to suggest devised the evaluation criteria including major items for evaluating bidders, in order to establish and revitalize the best-value bid system successfully.

  • PDF