Design Structure Matrix: A Model Proposal and Implementation on Harbor and Building Design Project

  • Akram, Salman;Kim, Jeonghwan;Pi, Seungwoo;Seo, Jongwon
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.144-152
    • /
    • 2013
  • Design is an iterative, generative, and multidisciplinary process by its nature. Iteration occurs often in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. Contrary to simple design, isolation of the generative iterations in complex design systems is very difficult, but reduction in overall iterations is possible. Design depends upon the information flow within domain and also among various design disciplines and organizations. Therefore, it is suggested that managers should be aware about the crucial iterations causing rework and optimal sequence as well. In this way, managers can handle design parameters related to such iterations pro-actively. There are a number of techniques to reduce iterations for various kinds of engineering designs. In this paper, parameter based Design Structure Matrix (DSM) is chosen. To create this DSM, a survey was performed and then partitioned using a model. This paper provides an easy approach to those companies involved in or intend to be involved in "design and build projects".

해외건설공사관련 계약적 리스크 인자에 대한 연구 - FIDIC Red Book 1999년판 기준 - (Identification of Contractual Risk Factors for Application in the Overseas Construction Projects based on FIDIC Red Book 1999 Edition)

  • 현학봉;박형근
    • 대한토목학회논문집
    • /
    • 제36권6호
    • /
    • pp.1153-1160
    • /
    • 2016
  • 해외건설공사와 관련된 리스크에 대해서는 많은 연구들이 있었으나, 계약조건의 내용을 토대로 한 리스크 인자도출이나 분석은 없었다. 건설공사에서의 권리와 의무가 계약내용에 따라 발생한다는 가장 기본적인 사실을 고려할 때 계약적 권리와 의무를 규정하고 있는 계약조건의 내용에 따른 리스크의 인식과 대응은 해외건설공사의 성공적인 수행에 필수적인 요소이며 따라서 계약조건을 기반으로 한 리스크 인자도출은 중요하고도 핵심적인 가치를 가질 수 있는 것으로 판단되었다. 본 연구를 통해 계약시 유념하여야 할 핵심 계약적 리스크 인자들을 발굴함으로써 해외건설공사 입찰이나 계약시 많은 실무적인 도움을 줄 수 있을 것으로 기대한다.

Assessing Contractor Competition in Competitive Bidding for Highway Construction Projects Using Network Analysis

  • Le, Chau;Arya, Minakshi;Moriyani, Muhammad Ali;Le, Tuyen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.18-24
    • /
    • 2022
  • State highway agencies (SHAs) typically apply a competitive procurement procedure to select contractors for their design-bid-build projects. Since the level of competition affects construction bid prices and project outcomes, the Federal Highway Agency (FHWA) suggests SHAs seek ways to improve competition among contractors continuously. However, they rarely conduct an empirical assessment of the current competition level necessary to identify room for improvement. Besides the number of bidders on a project, other factors such as winning or losing rates among the contractors in previous projects can also indicate the degree of competition; only a few contractors may have won the majority of the projects in a specific region. However, few studies have investigated such factors. This paper proposes a network analysis-based approach to evaluating contractor competition levels of highway projects using historical bid tabulation data. The proposed method provides insights into overall competition levels, the determination of competitive contractors, and winning rate distribution among contractors.

  • PDF

아이레스 마테우스 건축에 나타난 디자인 조직체로서의 서브 트랙션 방법과 특성에 관한 연구 (A Study on the Subtraction Method and Characteristics as Design Organization found in the Architecture of Aires Mateus)

  • 김종진
    • 한국실내디자인학회논문집
    • /
    • 제25권2호
    • /
    • pp.3-12
    • /
    • 2016
  • Aires Mateus Architects is one of the most well-known Portuguese architects after $\acute{A}lvaro$ Siza and Eduardo Souto de Moura. The studio shows clear design methods in which the relationship between solid mass and void space are creatively inter-connected. Subtractive transformation of form is the fundamental aspect of this relationship. Most of Aires Mateus' projects were designed based on the subtractive method. Although subtraction can be seen as architectural formal presentation, in Aires Mateus' cases, there are deeper logics, strategies, and meanings. Not only to create a form, subtractive method has been flexibly used to organize and compose different programs and spatial atmosphere. To examine this hidden dimension of Aires Mateus' unique design process, 5 case projects were selected and analyzed in detail based on program, light & visual-perception, and site's placeness. From the case study results, it is found that there are much deeper role of subtraction: relationship between solid-void are constantly changing to generate serviced and servant spaces, there are central spaces that are contrast against the complexity of exterior forms, aiming to build an archetypal form that transcends ever-changing time, ambivalent balance between universality and peculiarity in the genealogy of contemporary architecture. The study concluded that the unique characteristics of subtraction method as design organization have various possibilities that can apply on other architectural and interior projects which would have similar ideas and circumstances.

Whole Life Performance Bid Evaluation in the Korean Public Sector

  • Park, Kenneth Sungho;Lim, Hyoung-Chul
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.682-700
    • /
    • 2012
  • Over the last several years, Korea has increasingly adopted design-build for public construction projects. There is a much greater awareness of the need to change to a system based on 'Value for Money', which is high on the government's agenda. A whole life performance bid evaluation model is proposed to aid decision makers in the selection of a design-builder. This is based on the integration of a framework using an analytic hierarchy process, as the bid awarding system is being changed from one based on the lowest price to one based on best value over the life-cycle. Key criteria such as whole life cost, service life planning and design quality are important through the key stages of the evaluation process. The model uses a systematic and holistic approach, which enables the public sector client to make better decisions in design-builder selection, which will deliver whole life benefits based on long-term cost-effectiveness.

민간투자(BTL)사업의 설계VE 적용 및 활성화 방안 연구 (VE Adaptability and Activation plan in Design Phase of BTL Projects)

  • 신정훈;심운준;이택운
    • 한국건축시공학회지
    • /
    • 제7권4호
    • /
    • pp.93-99
    • /
    • 2007
  • Highly advanced technologies are being adopted into the domestic construction industry in accordance with rapidly changing global construction industry in the 21st century. Value Engineering methodologies have often been discussed but not yet settled in the country. This research, therefore, aims to provide a useful guide to utilizing design Value Engineering in Build Transfer Lease. 1. Questionnaires had been conducted, answered by those in the field. 2. Questionnaires were in regard to the obstacles in the application of design Value Engineering and activation schemes. 3. Five standards were provided to be chosen according to the degree of influence from each factor, whose answers were technically analyzed by a statistical program afterward. 4. Four obstacles classified in this method were approached systematically to analyze the problems. 5. Efficient Activation schemes have been suggested after various analyses in a variety of aspects.

골프장 트러스구조 구조안전성 검토사례 (Analysis of structure stability of Golf structure of truss)

  • 강동균;윤성원;홍현표
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 한국공간정보시스템학회 2004년도 춘계 학술발표회 논문집 제1권1호(통권1호)
    • /
    • pp.275-278
    • /
    • 2004
  • This paper focused on problems of design, construction, and maintenance caused by construction implementation processes. They were analyzed through case study of structure safety diagnosis projects. From the case study, it is expected that the introduction of Construction Management from the first stage of procurement will improve construction cost increase or burden on small design company. It strengthens coherent management from design and source contractor selection to build review of responsibility. The coherency will prevent changes in designing or infirm unreliable construction. It is desirable that expert opinions are considered when structure changes and establishment occur and that, if necessary, actions such as source selection, periodic audits, and diagnosis arc checked and fed back to maintenance.

  • PDF

Detecting Red-Flag Bidding Patterns in Low-Bid Procurement for Highway Projects with Pattern Mining

  • Le, Chau;Nguyen, Trang;Le, Tuyen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.11-17
    • /
    • 2022
  • Design-bid-build (DBB) is the most common project delivery method among highway projects. State Highway Agencies (SHAs) usually apply a low-bid approach to select contractors for their DBB projects. In this approach, the Federal Highway Agency suggests SHAs heighten contractors' competition to lower bid prices. However, these attempts may become ineffective due to collusive bidding arrangements among certain contractors. One common strategy is the rotation of winning bidders of a group of contractors who bid on many of the same projects. These arrangements may also be specific to a particular region or vary in time. Despite the practices' adverse effects on bidding outcomes, an effective model to detect red-flag bidding patterns is lacking. This study fills the gap by proposing a novel framework that utilizes pattern mining techniques and statistical tests for unusual pattern detection. A case study with historical data from an SHA is conducted to illustrate the proposed framework.

  • PDF

효율적인 턴키사업 추진을 위한 클레임 저감방안 (A Reduction of Claims for Efficient Turn-key Project)

  • 오예근;손정락;김재준
    • 한국건설관리학회논문집
    • /
    • 제13권3호
    • /
    • pp.122-130
    • /
    • 2012
  • 현재 우리나라에서 진행되고 있는 턴키사업은 근원적인 장점을 살리기 보다는 여러 가지 문제점이 지적되고 있다. 설계심의 방법 및 적격자 선정단계의 문제점과 제도 및 계약기준, 입찰안내서(지침서)의 불명확한 내용 등으로 턴키사업수행과정에서 각종 클레임(Claim)이 증가되고 있는 것이 현실이다. 국내 턴키사업이 바람직하게 정착되기 위해서는 입찰 및 계약단계에서 설계심의 방법과 실시설계 낙찰자 선정에 대한 적정한 대안을 마련하여야 하는 것은 물론, 턴키사업과 관련된 계약 및 발주기준, 입찰안내서의 불합리한 부분에 대한 합리적 기준을 마련하여야 한다. 본 연구는 설계변경 등 계약변경이 어려운 턴키발주사업의 클레임 사례를 분석하여 문제점을 도출하고, 이를 토대로 관련 계약 조건 및 입찰안내서의 개선방안을 제시함으로써 턴키사업으로 추진하는 공동주택건설사업의 클레임을 저감하여 효율적 사업수행에 기여하고자 하는 것이다.

철도인프라 BIM기반 공사 발주를 위한 평가기준 제안 연구 - 기존 발주사업 적용 사례를 통해 - (A Proposal Research of Assessment Standards for Ordering BIM-based Projects in Railway Infrastructure - Case Study on Application of Existing Projects -)

  • 손서연;이근일;정지현;문우형
    • 한국BIM학회 논문집
    • /
    • 제11권4호
    • /
    • pp.10-19
    • /
    • 2021
  • In the evaluation for ordering BIM-based projects (Design Build) of Korean National Railway, criteria of BIM-based smart construction technology are assessed. Unlike the existing assessment criteria, performance resources and detailed assessment guidelines have been added by this research. The purpose of this study is to propose qualification assessment standards according to specific guidelines when evaluating on the phase of bidding for BIM-based projects. In the study, an improved evaluation standard (draft) was arranged based on two consultation meetings and surveys of related companies, applied to existing projects with the companies that won the bid, and validated. As more specific and added criteria compared to the existing standards, it could reduce the difficulty of evaluation for BIM capability and lay the foundation for railway BIM-based project management.