• 제목/요약/키워드: Design project

검색결과 4,024건 처리시간 0.028초

태백 고생대 박물관 계획 (Tae-Baek Natural History Museum Project)

  • 이무상
    • 한국실내디자인학회:학술대회논문집
    • /
    • 한국실내디자인학회 2007년도 춘계학술대회 논문집
    • /
    • pp.75-76
    • /
    • 2007
  • Recently with increasing interest in the natural science history education, a lot of natural science museums have been developed in various locations. This project is located in one of the biggest Paleozoic site, Taebak Kangwon-do. This kind museum has had important rolls in terms of education for student, destination for traveling and reservation of important holdover of the old ages. To do those kind of parts, this project has been designed with concepts and themes like; i. being organized with story telling structure with theme "secret of life and earth from Taebak" ii. combining experiences between outdoor experimental search for the real fossils and indoor educational interactions with real size model and moving films. iii. designing with strong identities of Paleozoic era. For the design identities the outer appearance was designed with motive of trilbites in an abstract way and inside was finished with exposed concrete and various size of moving films projected to walls and floor to emphasize real scale experience of the old ages.

  • PDF

학교시설 임대형민자사업의 평가기준 개선연구 (A Study on School Facilities Build Transfer Lease Project - Centering on the improvement of the assessment -)

  • 권병구;이재림;조진일
    • 교육녹색환경연구
    • /
    • 제7권2호
    • /
    • pp.30-46
    • /
    • 2008
  • In this study, were prepared after statistical analysis was conducted of assessment items and marks distribution for the selection of executors of the BTL project. When tests of the degree of dispersion and degree of appropriateness for each assessment item were analyzed, it was found that the degree of dispersion among assessment points has the power of discrimination since it is highly marked in the design field and operation management field. In contrast, 'business management plan' and 'investment composition for economic quality assessment' have a low level of the power of discrimination since points given to them have smaller difference between business projects.

  • PDF

라멘조 공법의 사업성 검토에 관한 기초연구 (Preliminary study on the Review Project Viability to Rahmen Structure)

  • 이성호;주진규;이군재;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.139-140
    • /
    • 2011
  • The government encourages adoption of Rahmen structure design to ensure efficient management of national resources. However, in comparison with bearing-wall structure, Rahmen structure requires higher unit construction cost and present challenges in terms of securing adequate floor area ratio and floor height. That is why project clients have been disinterested in adoption of Rahmen structure design. Therefore, we have attempted to find factors having influence on decline of project viability for Rahmen structure. This study will be utilized as a basic reference study for promotion of Green Frame design which is a composite PC structure already developed.

  • PDF

BIM(Building Information Model) 기반의 협업프로세스를 적용한 교육시설 설계에 관한 사례연구 (A Case Study on Design of Educational Facility Appling BIM(Building Information Model) based Collaboration Process)

  • 이상헌;장원준;전한종
    • 교육시설
    • /
    • 제15권6호
    • /
    • pp.39-46
    • /
    • 2008
  • The main purpose of this study is to find out the strengths and weaknesses of the application of BIM to the educational facilities. All the data information is drawn from the integrated design process which links various fields such as energy simulation, structure analyzation, and etc, and it is applied to the project combined as one data set. Moreover, we analyze the possible problems of the data exchange that can happen as collaborating with various fields while working on the project, and we present its solutions and the futher studies on this matter of a project.

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

BIM 프로젝트 시공단계의 설계오류 검토 방안에 관한 연구 (A Study on the Review Methods of Design Errors in Construction Phase of BIM Project)

  • 이세잎;심운준;안용선
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.25-27
    • /
    • 2012
  • The domestic construction industry recognize that review of design and construct-ability has the devastating effects. The way to take advantage of BIM for increase the possibility of discovered the design errors in advance are being discussed a lot recently. Since 2012, Public procurement published that the Turn-key project which is the more than 50 billion won in construction have to let the BIM-based design be mandatory. However, people expected the advent of BIM technology can resolve the existing design errors. But the situation is the connection of design stage and construction stage is very insufficient in domestic. Therefore, in this study understanding the types of design errors in construction phase. according the review of design errors before construction. Then can acceleration the application of BIM to improve the workability in a construction site.

  • PDF

공공디자인사업 수행 프로세스 현황연구 (The Current Conditions of the Operational Process of Public Design Project)

  • 박수경;문정민
    • 한국실내디자인학회논문집
    • /
    • 제22권6호
    • /
    • pp.173-180
    • /
    • 2013
  • As a way to raise the brand value of each area and activate local industries, public design projects have been competitively made. Meanwhile, public design has the characteristics of having an uncertain number of users, people with different interests, and management of the design by an administrative organization. Such characteristics may be obstacles to the results of public design and finally can cause many problems in a project's results. However, although most local governments have executed public design projects, systematic research for them and organized execution of the projects has been insufficient. For successful realization, proper organization, and consistent public design, research on a strategic design process is needed. Therefore, this study investigated the current status of public design projects to understand problems in the design process and solve them. The results are presented as follows: First, the design process for public spaces has a dual structure including a specialized process of design development in its execution and management and the execution process in the planning state is unsatisfactory and the process of designer selection is not consistent. Second, as a result of investigating the current status of the design process for public spaces, it was deduced that as most of the projects have been subjectively and temporarily managed by wholly charged organizations without specialized consultation or investigation with different related departments, there have been diverse problems in securing design quality. Third, as a result of analysing the specific execution processes carefully, it was suggested that problems in the process can be solved by decisions through consultation and discussion. As well supportive consultation systems should be used actively.

공공부문 일괄입찰사업의 설계VE 파트너링 활용방안 (Application of Partnering to Design VE to Public Design-Build Projects)

  • 김해곤;엄익준;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제7권1호
    • /
    • pp.110-118
    • /
    • 2006
  • 현행 일괄입찰방식은 분담이행방식의 공동도급형태로 운영되고 있어, 참여업체간의 의사소통 부족으로 설계기술과 시공기술의 접목이라는 일괄입찰방식 본래의 취지를 살리지 못하고 있다. 또한 입찰을 통해 확정된 총액금액으로 설계가 진행되므로 실시설계단계에서 VE활동을 통한 원가절감 노력이 거의 이루어지지 않고 있는 실정이다. 이에 본 연구에서는 현행 설계시공일괄방식의 특성을 파악하고 설계VE 적용사례를 분석하여, 설계VE 적용의 문제점이 무엇인지를 파악한 후, 일괄입찰사업 수행절차에서 설계VE 적용의 효과를 극대화할 수 있는 파트너링의 활용방법 및 그 적용시기를 제안한다.

시간-자원 트레이드오프 프로젝트 스케줄링 문제 해결을 위한 시뮬레이티드 어닐링 기반 휴리스틱 알고리즘 개발 (Development of a Heuristic Algorithm Based on Simulated Annealing for Time-Resource Tradeoffs in Project Scheduling Problems)

  • 김건아;서윤호
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제28권4호
    • /
    • pp.175-197
    • /
    • 2019
  • Purpose This study develops a heuristic algorithm to solve the time-resource tradeoffs in project scheduling problems with a real basis. Design/methodology/approach Resource constrained project scheduling problem with time-resource tradeoff is well-known as one of the NP-hard problems. Previous researchers have proposed heuristic that minimize Makespan of project scheduling by deriving optimal combinations from finite combinations of time and resource. We studied to solve project scheduling problems by deriving optimal values from infinite combinations. Findings We developed heuristic algorithm named Push Algorithm that derives optimal combinations from infinite combinations of time and resources. Developed heuristic algorithm based on simulated annealing shows better improved results than genetic algorithm and further research suggestion was discussed as a project scheduling problem with multiple resources of real numbers.

Challenges in Structural Design of W-Project

  • Kim, Jong Soo
    • 국제초고층학회논문집
    • /
    • 제3권3호
    • /
    • pp.199-204
    • /
    • 2014
  • W-Project is 70-story mixed-use residential building complex project in Busan, the second biggest city in South Korea. As it is a high rise building complex located at the coast, the residents have great ocean view from the height. Though, there were many difficult challenges to be solved to secure structural safety and meet the serviceability requirements. As it is located on the reclaimed land, securing the foundation bearing capacity on soft soil is the first issue to be solved for the stable structure. W-Project. Busan on the way usual track of typhoon, wind load on structure is also critical for structural safety and serviceability for occupants due to wind vibration. This paper will address process of lateral load resisting structural system of W-Project.