• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.045 seconds

Key Indicators for Evaluating BIM Collaboration Performances.

  • Sacchettini, Lou;Park, Moonseo;Lee, Hyun-Soo;Lee, Jin Gang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.236-240
    • /
    • 2015
  • The accelerating adoption of BIM (Building Information Modeling) is challenging collaboration practices established in the construction industry. The implementation of BIM involves changes in participants work, organization, processes and collaboration methods. Therefore there is a need to be able to measure effectively and accurately collaboration, in order to analyze and determine current practices and their performances in organizations (company, team project) as well as changes required. Previous researches scope from evaluating BIM maturity of an organization to BIM collaboration requirements but lack of proper tools and methods to analyze collaboration performances. This is especially true when it comes to evaluate the efficiency and collaboration performances of processes rather than systems or organizations. Thus this research aims to analyze systematically and comprehensively previous researches proposing diversified methods to evaluate BIM performances and collaboration. Furthermore it aims to suggest key indicators to evaluate collaboration performances of processes and project organizations. This research may contribute to better understanding of collaboration performances within organizations using BIM and further development of evaluation method for analyzing BIM design project.

  • PDF

Study on the Certificate System of the EIA Project Manager through Collaborative University Curriculum in Korea (한국에서 대학교과과정과 연계된 환경영향평가사 자격부여에 관한 연구)

  • Kim, Im-Soon;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.1
    • /
    • pp.81-95
    • /
    • 2008
  • The study is intended to develop the measures to introduce the Environmental Impact Assessment (EIA) project manager (Environmental Assessor), who will be responsible for leading the EIA task. This role requires a quality standard of expertise in the area of natural science, social science, knowledge and technology on environment design mechanism, and the integrated approaches that combine the relevant policies and systems. To facilitate the system, the certificate will be given to the person who is well acquainted with the knowledge on EIA with relevant experiences, thereby authorizing them to coordinate the assessment task for reliable outcome. Hence, the need for introducing the system is very crucial. The EIA project manager, as a guide for an EIA project team, shall be the person who has a comprehensive understanding of the project, the knowledge about the principal for implementation of EIA and the expertise in structuring the management system, with a skill to maintain the good relationship with the people engaged in the project. To that end, it is highly recommended to set up such a certificate system to be incorporated in the college curriculum.

The effect of Project Approach Program on Children's Cognitive Styles (프로젝트접근법이 유아의 인지양식에 미치는 영향)

  • Che Hang Chan;Hwang Hae Shin
    • Journal of the Korean Home Economics Association
    • /
    • v.43 no.4 s.206
    • /
    • pp.161-172
    • /
    • 2005
  • The present study investigation the effect of a project approach program on children's cognitive styles. It examined closely the characteristics and processes of the project approach program to determine its impact on children's individual cognitive styles such as divergent thinking, field independence, and reflection. The subjects were 384-year-old children. Eighteen children were assigned to the experimental group and twenty to the control group. Pretest-treatment-posttest design was adopted for this study. Collected data were analyzed with SPSS Win 10.0 and processed statistically using average, standard deviation, and ANCOVA. For the children's divergent thinking, the children with the project approach program showed significant difference in fluency and flexibility, but no difference in originality and elaboration, compared to the children in the control group. Children with the project approach program showed more field independence than those in the control group. Children with the project approach program showed no difference in reflection. These results showed that the project approach pro!3ram partly influenced the children's cognitive styles.

Electric Power System Relay Protection System Design for the Proton Accelerator Research Center of PEFP (양성자가속기 연구센터의 전력계통 보호계전 방식)

  • Mun, Kyeong-Jun;Lee, Seok-Ki;Jeon, Gye-Po;Cho, Jin-Sam;Min, Yi-Sub;Nam, Jung-Min;Kim, Jun-Yeon
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.428_429
    • /
    • 2009
  • 전력계통 운용시 고장이 발생하면 계통 운전원은 계전기 및 차단기 관련 동작정보 및 경보로부터 해당 고장내용을 판단하고 계통복구를 위한 조작을 행한다. 본 논문에서는 현재 건설중인 양성자가속기 연구센터의 전력 계통 운용시 발생한 고장에 따른 다중경보신호를 분석하기 위하여 전력계통의 고장영역별로 동작하는 보호계전기 신호, 차단기 신호 및 경보신호를 분류함으로써 이를 향후 전력계통 운용시 고장진단을 위한 기초자료로 활용하고자 한다.

  • PDF

Dynamic Modeling of Building Services Projects: A Simulation Model for Real-Life Hospital Project

  • Abhishek, V.;Jagadeesh, P.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.35-41
    • /
    • 2013
  • All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim- (건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 -)

  • Yoon Jun-Seon
    • Journal of Arbitration Studies
    • /
    • v.15 no.3
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF

Quality Management Model for Process Performance Level and Development Technology (프로세스 이행 수준과 개발 기술 품질 관리 모델)

  • Park, J.H.;Park, Y.S.;Jung, H.T.;Kim, S.H.
    • Electronics and Telecommunications Trends
    • /
    • v.32 no.6
    • /
    • pp.105-115
    • /
    • 2017
  • This paper describes a project - based quality management model that identifies development technologies and codes while at the same time verifying the ability to implement processes that are essential in R & D projects. In order to verify the process implemented in the R & D project implementation, there are review, checking points, and evaluating methods the process performance levels for five processes such as defining requirements which is the beginning stage of system development, testing process which is the completion stage of system development, and project management and peer review process for project management and support in the proposed project-based quality management model. For development technology and code validation, the model included the documented test cases for each requirement by the developer in the requirements definition stage, debugging and testing in the design and implementation stages, static analysis and open source licence verification procedure, and system environment. After applying the model in SW development R&D project for evaluating the process performance, and verifying the development technology and the code, the developers responded that the improvement in the development technique and the code, and upgrade of process performance level for project are more than 10%.

Study on Project Management Method of Naval Ship Building in Monetary Fluctuations (금융환경 변동 하에서 실적가치 기법에 의한 함정건조사업 관리 방안 연구)

  • Kim, Hyung-Man;Seo, Guan-Hee;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.42 no.5 s.143
    • /
    • pp.542-549
    • /
    • 2005
  • Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.

Proposal for Improvement on the Task of Construction Project Management Service(CM) for the Customized Service Project of the Public Procurement Service (조달청 맞춤형서비스 사업에 대한 '감독 권한대행 등 건설사업관리용역(CM)' 과업내용 개선방향)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.3-11
    • /
    • 2021
  • The construction project manager must clearly carry out the activities of each construction stage specified in the 'Task Description'. In this study, 'design change' and 'completion process' were classified as core tasks in consideration of the frequency and importance of tasks. And, by analyzing the actual construction project, the task contents for the core work were standardized. This laid the foundation for the ordering office, construction project management technicians, and builders to clearly understand the business areas of construction project management and fulfill their responsibilities for their respective tasks.

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.