• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.029 seconds

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

A Coop Project-based Business Engineers' Model for Regional Universities Running ABEEK Program (공학인증제도를 운영하는 지방대학의 산학협력 모델에 관한 연구)

  • Yim, Kang-Bin;Cho, Dae-Chul;Lee, Hae-Kag
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.3 no.1
    • /
    • pp.110-118
    • /
    • 2011
  • This paper suggests a realistic, business engineers' model based on Coop projects run by regional universities or colleges, in which students must meet the guidelines for engineering design that ABEEK requires. Many of current activities such as Coop programs and Internships aimed for engineering majored-undergraduates have notled them either to a satisfactory level of business skill at entrepreneur side, or to their higher chance of employment opportunities. Under the circumstances like this, we need a revised version of Coop activities: for example, launching a project that will be fully supported intrust by both sides, and thus improving students' business skill while they are working on that project. We demonstrate in this study how students have greatly improved their business skill through a model project that was planned by a working group, was successfully carried out on real job positions, and many of the students in the working group were job-offered finally as this new model suggested.

  • PDF

A Development Methodology for Quality Assurance System in Large-Scale Software Development Project (대규모 소프트웨어 개발 사업에서의 품질 보증을 위한 개발방법론)

  • 윤석환;박지은;신용백
    • Journal of Korean Society for Quality Management
    • /
    • v.25 no.1
    • /
    • pp.142-155
    • /
    • 1997
  • To successfully carry out large scale research projects while su, pp.rting quality assurance of research output, effective and systematic management through utilization of resources such as manpower, time and cost as well as engineering techniques such as component technology and design methodology is required. It is necessary to establish development methodology to su, pp.rt quality assurance. The development methodology covers the contents and procedures of the project, such as division of the project into independently executable units, allocation of resources including researchers, component technology, related know-how and equipment, deployment of research units and integration of the project at the end. In this paper we present systematic development methodology for quality assurance in large scale software development projects by analyzing the contents of the methodology a, pp.ied to the Gigabit Information-processing And Networking Technology development project(GIALT).

  • PDF

The problem of using BIM data for facility management (시설물 유지관리를 위한 BIM데이터 전달의 문제점)

  • An, Hyo-Kyung;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF

Home - Visiting Physical Therapy (가정 방문 물리치료)

  • Lee Han-Suk;Park Don-Mork;Kim Choung-Sik
    • The Journal of Korean Physical Therapy
    • /
    • v.8 no.1
    • /
    • pp.91-98
    • /
    • 1996
  • It is urgent to introduce home visiting physical therapy in order to prevent the unnecessary increase of demand and extravagance for the nation-wide execution of medical insurance and for the medical demand and supply of medical delivery system. We think that it is very important for us, as a physical therapist preparing 21 centry, to clearly undersand the necessity of home visiting physical therapy, which will be needed as the new therapeutic field in the future. When the terms for a new health and medical system, that is, useful trained-manpower, well-equipped facilities, financial and legal support, well-prepared design for this project, positive cooperation between people involved in this project and rational development of the project is held and this project is settled by sieving tile expected problems, this project will give a contribution to the promotion of national health and social welfare

  • PDF

Collaboration Management Architecture of construction process for Decision Support based on PLM (Project Life-cycle Management) (PLM 기반의 건설프로세스 의사결정을 위한 협업관리체계 개발)

  • Lim, Hyoung-Chul;Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Lee, Kwang-Myung;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.165-169
    • /
    • 2007
  • In order to develop VirtuAlmighty system, CPDM (construction project data management) and CPLM (construction project lifecycle management) model must be settled beforehand. Because most of information systems based on 3D-Design have its own database and business process. So, our team will develop collaboration management architecture of construction process for Decision Support based on PLM (Project Life-cycle Management). This architecture with business processes and Database can be used in process develop, process monitoring with many stakeholders of project, process change management, and so on.

  • PDF

Critical Environmental Management Factor by Project Participants for Considering Work Importance and Difficulty (업무 중요도-난이도를 고려한 프로젝트 참여주체별 핵심 환경관리 항목 도출)

  • Hong, Suk-Kyoo;Kim, Chang-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.214-215
    • /
    • 2013
  • Recently, Construction industry has been trying to reduce environmental impacts reflecting the global trend 'Green Growth'. However most of previous studies focused on operation & maintenance phases and do not have been approached construction phases. In addition, environmental management factors by project participants are assessed with only weight of factors, overlooking these work difficulty. Therefore This study aims to deducted the critical environmental management factors by project participants considering work difficulty in plan, design and construction phase. The basis data is collected through literature reviews and interview targeting each project participant and analyze these data using importance-difficulty analysis(IDA).

  • PDF

AN OVERVIEW OF THE FINDINGS OF THE Combustion Behaviour of Upholstered Furniture PROJECT

  • Grayson, Stephen J;Sundstrom, Bjorn;Van Hees, Patrick
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 1997.11a
    • /
    • pp.93-103
    • /
    • 1997
  • This paper gives an overview of the CBUF project. The work described is the collective effort of 11 CBUF partners, laboratories, universities, industries, in 8 countries. It became possible to do this research thanks to the European Commission interest in the burning behaviour of upholstered furniture and their willingness to sponsor this large effort. The opportunity to work with the many of the most prominent fire researchers and furniture experts have been extremely rewarding. All the expertise of these scientists have resulted in a lot of research results that are presented. The article only gives the main findings and conclusions of the project, namely the presentation of the fire safety design procedure of the CBUF project. Other articles will deal with specific modelling topics and an extensive description of the project can be found in the final CBUF report EUR 16477 EN.

  • PDF

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

PRELIMINARY PROJECT OF WATER SUPPLY FOR NDATA FARM, MALAWA

  • Min-Shun Lee;Hung-Kwai Chen;Sheng Liang;Ho-Shong Hou
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1615-1617
    • /
    • 2009
  • The water resources project of 320 Ha second stage reclamation, in which including an University City, out of 800 Ha Ndata Farm, Malawa, had been under studied in this research. The challenge of C value of runoff coefficient was obtained as 0.8, by introducing the attenuation factors method, proposed by second author, an IDF dimensionless method customary used in Taiwan, proposed by the third author, is translated further to solve the project design rainfall; Rational Method, thus, obtains 11.5 CMS as the 5 year recurrence storage. The final job, completed by the third author's on-site performance, includs field alignments and discussions with the trustee, Malawa President H. E. Dr. Bingu Wa Mutharika, when a special concern of anti-theft. In order to provide sufficient supply up to an amount of 44,000 M3 during April to November, the sketch package includes 6 measurements: one water barrage, one sluice gate, one intake, one sediment reservoir, one water reservoir, and 3199 Km long gravity-driving hydraulic pipe.

  • PDF