• Title/Summary/Keyword: Design project

Search Result 4,024, Processing Time 0.027 seconds

Tae-Baek Natural History Museum Project (태백 고생대 박물관 계획)

  • Lee, Moo-Sang
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2007.05a
    • /
    • pp.75-76
    • /
    • 2007
  • Recently with increasing interest in the natural science history education, a lot of natural science museums have been developed in various locations. This project is located in one of the biggest Paleozoic site, Taebak Kangwon-do. This kind museum has had important rolls in terms of education for student, destination for traveling and reservation of important holdover of the old ages. To do those kind of parts, this project has been designed with concepts and themes like; i. being organized with story telling structure with theme "secret of life and earth from Taebak" ii. combining experiences between outdoor experimental search for the real fossils and indoor educational interactions with real size model and moving films. iii. designing with strong identities of Paleozoic era. For the design identities the outer appearance was designed with motive of trilbites in an abstract way and inside was finished with exposed concrete and various size of moving films projected to walls and floor to emphasize real scale experience of the old ages.

  • PDF

A Study on School Facilities Build Transfer Lease Project - Centering on the improvement of the assessment - (학교시설 임대형민자사업의 평가기준 개선연구)

  • Kwon, Byoung-Koo;Lee, Jae-Rim;Jo, Jin-Il
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.7 no.2
    • /
    • pp.30-46
    • /
    • 2008
  • In this study, were prepared after statistical analysis was conducted of assessment items and marks distribution for the selection of executors of the BTL project. When tests of the degree of dispersion and degree of appropriateness for each assessment item were analyzed, it was found that the degree of dispersion among assessment points has the power of discrimination since it is highly marked in the design field and operation management field. In contrast, 'business management plan' and 'investment composition for economic quality assessment' have a low level of the power of discrimination since points given to them have smaller difference between business projects.

  • PDF

Preliminary study on the Review Project Viability to Rahmen Structure (라멘조 공법의 사업성 검토에 관한 기초연구)

  • Lee, Sung-Ho;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.139-140
    • /
    • 2011
  • The government encourages adoption of Rahmen structure design to ensure efficient management of national resources. However, in comparison with bearing-wall structure, Rahmen structure requires higher unit construction cost and present challenges in terms of securing adequate floor area ratio and floor height. That is why project clients have been disinterested in adoption of Rahmen structure design. Therefore, we have attempted to find factors having influence on decline of project viability for Rahmen structure. This study will be utilized as a basic reference study for promotion of Green Frame design which is a composite PC structure already developed.

  • PDF

A Case Study on Design of Educational Facility Appling BIM(Building Information Model) based Collaboration Process (BIM(Building Information Model) 기반의 협업프로세스를 적용한 교육시설 설계에 관한 사례연구)

  • Lee, Sang-Heon;Jang, Won-Jun;Jun, Han-Jong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.15 no.6
    • /
    • pp.39-46
    • /
    • 2008
  • The main purpose of this study is to find out the strengths and weaknesses of the application of BIM to the educational facilities. All the data information is drawn from the integrated design process which links various fields such as energy simulation, structure analyzation, and etc, and it is applied to the project combined as one data set. Moreover, we analyze the possible problems of the data exchange that can happen as collaborating with various fields while working on the project, and we present its solutions and the futher studies on this matter of a project.

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

A Study on the Review Methods of Design Errors in Construction Phase of BIM Project (BIM 프로젝트 시공단계의 설계오류 검토 방안에 관한 연구)

  • Lee, Se-Ip;Sim, Un-Jun;Ahn, Young-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.25-27
    • /
    • 2012
  • The domestic construction industry recognize that review of design and construct-ability has the devastating effects. The way to take advantage of BIM for increase the possibility of discovered the design errors in advance are being discussed a lot recently. Since 2012, Public procurement published that the Turn-key project which is the more than 50 billion won in construction have to let the BIM-based design be mandatory. However, people expected the advent of BIM technology can resolve the existing design errors. But the situation is the connection of design stage and construction stage is very insufficient in domestic. Therefore, in this study understanding the types of design errors in construction phase. according the review of design errors before construction. Then can acceleration the application of BIM to improve the workability in a construction site.

  • PDF

The Current Conditions of the Operational Process of Public Design Project (공공디자인사업 수행 프로세스 현황연구)

  • Park, Su-Kyoung;Moon, Jeong-Min
    • Korean Institute of Interior Design Journal
    • /
    • v.22 no.6
    • /
    • pp.173-180
    • /
    • 2013
  • As a way to raise the brand value of each area and activate local industries, public design projects have been competitively made. Meanwhile, public design has the characteristics of having an uncertain number of users, people with different interests, and management of the design by an administrative organization. Such characteristics may be obstacles to the results of public design and finally can cause many problems in a project's results. However, although most local governments have executed public design projects, systematic research for them and organized execution of the projects has been insufficient. For successful realization, proper organization, and consistent public design, research on a strategic design process is needed. Therefore, this study investigated the current status of public design projects to understand problems in the design process and solve them. The results are presented as follows: First, the design process for public spaces has a dual structure including a specialized process of design development in its execution and management and the execution process in the planning state is unsatisfactory and the process of designer selection is not consistent. Second, as a result of investigating the current status of the design process for public spaces, it was deduced that as most of the projects have been subjectively and temporarily managed by wholly charged organizations without specialized consultation or investigation with different related departments, there have been diverse problems in securing design quality. Third, as a result of analysing the specific execution processes carefully, it was suggested that problems in the process can be solved by decisions through consultation and discussion. As well supportive consultation systems should be used actively.

Application of Partnering to Design VE to Public Design-Build Projects (공공부문 일괄입찰사업의 설계VE 파트너링 활용방안)

  • Kim, Hae-Gon;Um, Ik-Jun;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.110-118
    • /
    • 2006
  • Current design-build contract is the type of joint venture, but performs by separate party which causes change orders due to the lack of communication between design and construction, so it cannot lead the main object which is the integration of design and construction. Furthermore, the current design-build contract is impossible to reduce the project costs by VE at the design development phase because the design proceeds with the fixed price through bidding. Like these limitless, the analysis results of the case of VE in the design-build projects, several problems that are prevented from active design VE are elicited by the project participants. Meanwhile, Ministry of Construction & Transportation decided to enlarge the VE review system lately. Therefore, in this study, it presented model of design VE partnering of design-build and partnering agreements form to apply design VE and to try to be able to lead the design VE to be more successful in public design-build projects.

Development of a Heuristic Algorithm Based on Simulated Annealing for Time-Resource Tradeoffs in Project Scheduling Problems (시간-자원 트레이드오프 프로젝트 스케줄링 문제 해결을 위한 시뮬레이티드 어닐링 기반 휴리스틱 알고리즘 개발)

  • Kim, Geon-A;Seo, Yoon-Ho
    • The Journal of Information Systems
    • /
    • v.28 no.4
    • /
    • pp.175-197
    • /
    • 2019
  • Purpose This study develops a heuristic algorithm to solve the time-resource tradeoffs in project scheduling problems with a real basis. Design/methodology/approach Resource constrained project scheduling problem with time-resource tradeoff is well-known as one of the NP-hard problems. Previous researchers have proposed heuristic that minimize Makespan of project scheduling by deriving optimal combinations from finite combinations of time and resource. We studied to solve project scheduling problems by deriving optimal values from infinite combinations. Findings We developed heuristic algorithm named Push Algorithm that derives optimal combinations from infinite combinations of time and resources. Developed heuristic algorithm based on simulated annealing shows better improved results than genetic algorithm and further research suggestion was discussed as a project scheduling problem with multiple resources of real numbers.

Challenges in Structural Design of W-Project

  • Kim, Jong Soo
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.199-204
    • /
    • 2014
  • W-Project is 70-story mixed-use residential building complex project in Busan, the second biggest city in South Korea. As it is a high rise building complex located at the coast, the residents have great ocean view from the height. Though, there were many difficult challenges to be solved to secure structural safety and meet the serviceability requirements. As it is located on the reclaimed land, securing the foundation bearing capacity on soft soil is the first issue to be solved for the stable structure. W-Project. Busan on the way usual track of typhoon, wind load on structure is also critical for structural safety and serviceability for occupants due to wind vibration. This paper will address process of lateral load resisting structural system of W-Project.