• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.036 seconds

A Possibility for Multilateral CDM Projects in Northeast Asia - The reduction effect in transaction cost by Korean participation - (동북아시아지역의 다국 간 CDM프로젝트에 대한 검토 -한국 참가에 따른 거래비용 삭감효과-)

  • Jung, Woo-Jong;Nakano, Satoshi
    • Journal of Environmental Policy
    • /
    • v.2 no.2
    • /
    • pp.41-63
    • /
    • 2003
  • CDM(Clean Development Mechanism) project is said to be a mechanism, which profits both the investing country and the host country, while additionally contributing to the reduction of greenhouse gases of the earth as a whole. However in reality, most of the proposed projects do not end up in agreement because of the problems related to differences in recognition between the investing country and the host country of the CDM project. This outlines the background for this research which proposes a new design of institutional arrangements of CDM projects in the Northeast Asian region, mainly Japan, China and Korea. In addition, we investigate the feasibility of the proposed design. The research firstly focuses on the reduction in transaction costs that the participation of Korea will have on a Japan-China CDM project. This paper further emphasizes the potential gains that would materialize if a CDM project involved the whole Northeast Asian region, and not only one country. Our research suggests that an approximate reduction of 23% in transaction costs, and about 4% reduction in the total costs of a CDM project can be expected to follow the Korean participation. In addition to decreasing costs we find that a Korean involvement in a CDM project with Japan will lead to efficiency gains illustrated by a higher increase in the IRR(Internal rate of return) in a Japan-Korea project(11.45% to 12.21%) compared to an IRR incresement of 10.57% to 11.27% for a pure Japanese CDM project. Similar results of a rise in the IRR is found for the whole investment period of 20 years. We can hence conclude that Korean participation in a Japan-China CDM project would improve the implementation possibilities of CDM project in the Northeast Asia region.

  • PDF

A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

A Case Study for Manufacturing Information System Design in Make-to-Order Production (수주생산방식에서 생산정보시스템 설계방법에 관한 사례연구)

  • Seo, Jun-Yong;Kim, Jae-Gyun;Koh, Jae-Moon
    • IE interfaces
    • /
    • v.12 no.4
    • /
    • pp.514-531
    • /
    • 1999
  • This paper deals with the design of the manufacturing information system which is able to respond rapidly to various requirements of customers in make-to-order environment. The system is required to maintain a consistent flow of information from the start to the end. For this, we adopt an approach based on Information Engineering (IE) methodology, which consists of four stages: planning, analysis, basic design, and detail design. The first is a planing stage which establishes a project goal and organizes a project team. In the second stage, current activities are analyzed and problems are defined. The basic design is accomplished in the third stage, where a project scope is defined and an overall feature of the new system is presented. And then, in the last stage, the operation plan of each subsystem is drawn up in detail and all subsystems are integrated. This study applies the methodology to the case of H company and focuses on designing forms which are easy-to-write, easy-to-understand, and field-oriented. These forms are interrelated and can be used for systematic analysis and design. By applying them to the system design, we have obtained effect of reducing cost and time.

  • PDF

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

Design of a Sanction System for Six Sigma Project (식스 시그마 프로젝트를 위한 결재 시스템 설계)

  • Kang, Dae-Ki;Chang, Won-Tae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.4
    • /
    • pp.868-874
    • /
    • 2010
  • In this paper, we propose a design of automated electronic sanction system for management of six sigma projects. The proposed system performs diverse operations such as registering and choosing enterprise-wide enhancement project, managing schedules of the project, verifying the validity of the project, and thus managing the whole life cycle of the project. Each six sigma project is stored in the database repository for facilitation of its later use. The proposed system has been effectively applied in a Korean company, and thus, through the proposed system, we expect the effects of innovation-related and enhancement-related activities which six sigma is fundamentally pursuing.

A Study on the Planning for Rural Village Development Projects in Korea - Focused on Gamgok Chungbuk - (농촌마을 종합개발사업의 계획방향에 관한 연구 - 충북 감곡을 중심으로 -)

  • Kim, Seong-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.7 no.3
    • /
    • pp.19-26
    • /
    • 2005
  • In this study treats 'Rural Village Development Project'. The ministry of Agriculture and Forestry and Korea Agricultural & Rural Infrastructure Corporation are enforcing this from 2004. A purpose of 'Rural Village Development Project' is as follows. Repairs a function of production farms-residing rest tourism generally after connecting a neighborhood village having the same nature in a small scale unit. Too local human resources and material resources is utilized, and develops various types with specialization. As a result, it is to improve with the quality of life of a farmer. This study finds problems to have broken out in Rural Village Development Project. Therefore, recognize whether it is on to be devoted to rural village and rural community inhabitants to solve the problem how. And analyze a policy characteristic of Rural Village Development Project and basic course. Therefore, provide with materials when decides on plan course of Rural Village Development Project through this. As a result, it is a purpose to give help to Rural Village Development Project. The results of study are follows; First, A state inhabitants, professional group, administration understand an agricultural village, and to be able to learn must be prepared first. Second, the enough time that can carry out study is necessary. Third, must present the guidebook which expresses a local characteristic well. Fourth, it is specialist database construction and network formation.

  • PDF

A Case Study on Design Classes using Blended Learning -Focused on Team Project and Smart Device App-based Learning- (혼합학습(Blended Learning)을 적용한 디자인 수업 실증사례 연구 -팀 프로젝트와 스마트디바이스 앱 기반 학습을 중심으로-)

  • Kim, Jin Hee;Kim, Hye Kyun
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.45 no.2
    • /
    • pp.271-284
    • /
    • 2021
  • This study presents the educational utility of blended learning by analyzing the effectiveness of learning after class by blending team project learning and smart device app-based learning methods. Qualitative analysis and survey analysis were conducted and the results were as follows. First, team project activities based on task resolution were conducted freely through detailed activities such as sharing roles, planning meetings, and coordinating opinions. Team activities were carried out with respect and consideration, team member bonding, and a sense of responsibility. Second, the smart device app is recognized as a medium for work and communication, and fast feedback has been made, making it highly impactful on classroom activities. Third, in terms of learning satisfaction, most learners showed an interest in the course and were satisfied with the project results. The smart device app was used as a learning and communication medium for personal and team activities and was analyzed as a blended method applicable to classes that conduct practical activities as an efficient tool to further activate project activities.

An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.264-265
    • /
    • 2017
  • This paper aims to analyze relations between design errors prevented by building information modeling (BIM)-based design validation and their impacts in order to identify critical consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to its causes and work types. The relations between causes and work types of design errors and project delay, cost overrun, low quality, and rework generation that can be caused by the errors are analyzed through conducting logistic regression. Characteristics of each design error are analyzed by conducting face-to-face interviews with practitioners in the two BIM-based projects. As the results, the impacts of design error causes on predicting project delay, cost overrun, low quality, and rework generation were the highest.

  • PDF

A Study on the Influence of SI Project Manager's Leadership Competencies and Project Participants' Individual Competencies on Project Performance (SI 프로젝트 관리자의 리더십 역량과 프로젝트 참여자 개인역량이 프로젝트 성과에 미치는 영향에 관한 연구)

  • Lee, Joong-Woo;Lee, Cheol-Gyu
    • Journal of Information Technology Services
    • /
    • v.21 no.4
    • /
    • pp.27-61
    • /
    • 2022
  • In order to improve project performance by analyzing the effects of the project manager's leadership competency and the individual competency of the project participants on the project performance, this study examines the effect. In this study, a research model and hypothesis were established to understand the causal relationship between leadership competency, individual competency, and project performance, and a survey was conducted based on this. Overall, it was found that the leadership competency of the project manager and the individual competency of the project participants had a positive effect on the project management performance, the project leadership competency had a positive effect on the completion performance, and the project participant individual competency had a negative effect on the completion performance. As a result of analyzing the effect of the project manager's core competency on the project management performance according to the amount or period of the project type, which is the moderating variable, it was found that there was no moderating effect on the management performance. For the success of the SI project, it is most important to understand the project characteristics well and select a PM suitable for the characteristics, and methods for nurturing excellent project managers should be further studied. In addition, it is expected that it will be possible to identify the effect of project manager leadership competency and participant competency on project performance based on sophisticated research design for more competent PM selection.

A Study on the Development of Project Management Information System for Mega Project (대형 건설사업에서의 사업관리정보시스템 구축에 관한 연구)

  • 윤은상;이화기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.50
    • /
    • pp.243-255
    • /
    • 1999
  • A mega project such as an international airport construction generally consists of a number of sub-projects. Successful completion of this mega project requires project management information system(PMIS) because control and link of a number of component sub-projects is inevitable. Therefore, the role of PMIS should be more emphasized as the project is processed and managed by fast track concept where the design and construction work is performed concurrently. This study investigates and analyzes the present PMIS developed for the construction project of Inchon International airport. Based on this study, we can suggest the direction of PMIS for a mega project management and how to improve this kind of management information system.

  • PDF