• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.032 seconds

A Study on the Definition Method for Integrated Development Project using QFD (QFD를 활용한 통합된 개발프로젝트 정의 방법 연구)

  • Kim, Jin Hoon;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.63-75
    • /
    • 2012
  • For the definition of development project, this paper proposes an integrated design model for the project 3P's(Products, Process, and People) architecture solutions balancing the originating requirements as well as the design targets of product, process, and IPDT. The model is suggested to develop the integrated design method with trade-off analysis and alternatives evaluation of products, processes, and IPDT using QFD.

A Case Study of Six Sigma R&D Improvement Projects: Design Optimization of Inner Shield Omega CPT

  • Park, Sung H.;Park, Young H.
    • International Journal of Quality Innovation
    • /
    • v.5 no.2
    • /
    • pp.63-69
    • /
    • 2004
  • This is an R&D project on design optimization of the inner shield of the Omega color picture tube at Samsung SDI in Korea. This was an R&D project which basically used the IDOV (Identify, Design, Optimize, Validate) process for Six Sigma implementation. Most Six Sgima projects use the process of DMAIC (Define, Measure, Analyze, Improve, Control). However, this project introduces a new cycle, RDIDOV (Recognize, Define, and IDOV). Here CPT means Color Picture Tube. Sam sung SDI is one of the two companies which began Six Sigma in Korea. This case study shows a good example how an R&D Six Sigma project can be usefully employed in manufacturing companies using a new process cycle.

Application of Systems Engineering in SURION R&D Project (수리온 체계개발에서의 시스템엔지니어링 적용사례)

  • Kim, Jin Hoon;Rhee, Dong Wook
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.1
    • /
    • pp.81-86
    • /
    • 2014
  • Systems Engineering application focused on requirement definition and management for SURION System Development Project is described in this paper. To perform the development process effectively based on systems engineering processes; Requirements Definition, Design Review, Configuration Management, Quality Assurance, Data Management, are applied in this project. In this processes, the Stakeholder's Requirements are transferred to Specifications verified with design reviews, prototyping inspections, and integration tests. All engineering data, especially verification plan & results are recorded, and traced to each requirements of system specification in Surion database. Therefore, it could be assured that all requirements of specification are evaluated and verified successfully in Surion Project.

A Study on User Centered Design Process of Virtual Reality Contents (가상현실 컨텐츠의 사용자 중심 디자인 방법론에 관한 연구)

  • 이현진
    • Archives of design research
    • /
    • v.16 no.3
    • /
    • pp.191-200
    • /
    • 2003
  • This paper summarizes the characters of virtual reality contents and its design problems, and suggests user centered approach in design methodology of VR contents. Based on case study of former VR contents design project, I developed a new VR contents design process in experience design perspective. This design process was applied on Tangible Space Initiative project of KIST, which showed positive roles of this design process as a dear communication media between project players, and an active generator of user-centered interaction design.

  • PDF

Axiomatic design study for automatic ship-to-ship mooring system for container operations in open sea

  • Kim, Yong Yook;Choi, Kook-Jin;Chung, Hyun;Lee, Phill-Seung
    • Ocean Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.157-169
    • /
    • 2011
  • To provide more rational design solutions at conceptual design level, axiomatic design method has been applied to solve critical part of a new engineering problem called Mobile Harbor. In the implementation, the Mobile Harbor, a functional harbor system that consists of a vessel with container crane approaches to a container ship anchored in the open sea and establishes a secure mooring between the two vessels to carry out loading and unloading of containers. For this moving harbor system to be able to operate successfully, a reliable and safe strategy to moor and maintain constant distance between the two vessels in winds and waves is required. The design process of automatic ship-to-ship mooring system to satisfy the requirements of establishing and maintaining secure mooring has been managed using axiomatic design principles. Properly defining and disseminating Functional Requirements, clarifying interface requirements between its subsystems, and identifying potential conflict, i.e. functional coupling, at the earliest stage of design as much as possible are all part of what need to be managed in a system design project. In this paper, we discuss the automatic docking system design project under the umbrella of KAIST mobile harbor project to illustrate how the Axiomatic Design process can facilitate design projects for a large and complex engineering system. The solidified design is presented as a result.

Haptic Design of a Wearable Wrist Massage Device as a Capstone Design Project of Designeer Education Program (디자이니어 양성 커리큘럼 내 융합설계프로젝트 사례: 웨어러블 손목 마사지 기기의 햅틱 디자인)

  • Lim, Dokshin;Kwon, Kyunghyun
    • Journal of Engineering Education Research
    • /
    • v.23 no.2
    • /
    • pp.43-48
    • /
    • 2020
  • This paper deals with a Capstone Design project which is a wearable haptic wrist massage device design carried out within the 'Designeer' education program. Following design thinking process is recommended throughout a year in order to ensure a desirable, feasible and viable product. Dealing with a real problem of the field requires open-minded and flexible attitudes both from students and professors. Integrating design in an engineering project does not mean always making better looking product. User experience design allows wider opportunity to engineers to deal with design. A case study of developing a wearable wrist massage device shown in this paper demonstrate haptic design and how haptic properties can be optimized to offer best user experience of hand massaging. This study identified that starting lateral pressure movements from the center in larger area using air tubes gives better feeling as self-massage using wrist wearing devices.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

A Study of Game Project Curriculum for Integrated Subject (통합교과로서의 게임 프로젝트 교육과정 운영방안 탐구)

  • Choi, Seung-Kwan
    • Journal of Korea Game Society
    • /
    • v.16 no.5
    • /
    • pp.111-122
    • /
    • 2016
  • The purpose of this study is to suggest an curriculum model of teaching scheme which performs team project learning based on Integrated project with different fields. To address this goal, the present study suggests a practical game project model under the same game-making circumstances as game industry by consisting of real case of convergence parts(game graphic, game design, game program). This project-based learning case has been conducting Integrated project education since 2008 in A educational Institute in Korea. The results of study suggest a standard of Integrated-based curriculum model and it is constructed with two parts. The first part is what students learned during project processing, such as responsibility, communication. The other part is how to construct the educational environment for integrated project. It explains how to organize and build teams, plan of integrated project, rule the role of team task, perform collaborative task, present interim/final presentation, evaluate grade. This study is expected to be utilized as a framework for the instructional design and the guideline for improving learner competency in team project learning.

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF