A Study on the Requirement Information Management Model and Process Linked to Space Planning in the Early Design Stage

  • Jae Ho, Cho;Sang Woo, Kim;Bo Sik, Son;Jae Youl, Chun
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.566-569
    • /
    • 2013
  • The purpose of this research is to develop the technology to meet the requirements of the design content, and to build a 'Requirement Information Management Model' for the design project. The model that should be used in the early design stage will undergo the following process: First, basic requirements would be defined by extracting the design content in the form of a reusable library of space units. At the next stage, requirement information should be modified after considering unique characteristics for the project and conflict problems between function and performance.

  • PDF

주민참여와 농촌 마을만들기 사업성과의 관계에서 거버넌스의 매개효과 실증분석 - 제주 웃뜨르권역 사례를 중심으로 - (An Empirical Study of the Mediating Effect of Governance in Relationship between Resident Participation and Rural Community Design Project Performance - Focused on the Case of Utturu Village -)

  • 강기호;이진희
    • 농촌계획
    • /
    • 제21권1호
    • /
    • pp.103-115
    • /
    • 2015
  • As rural development projects, mostly carried out in a top-down development method in the past came to take a bottom-up development method in earnest, entering the 2000s, resident participation became an essential element of a rural community design project, to the extent that it can influence the success or failure of a rural community design project. It is taken for granted that rural residents independently participate in community design projects, but as they are accustomed to various subsidy projects carried out by the government and become increasingly aging, it is not easy to induce their spontaneous participation in farming areas with such problems. Especially, to prevent the distrust between administrative agencies and residents from serving as an obstacle in the residents' spontaneous participation, it is necessary to construct horizontal governance among the village residents, administrative agencies and the group of experts supporting for the project. This study attempted to verify the mediating effect of governance in the relationship between resident participation and the performance of the rural community design project based on this problem recognition, and for this purpose, the results of a survey with residents in Utturu Village, Hangyeong-myeon, Jeju-si, which was completed by carrying out a comprehensive rural development project, the typical bottom-up community design project was used for an empirical analysis. The results of the study can provide implications for setting directions, establishing strategies and constructing governance of rural community design projects in the future, and especially, it can be said that this study has academic significance in that governance is recognized as an important variable related to the project performance.

Action to Improve the Reliability of Production Planning

  • Kim Daeyoung
    • 한국건설관리학회논문집
    • /
    • 제3권4호
    • /
    • pp.139-144
    • /
    • 2002
  • Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.

건축 기획 지원 시뮬레이션 시스템 개발에 관한 기초 연구 (A Basic Study on the Development of Simulation Systems for Supporting the Pre-design Phase of Construction Projects)

  • 민경민;함남혁;김주형;김재준
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.176-181
    • /
    • 2007
  • The widespread of IT technology caused a remarkable change in many industries and the construction industry is also one of them being influenced in the form of CIC(Computer Integrated Construction) and BIM(Building Information Modeling). Construction projects have many participants from various disciplines involved throughout the entire process. Therefore the success of the project greatly depend on the efficiency of decision-making using the information generated from each process stage. Looking from this aspect, the greatest potential value lies in the planning and pre-design stage when considering the construction life cycle. In this paper, we propose a project on developing a 3D object oriented simulation system for supporting the pre design phase. We define the needs for such system through previous case studies and suggest a to be process model. Finally we anticipate the effects that the project will eventually contribute to the construction industry.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안 (Data-driven Interactive Planning Methodology for EPC Plant Projects)

  • 왕한겸;최재현
    • 한국건설관리학회논문집
    • /
    • 제20권2호
    • /
    • pp.95-104
    • /
    • 2019
  • EPC 플랜트 프로젝트는 규모와 복잡성 측면에서 시공 이전 단계의 계획 업무가 프로젝트 성패에 큰 영향을 미치기 때문에 프로젝트에 참여하는 주체간의 긴밀한 협력과 의사소통이 필수적이다. 본 연구는 이러한 필요성을 기반으로 플랜트 프로젝트에서 자산데이터를 활용하여 공정계획의 요소정보를 추출하고, 이를 패키지로 구성하여 초기 공정계획을 수행하는 방법론을 상호계획 (IAP, Interactive Planning)의 개념을 통해 제시한다. 프로젝트 초기단계에서 효과적인 IAP를 수행하기 위하여 자산 데이터로부터 공정요소정보를 추출하고 작업 패키지 단위의 공정 계획을 작성하며 작성된 공정계획을 평가하는 세 가지 단계를 제시하였으며 이를 샘플 프로젝트 사례에 적용하였다. 제시된 IAP 방법론을 통해 자산 데이터 활용성 증진과 공정 리스크 사전식별 및 대응책 개발을 도모할 수 있으며 이는 프로젝트를 성공적으로 완료하기 위한 공정 전략 수립의 기반이 될 수 있다.

조경계획.설계 기술용역의 수행실태에 관한 조사연구 (A Study on the Practices of Landscape Planning & Design Services in Korea)

  • 권오준;심경구;김유일;고동완
    • 한국조경학회지
    • /
    • 제21권4호
    • /
    • pp.113-129
    • /
    • 1994
  • This study is designed to analyze the trends of professional services in Landscape Architecture during the past 5 years(1987-1991) in Korea. The data were collected from 1,117 projects from 56 engineering and landscape architecture firms. The findings are summarized as follows: 1) The projects have been increased annually by 19 percent in numbers and by 47 percent in money terms. 2) The main sources of projects are local governments and corporations. However the private sector comprise 31 percent in projects number and 46 percent in money terms. 3) The public park and tourism site development comprise a half of the projects. Recently recreational forest, golf, amusement and large housing site development have increased very rapidly. 4) In terms of workscope they are devided by 'complex' project which include extensive engineering works and 'simple' project which contain mostly planting design. The former include receational project with average 5 or 6 months contract period, and the later include housing and building site design with 2 or 3 months period. 5) Two types of consulting firms are typical. One is comprehensive engineering firms with urban planning section and few landscape section. The other is specialized professional firms with urban planning or landscape architecture. 50 percent of the project was done by comhensive engineering firms and 60 percent was done by urban planning section. The implication of these findings are broad: Firstly, We have to meet the demands in private secter mostly in recreation and leisure related projects. Secondly, landscape architects and project managers need more professional skills and coordination ability to deal with 'complex' projects. Thirdly, to enhance the quality of professional services it is required to have enough work time and higher service fee through legal and institutional enforcements.

  • PDF

개발 프로젝트의 기술관리 계획 프로세스 (Technical Management Planning Process of Engineering Project)

  • 유일상;박영원
    • 시스템엔지니어링학술지
    • /
    • 제1권2호
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

마을 만들기 연구의 정량적 접근에 관한 소고 - 마을 만들기 사업규모와 성과의 관계를 중심으로 - (A Note on the Quantitative Approach to the Study of Community Design - Focused on the Relationship between Project Scale and Outcomes -)

  • 김동윤;김선직;강래천
    • 한국디지털건축인테리어학회논문집
    • /
    • 제11권2호
    • /
    • pp.41-50
    • /
    • 2011
  • Skeptical responses to urban design based on the Physical Planning theory assuming the existence of social agreement and the absolute authorities of planners bring about alternatives such as Participatory Planning and Community Design derived from Harbermas' Communicative Rationality. But the normative contentions do not progress any more to the stage of presenting practical strategies. This is the cause why there should be systematic approaches to reveal the relationships among various concepts or variables. With regard to the Community Design this study intends to take a statistical approach to find relationship between project scale and its accomplishment. The hypothesis that the smaller scale of project begets the better outcomes was tested to be rejected as a result of the analysis of variance. But the result also shows that appropriate density in relatively large area makes residents' expected satisfaction high. Although this discovery has its own meaning the tryout is anticipated to laying the cornerstone of quantitative analyses in the following studies.

원자력연구개발사업의 공정관리 적용 사례 연구 (A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project)

  • 한도희
    • 기술혁신학회지
    • /
    • 제2권3호
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF