• 제목/요약/키워드: Design Flood Estimation

검색결과 117건 처리시간 0.028초

소하천 설계홍수량 추정모형의 적용성 검토 (Study on Applicability of Design Flood Estimation Methods in Creeks)

  • 김양수;이병주;이준호
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2004년도 학술발표회
    • /
    • pp.163-167
    • /
    • 2004
  • Creeks, defined by creek's improvement law, have strong localities in the flow characteristics and environmental condition. During the recent ten-years, lots of flood damages have occurred rather in the creeks. However, quantity and stream design information are poor while the national-class and local-class streams have sufficient. This causes a problem on improving the safety from flood. This study focuses on assessment of practical applicability for design flood estimation models. For this, Rational formula, Clark's model and Nakayath synthetic unit hydrograph method are estimated by data of the creek comprehensive improvement plan report, etc.

  • PDF

유역특성을 이용한 설계홍수량 추정 (Design Flood Estimation by Basin Characteristics)

  • 박기범;김교식;한주헌;배상수
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.1172-1175
    • /
    • 2006
  • 설계홍수량의 산정에 있어 일반적으로 유역의 강우와 수위자료, 유출량 자료를 이용하여 강우-유출모형을 이용하여 산정하는 방법을 사용한다. 설계홍수량을 산정하는 데 있어 수문자료의 부족으로 인하여 유역에 대한 대표단위도의 결정이 어려워 유역에 대한 지형특성 자료들을 이용하여 추정된 변수들을 이용하여 모형에 적용시켜 산정하고 있다. 모형을 이용하여 설계홍수량의 산정을 하는 것에 있어 각각의 모형의 입력변수들이 지형인자로 인해 산정되는것이나 기왕에 산정된 설계홍수량 자료들이 근본적인 자료인 유역의 특성인자와 어떠한 관계를 가지며 미계측 유역이나 하천정비기본계획이 수립되지 않은 유역에 있어 설계홍수량을 추정하는 데 있어 상당한 어려움이 있는 것이 현실이다. 본 연구에서는 설계홍수량을 추정하는 데 있어 기왕에 하천정비 기본계획에 의해 산정된 설계홍수량과 지형인자들이 어떤 상관성을 가지고 있는 가에 대하여 분석하여 지형특성자료와 확률강우량 자료를 이용한 설계홍수량 추정방안에 대하여 연구하였다.

  • PDF

지형학적 인자에 따른 설계홍수량 특성에 관한 연구 (A Study of Design Flood Discharge Characteristics by Topographical Parameters)

  • 박기범;김교식;황성환;차상화
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.1182-1186
    • /
    • 2006
  • 하천유역에 있어 설계홍수량의 결정은 치수적인 측면에서 매우 중요한 일이다. 유역의 대소와 중요도에 따라서 하천의 설계홍수량이 산정이 된다. 갈수록 홍수의 피해정도가 심해지고 홍수에 대한 방어의 중요성이 더욱 가중되고 있는 현실에서 설계홍수량의 추정은 매우 중요하다고 할 수 있다. 특히 홍수량을 산정하는 데 있어 가장 큰 영향을 미치는 것은 강우량이다. 그러나 똑같은 강우량이라 할지라도 유역의 특성에 따라 산정되는 홍수량은 상이하게 된다. 유역의 특성이 홍수량의 산정에 있어 영향이 크다는 것은 선행 연구의 결과와 경험에 의하여 확인이 된 사실이다. 그러나 많은 하천들이 각각의 유역특성을 가지고 있으나 이들과 산정된 설계홍수량의 관계가 어떤 형태로 이루어져 있는 가에 대한 연구는 아직 미흡한 실정이다. 본 연구에서는 기왕에 하천정비기본계획에 의해 산정된 설계홍수량과 지형인자들이 어떤 상관성을 가지고 있는 가에 대하여 연구하여 미계측유역이나 하천계획이 수립되지 않은 중소하천 유역의 설계홍수량 추정에 있어 추가적인 정보의 제공측면에서 유역의 지형인자와 설계홍수량과의 상관성을 조사하였다.

  • PDF

감조하천 홍수위 계산의 불확실성과 저감 대안 - 임진강 하류를 대상으로 (Uncertainty of Evaluating Design Flood and Mitigation Plan at Downstream of Imjin River)

  • 백경오;권혁원
    • 한국안전학회지
    • /
    • 제33권2호
    • /
    • pp.132-137
    • /
    • 2018
  • Compared with general rivers, fluctuations of the water level and the river bed are severe in the tidal river. In hydro-dynamic aspect, such fluctuation gives different river-bed data to us according to observing period. The time-dependent river-bed data and pre-estimation of the Manning's roughness coefficient which is the key factor of numerical modelling induces uncertainty of evaluating the design flood level. Thus it is necessary to pay more attention to calculate the flood level at tidal rivers than at general rivers. In this study, downstream of the Imjin River where is affected by tide of the West Sea selected as a study site. From the numerical modelling, it was shown that the unsteady simulation gave considerable mitigation of the water level from the starting point to 15 km upstream compared to the steady simulation. Either making a detention pond or optional dredging was not effective to mitigate the flood level at Gugok - Majung region where is located in the downstream of the Imjin River. Therefore, a more sophisticated approach is required to evaluate the design flood level estimation before constructive measures adopted in general rivers when establishing the flood control plan in a tidal river.

영국의 설계홍수량 산정모형인 FEH-ReFH의 국내 남천유역 적용성 평가 (Applicability Test of UK Design Flood Estimation Model FEH-ReFH to Korean Namcheon Watershed)

  • 김상호;안소라;장철희;김성준
    • 한국지리정보학회지
    • /
    • 제16권3호
    • /
    • pp.68-80
    • /
    • 2013
  • 본 연구는 미계측유역의 설계홍수량 산정을 목적으로 영국의 강우-유출모형인 FEH-ReFH(Flood Estimation Handbook-Revitalised Flood Hydrograph)의 국내 적용성을 평가하기 위해 위천유역의 일부인 남천유역($165.12km^2$)을 대상으로 한 강우-유출 모형을 구성하는데 있다. 모형의 입력자료인 유역 및 수문특성인자를 한국 실정에 맞게 구축하기 위해 GIS기반 전처리 프로그램을 개발하였다. 모형은 남천 유역에 대하여 관측된 6개의 강우-유출 사상을 이용한 보정을 실시하여, 모형의 적용 적합성을 분석하였다. 모형의 손실율 및 단위유량도 매개변수를 대상으로 실측자료를 이용한 보정을 실시하였다. 본 연구의 결과는 기존의 설계홍수량 산정과정에 있어, 영국의 방법을 고려한 국내의 표준 설계홍수량 산정과정을 정립하는데 기여할 것으로 판단된다.

국립공원내 홍수피해 저감을 위한 미계측 산림지역의 설계홍수량 추정 (Estimation of Design Flood Runoff in Ungaged Forest Watershed to Reduce Flood Damage within the National Park)

  • 김상민;임상준;이상호;김형호;마호섭;정원옥
    • 한국농공학회논문집
    • /
    • 제51권5호
    • /
    • pp.107-113
    • /
    • 2009
  • The purpose of this study is to estimate the design flood runoff for ungaged forest watershed to reduce the flood damage in national park. Daewonsa watershed in Jirisan National Park was selected as study watershed, of which characteristic factors were obtained from GIS data. Flood runoff was simulated using SCS unit hydrograph module in HEC-HMS model. SCS Curve Number (CN) was calculated from forest type area weighted average method. Huff's time distribution of second-quartile storm of the Sancheong weather station, which is nearest from study watershed, was used for design flood runoff estimation. Critical storm duration for the study watershed was 3 hrs. Based on the critical duration, the peak runoff for each sub-watershed were simulated. It is recommended to monitor the long-term flow data for major stream stations in National Park for a better reliable peak runoff simulation results.

강우의 개념적 시간분포와 설계홍수량 산정에 관한 연구 (The Estimations of A Conceptual Time Distribution of Rainfall and Design Flood)

  • 이병운;장대원;김형수;서병하
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2005년도 학술발표회 논문집
    • /
    • pp.937-942
    • /
    • 2005
  • It is necessary to estimate the runoff hydrograph and peak flood discharge using law of probability for synthetic flood control policy and design of hydraulic structures. Rainfall analysis is needed in the process of peak flood discharge estimation and the time distribution of a design rainfall is a very important process in the analysis. In this study, we estimate design flood for a small urban basin and a rural basin of medium scale which have different travel times. The Huff method is widely used in Korea for the time distribution of design rainfall to estimate design flood. So, we use Huff method and a conceptual method which is suggested in this study for the comparative purpose. The 100-year frequency rainfall is used to estimate design flood for each basin and the design flood is compared with the existing design flood. As the result, the design flood is overestimated $14.6m^3/sec$ by Huff method and is underestimated $70.9m^3/sec$ by a conceptual method for the rural basin. For the small urban basin, the design flood is excessively overestimated $294.65m^3/sec$ by Huff method and is overestimated $173m^3/sec$ by a conceptual method. The reason of excessive overestimation by Huff method in the small urban basin is that the increased rate of rainfall intensity according to the decrease of duration is large and the duration exceeds the time of concentration when the increased rainfall intensity is concentrated in a quartile. Therefore, we suggested a conceptual method for the time distribution of design rainfall by considering the rainless period and duration. Especially, the conceptual method might be useful for the small urban basin with short concentration time which the design flood is overestimated by Huff method.

  • PDF

강우 시간분포를 고려한 설계홍수량산정 (Estimation of Design Flood Considering Time Distribution of Rainfall)

  • 박재현;안상진;함창학;최민호
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.1191-1195
    • /
    • 2006
  • Now days, heavy storm occur to be continue. It is hard to use before frequency based on flood discharge for decision that design water pocket structure. We need to estimation of frequency based on flood discharge on the important basin likely city or basin that damage caused by flood recurrence. In this paper flood discharge calculated by Clark watershed method and SCS synthetic unit hydrograph method about upside during each minute of among time distribution method of rainfall, Huff method choosing Bocheong Stream basin that is representative basin of International Hydrologic Project (IHP) about time distribution of rainfall that exert big effect at flood discharge estimate to research target basin because of and the result is as following. Relation between probability flood discharge that is calculated through frequency analysis about flood discharge data and rainfall - runoff that is calculated through outward flow model was assumed about $48.1{\sim}95.9%$ in the case of $55.8{\sim}104.0%$, SCS synthetic unit hydrograph method in case of Clark watershed method, and Clark watershed method has big value overly in case of than SCS synthetic unit hydrograph method in case of basin that see, but branch of except appeared little more similarly with frequency flood discharge that calculate using survey data. In the case of Critical duration, could know that change is big area of basin is decrescent. When decide time distribution type of rainfall, apply upside during most Huff 1-ST because heavy rain phenomenon of upsides appears by the most things during result 1-ST about observation recording of target area about Huff method to be method to use most in business, but maximum value of peak flood discharge appeared on Huff 3-RD too in the case of upside, SCS synthetic unit hydrograph method during Huff 3-RD incidental of this research and case of Clark watershed method. That is, in the case of Huff method, latitude is decide that it is decision method of reasonable design floods that calculate applying during all $1-ST{\sim}4-TH$.

  • PDF

설계홍수량 산정을 위한 단위유량도의 합성방법 개발 (Development of Syntheic Unit Hydrograph for Estimation of design Flood)

  • 이홍래;이종국;서병하
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 1989년도 수공학논총 제31권
    • /
    • pp.17-30
    • /
    • 1989
  • 본 여눅에서는 국내에 어느 정도 축적된 단시간 수문자료를 사용하여, 정확한 유역의 유출현상을 파악하고 그 대상유역의 지형인자와 유출특성을 대표하는 단위 유량도 특성변수와의 관계를 규명하여, 유출수문자료가 없는 대상유역, 즉 미 계측 유역에서 수공구조물의 설계시에 적절한 설계홍수량 산정방법을 제시하여 하천의 효과적인 치수사업을 수행하여 효율적인 수지원관리를 도모할 수 있도록 하였다.

  • PDF

설계홍수량 산정을 위한 합성단위유량도의 개발 (Development of Syntheic Unit Hydrograph for Estimation of Design Flood)

  • 이홍래;이종국;서병하
    • 물과 미래
    • /
    • 제22권4호
    • /
    • pp.423-433
    • /
    • 1989
  • 본 연구에서는 국내에 어느 정도 축적된 단시간 수문자료를 사용하여, 정확한 유역의 유출현상을 파악하고 그 대상유역의 지형인자와 유출특성을 대표하는 단위 유량도 특성변수와의 관계를 규명하여, 유출수문자료가 없는 대상유역, 즉 미 계측유역에서 수공구조물의 설계시에 적절한 설계홍수량 산정방법을 제시하여 하천의 효과적인 치수사업을 수행하여 효율적인 수자원관리를 도모할 수 있도록 하였다.

  • PDF