• 제목/요약/키워드: Design Cost

검색결과 8,469건 처리시간 0.036초

기능 분석에 따른 제품 원가 구조개선 알고리즘에 대한 연구 (The Algorithm of Improvement of Production cost using Function based cost estimating)

  • 서지한;이재명;나승훈
    • 대한안전경영과학회지
    • /
    • 제12권4호
    • /
    • pp.207-213
    • /
    • 2010
  • Now days, the marketing environment is rapidly changed. Therefore, a lot of companies try to reduce production cost. Especially, Design is a important activities in new product development. While the concepts of design for manufacturable and concurrent engineering have made significant advances in integrating the design function with other areas in the firm. There are still major gaps in timely and accurate costing information available to designers. Inappropriate design could result in high redesign cost and delay in product relation. The generation of design and improvement is a time-consuming and mentally exhaustion process. It involves combining design features to generate as many potential design as possible. As not all features combinations are feasible, decision-makers have to narrow down the potential solutions and subsequently select appropriate design for further development. This new study is composed of 3 steps aiming at the Low Cost Design of the product. The three steps are consisted that setting up the target Cost, estimating the current functional cost, the design of a unit's reviewing according to the priority of the difference between the target cost and the functional cost.

제품 설계 단계에서의 제품 원가 추정 시스템 개발 (The Development of an Product Cost Estimation System at the Product Design Stage)

  • 한관희;박찬우;이규봉;황태일;김강용
    • 한국CDE학회논문집
    • /
    • 제8권2호
    • /
    • pp.101-108
    • /
    • 2003
  • Presented in this paper is the development of an product cost estimation system at the product design stage. The efficient cost estimation function at the design stage is essential for the cost reduction activities through the entire product life cycle. For this purpose, it is necessary to establish a systematic working procedure, and to develop information system for managing a great deal of production and product-related data required for the cost estimation. The developed system has the capability of estimating a cost of assembly type products as well as unit-item type products. As proposed system is based on the variant approach, it can be used easily at an early design stage without the need for detail design information. Also, this system is integrated with legacy PDM (Product Data Management) and ERP (Enterprise Resource Planning) system for fast. accurate and easy product cost estimation. The estimated cost includes material cost, overhead cost as well as labor cost.

DTC(Design to Cost)기반의 설계단계 사업비관리 프로세스 개발 (Development of Cost Management Process during Design Phase based on Design to Cost)

  • 박소현;문현석;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.209-212
    • /
    • 2009
  • The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.

  • PDF

생애주기비용을 고려한 PSC-I형 교량의 최적설계 (Optimal Design of PSC-I Girder Bridge Considering Life Cycle Cost)

  • 박장호;신영석
    • 한국안전학회지
    • /
    • 제24권5호
    • /
    • pp.48-56
    • /
    • 2009
  • This paper presents the procedure for the optimal design of a PSC-I girder bridge considering life cycle cost (LCC). The load carrying capacity curves for the concrete deck, PSC-I girder and $\pi$-type pier were derived and used for the estimate of service lives. Total life cycle cost for the service life was calculated as sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The advanced First Order Second Moment method was used to estimate the damage cost. The optimization method was applied to the design of PSC-I girder bridge. The objective function was set to the annual cost, which is defined by dividing the total life cycle cost by the service life, and constraints were formulated on the basis of Korean Standards. The optimal design was performed for various service lives and the effects of design factors were investigated.

A CBR-BASED COST PREDICTION MODEL FOR THE DESIGN PHASE OF PUBLIC MULTI-FAMILY HOUSING CONSTRUCTION PROJECTS

  • TaeHoon Hong;ChangTaek Hyun;HyunSeok Moon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.203-211
    • /
    • 2009
  • Korean public owners who order public multi-family housing construction projects have yet to gain access to a model for predicting construction cost. For this reason, their construction cost prediction is mainly dependent upon historic data and experience. In this paper, a cost-prediction model based on Case-Based Reasoning (CBR) in the design phase of public multi-family housing construction projects was developed. The developed model can determine the total construction cost by estimating the different Building, Civil, Mechanical, Electronic and Telecommunication, and Landscaping work costs. Model validation showed an accuracy of 97.56%, confirming the model's excellent viability. The developed model can thus be used to predict the construction cost to be shouldered by public owners before the design is completed. Moreover, any change orders during the design phase can be immediately applied to the model, and various construction costs by design alternative can be verified using this model. Therefore, it is expected that public owners can exercise effective design management by using the developed cost prediction model. The use of such an effective cost prediction model can enable the owners to accurately determine in advance the construction cost and prevent increase or decrease in cost arising from the design changes in the design phase, such as change order. The model can also prevent the untoward increase in the duration of the design phase as it can effectively control unnecessary change orders.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 - (A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage -)

  • 박원호;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

교량의 생애주기비용 최적설계 (Optimal Life Cycle Cost Design of a Bridge)

  • 박장호;신영석
    • 한국안전학회지
    • /
    • 제25권6호
    • /
    • pp.115-122
    • /
    • 2010
  • 최근 들어 교량과 같은 구조물에 대한 생애주기비용(Life Cycle Cost, LCC) 분석의 중요성이 점차 커지고 있다. 그러나 교량의 공용수명 동안 발생할 수 있는 생애주기비용은 설계 및 시공조건 그리고 사용환경에 따라 많은 불확실성을 내포하고 있기 때문에 정확히 예측하기 힘들다. 본 논문에서는 교량의 생애주기비용 최적설계를 위한 설계방법을 제시하였다. 교량의 총생애주기비용은 초기비용, 손상비용 유지관리비용, 보수/보강비용, 사용자비용, 해제/폐기비용의 합으로 산정하였다. 생애주기비용을 목적함수로 하고 도로교설계기준을 제약조건으로 최적화를 수행하였다. 초기비용은 종합불가정보 및 참고자료를 근거로 산출하였으며, 하중 및 부재에 대한 불확실성을 고려하기 위해 손상확률의 개념을 도입하여 손상비용을 산출하였다. 교량의 내하율곡선을 이용하여 교량의 보수/보강 비용을 추정하였으며, 차량운행비용과 시간지연비용으로부터 사용자비용을 산정하였다. 이로부터 교량에 대한 생애주기비용 최적설계를 수행하고 주요인자들에 대한 영향을 살펴보았다.

건조비를 고려한 LPG 운반선 화물창의 최적설계에 관한 연구 (A Study on the Optimum Design of Cargo Tank for the LPG Carriers Considering Fabrication Cost)

  • 신상훈;황선복;고대은
    • 대한조선학회논문집
    • /
    • 제48권2호
    • /
    • pp.178-182
    • /
    • 2011
  • Generally in order to reduce the steel weight of stiffened plate, stiffener spaces tend to be narrow and the plate gets thin. However, it will involve more fabrication cost because it can lead to the increase of welding length and the number of structural members. In the yard, the design which is able to reduce the total fabrication cost is needed, although it requires more steel weight. The purpose of this study is to find optimum stiffener spaces to minimize the fabrication cost for the cargo tank of LPG Carriers. Global optimization methods such as ES(Evolution Strategy) and GA(Genetic Algorithm) are introduced to find a global optimum solution and the sum of steel material cost and labor cost is selected as main objective function. Convergence degree of both methods in according to the size of searching population is examined and an efficient size is investigated. In order to verify the necessity of the optimum design based on the cost, minimum weight design and minimum cost design are carried out.

에너지, 환경 및 경제성을 통합 고려한 공동주택 설계요소 제어에 관한 연구 (A Study on the Control of Apartment House Design Factors considering Energy, Environment and Economical Efficiency)

  • 최두성;도진석
    • KIEAE Journal
    • /
    • 제12권6호
    • /
    • pp.29-38
    • /
    • 2012
  • The current building energy efficiency rating certification regulation on apartment houses evaluates only the saving rate of energy consumed during operation, i.e. use, of a building, but doesn't consider the energy consumptions and environmental load($CO_2$) emissions occurring during the whole lifetime of a building. So this study calculated the energy consumptions and environmental load emissions occurring during the whole lifetime of a building, selected reference schemes and alternative items by design variables to present a design draft considering energy efficiency and environmental performance, and evaluated the total cost by combining and calculating its direct cost(material and heating cost) and indirect cost(environmental cost), for an existing apartment house as an evaluation object. As a result of analysis, the change of heating cost by alternative items of design variables showed a 4~8% change rate compared to the reference scheme, and the material cost of design variable 7 showed a maximum 4.4 times change rate in the alternative plan 6 compared to the reference scheme. The environmental cost showed a similar change rate to the material cost change rate in general, but showed a similar environmental cost change rate to the heating cost change rate in case of design variables 4-1, 4-2, 7.