• Title/Summary/Keyword: Delivery pollutant load

Search Result 36, Processing Time 0.024 seconds

A Study on Verification of Delivery Ratio Methodology for Basic Plan at TPLMs(Total Pollutant Load Management System) (수질오염총량관리계획 수립을 위한 유달율 적용방안 검증 연구)

  • Lee, Sung Jun;Rhee, Han Pil;Park, Ji Hyung;Kim, Yong Seok;Hwang, Ha Sun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.12
    • /
    • pp.714-722
    • /
    • 2017
  • The TPLMs is a system to manage the total amount of pollutants discharged from the watershed in order to achieve the target water quality of the river. In this process, the pollutant load can be classified into generation, discharge and delivery load. When using equation 2, the discharge coefficient should be 1. In case of using equation 3, it is considered that the discharge coefficient defined in the Technical Guideline should be applied. The delivery load is calculated as the product of the discharge load and the delivery ratio, and the delivery ratio is defined as the rate at which the pollutant discharged from the watershed reaches a specific point in the stream. In this study, the delivery ratio estimation method proposed by Hwang (2016) was applied to the Yonggang watershed in the Nakdong river. And the input data of QUALKO2 model was generated by using the estimated delivery ratio (equation 3) and the validation study was conducted by comparing with DRave (equation 2). As a result of the study, it is possible to use both the equation 2 and the equation 3, but it is necessary to change the methodology according to the application of the discharge coefficient.

A Study about the Influence of Pollutant Load on Water Quality in a Small Stream Watershed (소하천의 오염부하량이 수질에 미치는 영향에 관한 연구)

  • Lee, Sang-Hoon;Cho, Wook-Sang
    • Journal of Environmental Impact Assessment
    • /
    • v.10 no.1
    • /
    • pp.9-19
    • /
    • 2001
  • An intensive watershed survey including water quality measurement of 6 times was carried out in order to find out the relationship between pollutant load and water quality in a small stream watershed where livestock wastewater is the main source of water pollution. The findings from the survey are as follows. 1) The number of livestock showed large disagreement among county office, myon, and insite survey. It is vital to check the data at the beginning of watershed survey. 2) The fluctuation of streamflow and water quality was so large depending on the day of measurement that it is essential to set up continuous telemetering system to get reliable data about delivery ratio of pollutants. 3) It was helpful for setting the priority of investigation to check water quality and quantity at several points along the stream after dividing the watershed into 5 drainage areas. 4) To control the livestock wastewater, especially in case of cows, it is necessary to have roof system and prevent overland flow from the ground. In case of pig farms, it is recommended to have public treatment system instead of private treatment system. The exact emission load of livestock wastewater was difficult to estimate, and requires more study.

  • PDF

Regional Characteristics of Nonpoint Source Pollutant Loads in the Upstream Watersheds of Nakdong River (낙동강 상류유역의 지역별 비점오염부하 특성)

  • Choe, Gyeong-Suk;Son, Seong-Ho
    • KCID journal
    • /
    • v.13 no.2
    • /
    • pp.283-292
    • /
    • 2006
  • The characteristics of nonpoint source pollutant loads in upstream of Nakdong River were studied through analysis of pollutant loads of 10 sub-watersheds divided based on administrative district. The discharge and pollutant concentration of each sub-watershed were collected from Nakdong-River Water Research Institute and Daegu Regional Environmental office, respectively. Pollution items analysed in this study were BOD, T-N and T-P. The delivery loads of the nonpoint source pollutions of each sub-watershed were calculated after analysing the concentration of the pollution of each site. Several points were found from the results. Firstly, in general, city areas including Sangju, Andong showed higher degree of nonpoint pollution than country areas including Cheongsong, Yeongyang. The sub-watersheds located upstream side, such as Yeongju, Bonghwa, Necessarily show better water quality than the sub-watersheds located downstream side, such as Mungyeong, Uiseong. This result indicates that a given pollution condition within the watershed can be more sensitive than location factor to the level of water quality. Secondly, the delivery load and area of watershed were not necessarily correlated in the sense of water quality, while the discharge was shown to be highly correlated to the delively load of pollution. Lastly, sewage and waste caused from population and livestock, as well as landuse factor, were found to significantly contribute to the water pollution. Alternative solutions for controlling pollution source, therefore, should be provided to meet target levels of water quality in these regions.

  • PDF

Estimation of Pollutant Load Delivery Ratio for Flow Duration Using L-Q Equation from the Oenam-cheon watershed in Juam Lake (유량-부하량관계식을 이용한 주암호 외남천 유역의 유황별 유달율 산정)

  • Choi, Dong-Ho;Jung, Jae-Woon;Lee, Kyoung-Sook;Choi, Yu-Jin;Yoon, Kwang-Sik;Cho, So-Hyun;Park, Ha-Na;Lim, Byung-Jin;Chang, Nam-Ik
    • Journal of Environmental Science International
    • /
    • v.21 no.1
    • /
    • pp.31-39
    • /
    • 2012
  • The objective of this study is to provide pollutant loads delivery ratio for flow duration in Oenam-cheon watershed, which is upstream watershed of Juam Lake. To calculate the delivery ratio by flow duration, rating curves and discharge-loads curves using measured data were established, then Flow Duration Curve(FDC) and pollutant loads delivery ratio curves were constructed. The results show that the delivery ratios for $BOD_5$ for abundant flow($Q_{95}$), ordinary flow($Q_{185}$), low flow($Q_{275}$), and drought flow($Q_{355}$) were 23.9, 12.7, 7.1, and 2.9%, respectively. The delivery ratios of same flow regime for T-N were 58.4, 31.2, 17.2 and 7.1%, respectively. While, the delivery ratios T-P were 17.3, 7.5, 3.4, and 1.1% respectively. In general, delivery ratio of high flow condition showed higher value due to the influence of nonpoint source pollution. Based on the study results, generalized equations were developed for delivery ratio and discharge per unit area, which could be used for ungaged watershed with similar pollution sources.

Study on Representation of Pollutants Delivery Process using Watershed Model (수질오염총량관리를 위한 유역모형의 유달 과정 재현방안 연구)

  • Hwang, Ha Sun;Rhee, Han Pil;Lee, Sung Jun;Ahn, Ki Hong;Park, Ji Hyung;Kim, Yong Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.6
    • /
    • pp.589-599
    • /
    • 2016
  • Implemented since 2004, TPLC (Total Pollution Load Control) is the most powerful water-quality protection program. Recently, uncertainty of prediction using steady state model increased due to changing water environments, and necessity of a dynamic state model, especially the watershed model, gained importance. For application of watershed model on TPLC, it needs to be feasible to adjust the relationship (mass-balance) between discharged loads estimated by technical guidance, and arrived loads based on observed data at the watershed outlet. However, at HSPF, simulation is performed as a semi-distributed model (lumped model) in a sub-basin. Therefore, if the estimated discharged loads from individual pollution source is directly entered as the point source data into the RCHRES module (without delivery ratio), the pollutant load is not reduced properly until it reaches the outlet of the sub-basin. The hypothetic RCHRES generated using the HSPF BMP Reach Toolkit was applied to solve this problem (although this is not the original application of Reach Toolkit). It was observed that the impact of discharged load according to spatial distribution of pollution sources in a sub-basin, could be expressed by multi-segmentation of the hypothetical RCHRES. Thus, the discharged pollutant load could be adjusted easily by modification of the infiltration rate or characteristics of flow control devices.

Estimating the Pollution Delivery Coefficient with Consideration of Characteristics Watershed Form and Pollution Load Washoff (유역형상과 오염부하배출 특성을 고려한 유달계수 산정)

  • Ha, Sung-Ryong;Park, Jung-Ha;Bae, Myung-Soon
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.79-87
    • /
    • 2007
  • The performance of a stream water quality analysis model depends upon many factors attributed to the geological characteristics of a watershed as well as the distribution behaviors of pollutant itself on a surface of watershed. Because the model run has to import the pollution load from the watershed as a boundary condition along an interface between a stream water body and a watershed, it has been used to introduce a pollution delivery coefficient to behalf of the boundary condition of load importation. Although a nonlinear regression model (NRM) was developed to cope with the limitation of a conventional empirical way, this an up-to-date study has also a limitation that it can't be applied where the pollution load washed off (assumed at a source) is less than that delivered (observed) in a stream. The objective of this study is to identify what causes the limitation of NRM and to suggest how we can purify the process to evaluate a pollution delivery coefficient using many field observed cases. As a major result, it was found what causes the pollution load delivered to becomes bigger than that assumed at the source. In addition, the pollution load discharged to a stream water body from a specific watershed was calculated more accurately.

A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River (낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구)

  • Shon, Tae-Seok;Park, Jae-Bum;Shin, Hyun-Suk
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.

Delivered Pollutant Loads of Point and Nonpoint Source on the Upper Watershed of Lake Paldang - Case Study of the Watershed of Namhan River and Gyeongan Stream (팔당호 상류유역의 점·비점오염원 유달부하 특성 - 남한강·경안천 수계를 대상으로)

  • Park, Ji Hyoung;Kong, Dong Soo;Min, Kyung Sok
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.6
    • /
    • pp.750-757
    • /
    • 2008
  • This study is conducted to characterize and evaluate delivered pollutant loads of point and nonpoint source on the upper watershed of lake paldang. The study area consists of 12 watersheds in Namhan-river and Kyungahcheon, which are approximately 80% of total area of Namhan-river and Kyungahcheon. Based on daily delivered loads from watersheds, 61% of $BOD_5$, 81% of T-N and 70% of T-P were from nonpoint sources, suggesting that delivered loads of nonpoint pollutants be crucial to water quality. On the other hand, 78% of $BOD_5$, 92% of T-N and 87% of T-P as delivered load were from nonpoint sources in an upper watershed of Namhan-river, while 48% of $BOD_5$, 70% of T-N and 57% of T-P as delivered load were from nonpoint sources in a lower watershed of Namhan-river, suggesting higher dependency of point sources than upper watershed of Namhan-river. In the characteristic of delivered loading pollutants from point and nonpoint pollution sources, delivered load of nonpoint pollutants differed significantly by seasonal flow, and as though discharged load of point pollutants were yearly uniform, delivered load of point pollutants was found to be flow-dependent because its delivery ratio was changed.

Evaluation of Application to Pre-Developed Delivery Load Equation at Upper Watershed of the Daechung Reservoir (대청호 상류유역의 기 개발된 유달부하량 산정식의 적용성 평가)

  • Lee, Jun-Bae;Kim, Kap-Soon;Lee, Kyu-Seung;Yoon, Young-Sam;Lim, Byung-Jin;Jung, Jae-Woon
    • Korean Journal of Environmental Agriculture
    • /
    • v.31 no.1
    • /
    • pp.16-23
    • /
    • 2012
  • BACKGROUND: To improve the Daechung reservoir water quality, a quantitative estimation of the delivery load from upper watershed need to be conducted prior to others. To do so, an intensive monitoring is necessary because of the complexity and uncertainty of the delivery load from uppper watershed. However, intensive monitoring need to invest much time, cost, and effort. So, many researcher have developed an equation to estimate the delivery loads. But, relatively little research has been conducted on the applicability of pre-developed equation using other sites. Therefore, the objective of this study was to evaluate application of the equation for BOD, T-N and T-P delivery load. METHODS AND RESULTS: To verify the applicability of the equation, the following equation was used; Delivery loads(kg/day)=generated pollutant loads${\times}(1-{\alpha}){\times}$(daily outflow/${\beta})^{\gamma}$. The equations could be calculated the daily delivery loads of streams without any data of water quality, only with the data of daily runoff of study sites. The equations were applied to Youngdogcheon, Chogangcheon, Bocheongcheon, Sookcheon to examine its applicability using monitoring data. The results showed that the estimated delivery loads were in a good agreement with the observed data and indicated reasonable applicability of the equations. CONCLUSION(s): Overall, the equations were satisfactory in estimation of delivery loads at upper watershed of the Daechung reservoir. Therefore, the equations could be contributed to better water quality management in the Daechung reservoir.

Hydrologic and Water Quality Monitoring from a Small-Scale Livestock Watershed (소규모 축산 유역의 수문/수질 모니터링)

  • Lee, Nam-Ho;Yoon, Kwang-Sik;Kim, Seong-Joon;Hong, Seong-Gu
    • Journal of Korean Society of Rural Planning
    • /
    • v.7 no.2 s.14
    • /
    • pp.13-25
    • /
    • 2001
  • Runoff and water quality was monitored from a watershed with small-scale livestock production farms. To evaluate pollution potential, land use, population, the size of livestock production of each farm, and livestock management method were surveyed. Climate and stream flow data were measured. Water samples were taken periodically for base flow conditions and some storm events. Pollutant loading was estimated by flow volume and concentrations of constituents. Delivery ratio of pollutant load was determined using estimated pollutant load.

  • PDF