• Title/Summary/Keyword: Delivery Ship

Search Result 58, Processing Time 0.023 seconds

Optimizing Design for Rudder Horn (Rudder Horn 최적화 설계 방안)

  • Park, Sung-Geun
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2006.09a
    • /
    • pp.77-80
    • /
    • 2006
  • In recent booming up of the ship building market, the supplying of large scale casting is difficult to keep the delivery schedule for ship yard because of the restrict manufacturer in Korea. And also, it is main cause to rise-up the cost of castings. This paper describes the outline of guidance of optimizing design for Rudder Horn Casting to reduce the risk of the delivery problem to ship yard.

  • PDF

The U.K. Bills of Lading Act 1855 (영국(英國)의 선하증권법(船荷證券法))

  • Lim, Suk-Min
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.14
    • /
    • pp.153-176
    • /
    • 2000
  • The U.K. Bills of Lading Act 1855 had sought to circumvent the problems arising from the doctrine of privity of contracts. Among the principal factors in the introduction of the Act was the exceptional decision of the court in the case of Grant Norway. The Act 1855 was intended to reverse Grant Norway, but has no effect whatever. As it was not properly drafted, there had been a lot of situations where the Act 1855 was not applicable. In those cases, the courts have implied a contract between cosignee and carrier. This is the effect of the common law Brandt v. Liverpool doctrine. With the enactment of the Carriage of Goods by Sea Act 1992, all of the problems shall be resolved. It repeals the Act 1855 and replaces it with provisions covering not only B/L but also sea waybills and ship's delivery orders. According to the new law, title to sue is now vested in the lawful holder of a bill of lading, the consignee identified in a sea waybill or the person entitled to delivery under a ship's delivery order, irrespective of whether or not they are owners of the goods covered by the document.

  • PDF

The Development of a Balancing Control System for the Anti-Rolling Rail of a Delivery Ship (용달선의 횡 동요를 억제하기 위한 곡선레일의 수평유지장치 개발)

  • Byun, J.H.;Yeo, D.J.
    • Journal of Power System Engineering
    • /
    • v.8 no.4
    • /
    • pp.17-23
    • /
    • 2004
  • A delivery ship is used to handle the cargo with the crane to/from the ships. The ship is inclined in the direction of a cargo which is hung on a crane. In this case, a arc shaped rail should be in the equilibrium state to get good anti rolling performance. In this study, a device and control algorithm are developed to take accurate and quick equilibrium of the rail. The device is composed of a hinged immovable support and two screw jacks. And the control algorithm demands two controllers. One controller is designed such that the screw jack 1 and 2 follow the position reference signal generated by a tilt sensor. The other controller of two degree of freedom is designed to remove the synchronous error occurred between jack 1 and jack 2. The simulation results show that the desirable control performance is achieved.

  • PDF

The Balancing Control of Moving Mass Rail by a Screw Jack and Damper (스크류 잭 및 댐퍼를 이용한 가동질량 레일의 평형제어)

  • Byun, J.H.;Choi, M.S.
    • Journal of Power System Engineering
    • /
    • v.11 no.1
    • /
    • pp.134-139
    • /
    • 2007
  • A delivery ship is used to handle the cargo with the crane to/from the ships. The ship is inclined in the direction of a cargo which is hung on a crane. In this case, a arc shaped rail should be in the equilibrium state to get good anti-rolling performance. In this study, a device and control algorithm are developed to take accurate and quick equilibrium of the rail. The device is composed of a hinged immovable support, screw jack and damper. And the control system is based on I-PD control law to consider of control input saturation and overshoot. The controller is composed of integral controller of feedforward path and proportional-derivative controller of feedback path. The parameters of controller is designed to follow the reference signal and to remove overshoot. The simulation results show that the desirable control performance is achieved.

  • PDF

Application of reinforcement learning to fire suppression system of an autonomous ship in irregular waves

  • Lee, Eun-Joo;Ruy, Won-Sun;Seo, Jeonghwa
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.12 no.1
    • /
    • pp.910-917
    • /
    • 2020
  • In fire suppression, continuous delivery of water or foam to the fire source is essential. The present study concerns fire suppression in a ship under sea condition, by introducing reinforcement learning technique to aiming of fire extinguishing nozzle, which works in a ship compartment with six degrees of freedom movement by irregular waves. The physical modeling of the water jet and compartment motion was provided using Unity 3D engine. In the reinforcement learning, the change of the nozzle angle during the scenario was set as the action, while the reward is proportional to the ratio of the water particle delivered to the fire source area. The optimal control of nozzle aiming for continuous delivery of water jet could be derived. Various algorithms of reinforcement learning were tested to select the optimal one, the proximal policy optimization.

A Legal and Practical Study on the Main Clauses of a Refund Guarantee in a Shipbuilding Contract (선박수출거래에서 환급보증(Refund Guarantee) 주요 조항의 법적·실무적 고찰)

  • KIM, Sang-Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.72
    • /
    • pp.25-55
    • /
    • 2016
  • The Buyer shall demand to the Builder the repayment of the pre-delivery instalments paid in case of the Builder's default under a ship-building contract. The Buyer require a refund guarantee issued by a financial institution for a security for the repayment of the pre-delivery instalments paid. As the title of a refund guarantee, in practice, is various, we should look into the contents or the expressions in a guarantee to decide whether a guarantee is a refund guarantee. A refund guarantee, a sort of independent bank guarantee, has characteristic of abstractness, and is independent from the ship-building contract. A refund guarantee is available against the beneficiary's first written demand and signed statement certifying that the Builder failed to make the refund in accordance with the ship-building contract. The guaranteed amount of a refund guarantee will be automatically increased in accordance with the Builder's receipt of the respective instalment, which is not in the other advance payment guarantee. These characteristics of a refund guarantee are derived from the expressions in a refund guarantee rather than inherent therein. This illustrates that careful attention is required to the contents and expressions of the main clauses in a refund guarantee.

  • PDF

Study on Reduction of Excessive Noise and Vibration of Aft Part of High Speed Ro-Ro Passenger Ship (고속 여객선 선미부 과대 진동/소음 감소를 위한 연구)

  • Shin, Yunkil
    • Journal of Ocean Engineering and Technology
    • /
    • v.33 no.2
    • /
    • pp.196-202
    • /
    • 2019
  • In this study, the excessive noise and vibration phenomena of a high-speed Ro/Ro passenger ship were analyzed, and a countermeasure was taken based on them. This ship was granted a comfort class notation by the classification society, which was COMFORT-VIBRATION-II and COMFORT-NOISE-CREW-II. However, unfortunately, excessive noise and vibration in the aft part of the ship were delivered from the twin shaft propellers, and therefore the Class Requirement was not satisfied before delivery. In order to obtain the class notation, all of the concerned parties came to an agreement to reduce the noise and vibration level during operation after delivery because a seasonal ferry service was already scheduled and the cabin was fully booked. The root cause of the massive amount of noise and vibration was mainly the propeller-induced excitation pulse and beating that occurred from the mismatch of the rotating speeds of the two shaft lines. A 1st order vibrating force and beating phenomena existed in the propeller. Thus, a reduction of the excitation force, elimination of the beating phenomena, and decrease of the noise level at the aft area cabins and public spaces were required. In addition, structural reinforcements were conducted using pillars and additional girders at the aft part of the decks.

The Privity of the Contract Carriage of Goods by Sea (해상운송계약(海上運送契約)에 있어서 당사자관계(當事者關係)에 관한 연구(硏究))

  • Lee, Yong-Keun
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.12
    • /
    • pp.377-401
    • /
    • 1999
  • This study is focused on the privity of the contract of carriage of goods by sea, so to speak, privity between B/L holder and carrier by transfer of bill of lading, privity by attornment to delivery order and conflict between bills of lading and charterparty terms. Under a CIF contract, possession of the bill of lading is equivalent to possession of the goods, and delivery of the bill of lading to the buyer or to a third party may be effective to pass the property in the goods to such person. The bill of lading is a document of title enabling the holder to obtain credit from banks before the arrival of the goods, for the transfer of the bill of lading can operate as a pledge of the goods themselves. In addition, it is by virtue of the bill of lading that the buyer or his assignee can obtain redress against the carrier for any breach of its terms and of the contract of carriage that it evidences. In other words the bill of lading creates a privity between its holder and the carrier as if the contract was made between them. The use of delivery orders in overseas sales is commen where bulk cargoes are split into more parcels than there are bills of lading, and this practice gives rise to considerable difficulties. For example, where the holder of a bill of lading transferred one of the delivery orders to the buyer who presented it to the carrier and paid the freight of the goods to which the order related, it was held that there was a contract between the buyer and the carrier under which the carrier could be made liable in repect of damage to the goods. The contract was on the same terms as that evidenced by, or contained in, the bill of lading, which was expressly incorporated by reference in the delivery order. If the transferee of the delivery order presents it and claims the goods, he may also be taken to have offered to enter into an implied contract incorporating some of the terms of the contract of carriage ; and he will, on the carrier's acceptance of that offer, not only acquire rights, but also incur liabilities under that contract. Where the terms of the charterparties conflict with those of the bills of lading, it is interpreted as below. First, goods may be shipped in a ship chartered by the shipper directly from the shipowner. In that case any bill of lading issued by the shipowner operates, as between shipowner and charterer, as a mere receipt. But if the bill of lading has been indorsed to a third party, between that third party and carrier, the bill of lading will normally be the contract of carriage. Secondly, goods may be shipped by a seller on a ship chartered by the buyer for taking delivery of the goods under the contract of sale. If the seller takes a bill of lading in his own name and to his own order, the terms of that bill of lading would govern the contractual relations between seller and carrier. Thirdly, a ship may be chartered by her owner to a charterer and then subchartered by the chaterer to a shipper, to whom a bill of lading may later be issued by the shipowner. In such a case, the bill of lading is regarded as evidencing a contract of carriage between the shipowner and cargo-owners.

  • PDF

Optimum Allocation of Ships Emphasizing the Cargo Delivery Time (화물의 인도시기를 최우선으로 하는 배선문제)

  • 이중우;양시권;이철영
    • Journal of the Korean Institute of Navigation
    • /
    • v.5 no.1
    • /
    • pp.1-23
    • /
    • 1981
  • As far as transportation problems are concerned, the minimization of transportation cost is the most prevailing object. But in some cases, the cargo delivery time is the utter problem rather than the cost. For instance, we may imagine the case that the delivery of the construction materials is delayed behind the schedule and this makes the construction cost increased because of idle time of other materials and man power, in addition to the indemnity. Therefore the allocation of ships, in marine transportation which is now the main route of overseas trade, to the needed area on the required time is to be appropriately performed. However, there are several restrictions for cargo delivery to meet the demand, such as ship's size, number to be employed and cargo handling capacity of the ports, etc. And there are some other factors to be considered, that is, the degree of necessities of commodities, on their kinds, amount, and the time of arrival, etc. This paper deals with the problem of optimum allocation of ships emphasizing the cargo delivery time adopting Linear Programming technique with those cargo delivery restrictions and factors transformed by introducing the multi-speed conception, the conversion of multi-commodity to a single commodity, allowable delivery time, weight penalty number and nominating priority. This paper presents a case of optimum allocation of ships in the light of cargo delivery time for a construction company which has two different construction places and analyzes the result. This study will give a planner a good tool for optimum planning of maring transportation and be used for decision of schemes.

  • PDF

Research on systematization and advancement of shipbuilding production management for flexible and agile response for high value offshore platform

  • Song, Young-Joo;Woo, Jong-Hun;Shin, Jong-Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.3 no.3
    • /
    • pp.181-192
    • /
    • 2011
  • Recently, the speed of change related with enterprise management is getting faster than ever owing to the competition among companies, technique diffusion, shortening of product lifecycle, excessive supply of market. For the example, the compliance condition (such as delivery date, product quality, etc.) from the ship owner is getting complicated and the needs for the new product such as FPSO, FSRU are coming to fore. This paradigm shift emphasize the rapid response rather than the competitive price, flexibility and agility rather than effective and optimal perspective for the domestic shipbuilding company. So, domestic shipbuilding companies have to secure agile and flexible ship production environment that could respond change of market and requirements of customers in order to continue a competitive edge in the world market. In this paper, I'm going to define a standard shipbuilding production management system by investigating the environment of domestic major shipbuilding companies. Also, I'm going to propose a unified ship production management and system for the operation of unified management through detail analysis of the activities and the data flow of ship production management. And, the system functions for the strategic approach of ship production management are investigated through the business administration tools such as performance pyramid, VDT and BSC. Lastly, the research of applying strategic KPI to the digital shipyard as virtual execution platform is conducted.