• Title/Summary/Keyword: Delay Tool

Search Result 255, Processing Time 0.021 seconds

Prevention of delay in implant services using time schedule (타임스케줄을 이용한 임플란트 수술의 지연 개선)

  • Ji-Yeon, Park
    • Journal of Korean Academy of Dental Administration
    • /
    • v.10 no.1
    • /
    • pp.1-8
    • /
    • 2022
  • This study introduces research on the quality of medical services, optimization of medical services, dental medical services, implant medical services, and time schedules, as well as the effective process of dental implant medical services, which is expensive and requires a long treatment period. For improvement, it is suggested to evaluate using a time schedule. In this method, a time schedule is prepared in which each step, starting from the patients appointment until the completion of the treatment process, is allotted a certain time. This schedule was finalized in consultation with the employees. When performing all implant operations, the starting time of each item was checked to evaluate the degree of compliance and to understand any reasons for delay in each step. After identifying the causes for delay at each step, suitable steps to rectify the drawbacks were developed, and an optimal plan for patient management was determined. Changes in waiting time and human resource utilization were shown as concrete data, suggesting that such a schedule is meaningful as a decision-making support tool.

The Research of the CDMA Base station Traffic Analysis for Using the RTD Method (RTD 방식을 이용한 CDMA 기지국 Traffic 분석에 관한 연구)

  • Jo, Ung;Chin, Yong-Ohk
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.5A
    • /
    • pp.660-667
    • /
    • 2000
  • This paper aims at analyzing the traffic of CDMA base station. RTD(Round Trip Delay) method, used for the study, is one of the developed tool for calculating the call setup time between the BTS(Base Station TransceiverSubsystem) and mobile station.We compare the calculated call setup time in air with the field experiments.And we suggest the RTD method for dividing the traffic of the connected repeater from that of the BTS, andwe can testify it by the experiment which analyze the difference of the received time between the base stationand the repeater including the forced delay elements.

  • PDF

A Study on QoS Measurement for Electronic Commerce Systems (전자상거래 시스템의 서비스 품질 측정에 관한 연구)

  • Kim Jeong-Su;Seo Sang-Koo
    • Journal of Information Technology Applications and Management
    • /
    • v.12 no.3
    • /
    • pp.129-150
    • /
    • 2005
  • Due to the advance of the Internet, the electronic commerce is getting more widely used, and customer's demand for the e-Commerce service quality is rapidly increasing. On the other hand, e-Commerce companies required the Internet services whose quality is provided more reliable service to their customers. Therefore, it is very important to provide both e-Commerce companies and customers with the measurement and service quality in real-life network environment. But the research on the service quality measurement method for electronic commerce systems has been limited because ISP and e-Commerce providers seldom disclose detailed service measures such as, where and how much service delay incurred. In this paper, we construct sample e-Commerce systems and try to measure the service quality of the systems in real network environment. We have analyzed the delay zones and causes using a measurement tool. We must reflect the improvement method against delay causes. Accordingly, the customers can be experiences the better service quality. We hope that this research will be the groundwork for future research on the service quality of various types of e-Commerce systems and online services.

  • PDF

Proposed Message Transit Buffer Management Model for Nodes in Vehicular Delay-Tolerant Network

  • Gballou Yao, Theophile;Kimou Kouadio, Prosper;Tiecoura, Yves;Toure Kidjegbo, Augustin
    • International Journal of Computer Science & Network Security
    • /
    • v.23 no.1
    • /
    • pp.153-163
    • /
    • 2023
  • This study is situated in the context of intelligent transport systems, where in-vehicle devices assist drivers to avoid accidents and therefore improve road safety. The vehicles present in a given area form an ad' hoc network of vehicles called vehicular ad' hoc network. In this type of network, the nodes are mobile vehicles and the messages exchanged are messages to warn about obstacles that may hinder the correct driving. Node mobilities make it impossible for inter-node communication to be end-to-end. Recognizing this characteristic has led to delay-tolerant vehicular networks. Embedded devices have small buffers (memory) to hold messages that a node needs to transmit when no other node is within its visibility range for transmission. The performance of a vehicular delay-tolerant network is closely tied to the successful management of the nodes' transit buffer. In this paper, we propose a message transit buffer management model for nodes in vehicular delay tolerant networks. This model consists in setting up, on the one hand, a policy of dropping messages from the buffer when the buffer is full and must receive a new message. This drop policy is based on the concept of intermediate node to destination, queues and priority class of service. It is also based on the properties of the message (size, weight, number of hops, number of replications, remaining time-to-live, etc.). On the other hand, the model defines the policy for selecting the message to be transmitted. The proposed model was evaluated with the ONE opportunistic network simulator based on a 4000m x 4000m area of downtown Bouaké in Côte d'Ivoire. The map data were imported using the Open Street Map tool. The results obtained show that our model improves the delivery ratio of security alert messages, reduces their delivery delay and network overload compared to the existing model. This improvement in communication within a network of vehicles can contribute to the improvement of road safety.

Hardware-in-the-loop Simulation of CNC-controlled Feed Drives (CNC 제어 이송계의 Hardware-in-the-loop 시뮬레이션)

  • Lee, Wonkyun;Lee, Chan-Young;Kim, Joo-Yeong;Song, Chang Kyu;Min, Byung-Kwon
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.32 no.5
    • /
    • pp.447-454
    • /
    • 2015
  • Design and application of hardware-in-the-loop simulation (HILS) for design of CNC-controlled machine tool feed drives is discussed. The CNC machine tool is a complex mechatronics system where the complexity results from the software-based controller composed of a variety of functionalities and advanced control algorithms. Therefore, using a real CNC controller in the control simulation has merits considering the efforts and accuracy of the simulation modeling. In this paper challenges in HILS for a CNC controlled feed drive, such as minimization of time delay and transmission error that are caused by discretization of the feed drive model, is elaborated. Using an experimental HILS setup of a machine tool feed drive applications in controller gain selection and CNC diagnostics are presented.

A Study on Simulation-based Method for Implementation of Ground Delay Program for Jeju International Airport (시뮬레이션 기반의 지상지연 프로그램 적용방안에 관한 연구 - 제주국제공항을 사례로 -)

  • Lee, Young-Jong;Cho, Ji-Eun;Baik, Ho-Jong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.23 no.1
    • /
    • pp.41-48
    • /
    • 2015
  • Being a cost-efficient solution for alleviating the traffic congestion in airspace, Air Traffic Flow Management (ATFM) has drawn more attentions from not only air traffic controllers but also researchers in the field of Air Traffic Management (ATM). Among other ATFM initiatives, it is believed that Ground Delay Program (GDP) could be effectively applied to reduce the congestion particularly in the relatively small airspace with dense traffic demand. This paper introduces a novel way that suggests flights to be delayed on the departing airports together with amount of the delays (in time) for those flights to be delayed. Adopting a fast-time simulation for predicting airspace delay of each flight for a given flight plan, the method is designed to iteratively and incrementally adjust the departure times in the plan towards reducing total airspace delays. Applying the method to Jeju airport with a hypothetically high demand, the paper demonstrates the airspace delay could be significantly reduced by applying GDP at Gimpo airport where more than 60% of Juju-bound flights departure. Although the simulation model needs to be calibrated and validated for the real-world application, the results clearly shows that the approach can possibly implemented as a tool for preparing the daily plan at the pre-tactical stage defined in the ICAO ATFM manual.

The Reliability of the Pediatric Functional Muscle Testing in Children with Developmental Delay

  • Seo, Hye-Jung;Kim, Joong-Hwi
    • The Journal of Korean Physical Therapy
    • /
    • v.27 no.4
    • /
    • pp.183-189
    • /
    • 2015
  • Purpose: The aim of this study was to examine the test-retest and inter-rater reliability of the pediatric functional muscle testing (PFMT) when applied to children with developmental delay. Methods: Sixteen children with developmental delay (seven females, nine males) participated in this study. For the inter-rater reliability, each was scored on the PMFT by two pediatric physical therapists with more than 8 years of clinical experience on the same day. For assessment of the test-retest reliability, one therapist tested the children again within 10 days. The second measurement was performed by taking a first measurement in video. Intraclass correlation coefficient (ICC) was calculated to determine the test-retest and inter-rater reliability of the PFMT, and Chronbach's alpha was used to measure internal consistency. Results: The results of this study were as follows: 1) The test-retest ICC of the score of the infant action month and the right side of the PFMT was from 0.53 to 1.00 and from 0.63 to 0.99, respectively. 2) The inter-rater ICC of the score of the infant action month and the right side of the PFMT was from 0.66 to 1.00 and from 0.64 to 1.00, respectively. 3) Chronbach's alpha was 0.93. The internal consistency indicated excellent. Conclusion: In conclusion, this study showed that the test-retest and inter-rater reliability of the PFMT was relatively high, except for a few items. Therefore, it can be suggested that the PFMT will be a useful tool for measurement of muscle strength for children with developmental delay if it be some modifications.

Operational Effectiveness of Roundabout by the Change of Pedestrian Traffic Volume (보행교통량 변화에 따른 회전교차로의 운영효과)

  • In, Byung-Chul;Park, Min-Kyu;Park, Byung-Ho
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.10 no.6
    • /
    • pp.24-31
    • /
    • 2011
  • This study deals with the operational effectiveness of roundabout. The roundabout is currently under consideration in our country depending on the result of existing researches, that the roundabout decreases delay and is environmentally friendly compared to the signalized intersection. The purpose of the study is to analyze the operational effectiveness of the roundabout by the change of pedestrian traffic volume. In pursing the above, this study gave particular emphasis to designing a network of roundabout, developing some scenarios for analysis including both entering traffic volume and pedestrians volume, and comparatively analyzing the average controlled delay time per vehicle. In this study, VISSIM model was used as a tool for traffic simulation. The main results are as follows. First, as a result of analyzing a traffic delay based on the pedestrian traffic volume, pedestrian traffic volume was analyzed to have a great impact on the roundabout operation. Second, the more pedestrian traffic volume were evaluated to indicate the more traffic delay. When the entering volumes with 1,000persons/hour (pedestrian volume) were more than 800pcph in the single-lane and 1,600pcph in the double-lane roundabout, the operational efficiencies of signalized intersections were evaluated to be better than those of roundabouts.

Development of a Tool for the Electrical Analysis and Design of TFT/LCD System Package (TFT/LCD 시스템 패키지 전기적 특성 분석 및 설계도구의 구현)

  • Yim, Ho-Nam;Jee, Yong
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.32A no.12
    • /
    • pp.149-158
    • /
    • 1995
  • This paper describes the development of a software tool LCD FRAME that may guide the analyzing process for the electrical characteristics and the design procedure for constructing the thin film transistor liquid crystal display(TFT/LCD) packages. LCD FRAME can analyze its electrical characteristics from the TFT/LCD system package configuration, and provide the design variables to meet the user's requirements. These analysis and design procedure can be done in real time according to the model at simplified package level of TFT/LCD. LCD_FRAME is an object-oriented expert system which considers package elements as objects. With this LCD_FRAME software tool, we analyzed the I-V characteristics of a-Si TFT and its signal distortion which has maximum 1.58 $\mu$s delay along the panel scan line of the package containing 480 ${\times}$ 240 pixels. We designed the package structure of maximum 6.35 $\mu$s signal delays and 3360 ${\times}$ 780 pixels, and as a result we showed that the proper structure of 20 $\mu$m scan line width, 60$\mu$m panel TFT gate width and 8 $\mu$m gate length. This LCD_FRAME software tool provides results of the analysis and the design in the form of input files of the SPICE program, text data files, and graphic charts.

  • PDF

Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects (해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법)

  • Lee, Hwangku;Shin, Dongwoo;Kim, Kyungrai;Cha, Heesung;Kim, Youngjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.65-77
    • /
    • 2017
  • Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.