• Title/Summary/Keyword: Delay Angle

Search Result 258, Processing Time 0.026 seconds

Generalized cross correlation with phase transform sound source localization combined with steered response power method (조정 응답 파워 방법과 결합된 generalized cross correlation with phase transform 음원 위치 추정)

  • Kim, Young-Joon;Oh, Min-Jae;Lee, In-Sung
    • The Journal of the Acoustical Society of Korea
    • /
    • v.36 no.5
    • /
    • pp.345-352
    • /
    • 2017
  • We propose a methods which is reducing direction estimation error of sound source in the reverberant and noisy environments. The proposed algorithm divides speech signal into voice and unvoice using VAD. We estimate the direction of source when current frame is voiced. TDOA (Time-Difference of Arrival) between microphone array using the GCC-PHAT (Generalized Cross Correlation with Phase Transform) method will be estimated in that frame. Then, we compare the peak value of cross-correlation of two signals applied to estimated time-delay with other time-delay in time-table in order to improve the accuracy of source location. If the angle of current frame is far different from before and after frame in successive voiced frame, the angle of current frame is replaced with mean value of the estimated angle in before and after frames.

Aerodynamic Force Measurements and PIV Study for the Twisting Angle of a Swift Wing Model (칼새 날개의 비틀림 각에 대한 공력측정 및 PIV 연구)

  • Bok, Jung Jin;Chang, Jo Won
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.43 no.9
    • /
    • pp.765-772
    • /
    • 2015
  • Aerodynamic force measurements and phase-locked PIV study were carried out to check the bio-mimetic MAV applicability of a swift flight. Two-rotational DOF robotic wing model and blowing-type wind tunnel were employed. The amplitude of twist angle were ${\pm}0$, ${\pm}5$, ${\pm}10$, and ${\pm}20$ deg. and stroke angles were manipulated by simple harmonic function with out-of-phase in regards to the stroke motion. It is acknowledged that the time-varying lift coefficients in accordance with the change of the twist angle did not result in any noticeable differences, just the small decrease and delay. However, the drag exhibited that the small change of the twist angle can produce large thrust. These findings imply why a swift uses small twist angle during flight. The PIV results displayed that the delay of aerodynamic forces is highly associated with the vortical structures around the wing. It is therefore indicated that a process of designing a swift-based Micro Air Vehicle should take the twist angle into consideration, as the essential parameter.

A Novel Powered Gait Orthosis using Pneumatic Muscle Actuator

  • Kang, Sung-Jae;Ryu, Jei-Cheong;Moon, In-Hyuk;Ryu, Jae-Wook;Mun, Mu-Seung
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1500-1503
    • /
    • 2003
  • One of the main goals in the rehabilitation of SCI patients is to enable the patient to stand and walk themselves. We are developing high-thrust powered gait orthosis(PGO) that use air muscle actuator(shadow robot Co., UK) to be assisted gait and rehabilitation purposes of them. We made of PD controller and measured hip joint angle by its load and the pressure to control air muscle of PGO. As a results, maximum flexion angle of hip joint is $20^{\circ}$, and angular velocity is 30.4${\pm}2.5^{\circ}/sec$, and then delay time of system was average 0.62${\pm}$0.03s. As the hip flexion angle and the pelvic angle is decreased during the gait with PGO, the patient can walk faster. By using the PGO, the energy consumption can also be decreased. therefore, the proposed PGO can be a very useful assitive device for the paraplegics to walk.

  • PDF

AE-CORDIC: Angle Encoding based High Speed CORDIC Architecture (AE-CORDIC: 각도 인코딩 기반 고속 CORDIC 구조)

  • Cho Yongkwon;Kwak Seoungho;Lee Moonkey
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.41 no.12
    • /
    • pp.75-81
    • /
    • 2004
  • AE-CORDIC improves the CORDIC operation speed with a rotation direction pre-computation algorithm. Its CORDIC iteration stages consist of non-predictable rotation direction states and predictable rotation stages. The non-predictable stages are replaced with lookup-table which has smaller hardware size than CORDIC iteration stages. The predictable stages can determine rotation direction with the input angle and simple encoder. In this paper, a rotation direction pre-computation algorithm with input angle encoder is proposed. and AE-CORDIC which have optimized Lookup-table is compared with the P-CORDIC algorithm. Hardware size, delay, and SQNR of the AE-CORDIC are verified with Samsung 0.18㎛ technology and Synopsys design compiler when input angle bit length is 16.

A STUDY OF TROPOSPHERIC EFFECT ON HIGH PRECISION GPS HEIGHT DETERMINATION

  • Wang, Chuan-Sheng;Liou, Yuei-An
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.382-385
    • /
    • 2007
  • Constantly enhancing positioning accuracy by the Global Positioning System (GPS) technique is of great importance, but challenging, especially after the GPS positioning technique has been improved considerably during the past two decades. The associated main error sources have been reduced substantially, if not eliminated. Troposhpeic influence with its highly temporal and spatial variability appears to be one of the major error sources. It is hence an increased interest among GPS researchers to reduce the tropospheric influence or delay. Two techniques have been commonly implemented to correct the tropospheric impact. The first technique, known as parameter estimation, characterizes the path delay with empirical models and the parameters of interest are determined from the GPS measurements. The second strategy, termed as external correction, involves independent path delay measurements. The present study is an integration of both techniques in which the parameter estimation as well as external correction are used to correct the path delay for $110{\sim}210$ km range baselines. Twenty-four parameters have been obtained in 24 hours solution by setting the cutoff angle at 3 and 15 degrees for parameter estimation strategy. Measurements from meteorological instruments and water vapor radiometer (WVR) are applied in the GPS data processing, separately, as an external strategy of present research work. Interesting results have been found, indicating more stable repeatability in baseline when the external correction strategy is applied especially with the inclusion of WVR observations. The offset of an order of 1 cm is found in the baselines determined by the two strategies. On the other hand, parameter estimation exhibits more stable in terms of GPS height repeatability. The offset in the GPS height determined by the two strategies is on the order of few centimeters.

  • PDF

Transient Response Analysis of the Trigonometric Distributed RC Circuit (삼각함수형 RC분포회로의 과도응답해석)

  • 김덕진
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.4 no.4
    • /
    • pp.13-18
    • /
    • 1967
  • Since all the poles of the open circuit voltage transfer function of the trigonometric, linear, passive RC circuits exist on the negative real axis of s-plane, its transient response to the unit step input is monotonic. This satisfies the necessary conditions for the applicability of Elmore's method which had been developed originally for the transient analysis of lumped circuit in computing the rise time and delay time of the trigonometric distributed RC circuits. This paper describes the computing method of rise and delay times of the trigonometric distributed RC circuit. The analysis shows that the transient response of this kind circuit depends only upon the time constant and distance angle $\theta$. As $\theta$ is increased, the rise and delay titles are increased non-linearly.

  • PDF

Grid Voltage Estimation Scheme without Phase Delay in Voltage-sensorless Control of a Grid-connected Inverter (전압센서를 사용하지 않는 계통연계 인버터의 제어 및 위상지연을 개선한 계통전압 추정 기법)

  • Kim, Hyun-Sou;Kim, Kyeong-Hwa
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.22 no.1
    • /
    • pp.89-93
    • /
    • 2017
  • This study proposes a grid voltage estimation scheme without a phase delay in the voltage-sensorless control of a grid-connected inverter to enhance its economic feasibility, such as manufacturing cost and system complexity. The proposed scheme estimates grid voltages using a disturbance observer (DOB)-based current controller to control the grid-connected inverter without grid-side voltage sensors. The proposed voltage-sensorless control scheme can be applied successfully to grid-connected inverters, which should be operated with synchronization to the grid, considering the phase angle of the grid can be effectively detected through estimating the grid voltages by DOB. However, a problem associated with the phase delay in estimated grid voltages remains because the DOB has dynamic behavior similar to low-pass filter. Hence, the estimated grid voltages are compensated by a phase lead compensator to overcome the limitation. The effectiveness of the proposed control and estimation schemes is proven through simulations and experiments using a 2 kVA prototype inverter.

Delay Factor Analysis of Public Project Based on System Dynamics (SD를 이용한 공공 프로젝트의 지체요인 분석)

  • 이만형;이정민
    • Korean System Dynamics Review
    • /
    • v.4 no.2
    • /
    • pp.95-130
    • /
    • 2003
  • The purpose of this study is to find what causes make public projects hold off, going beyond the planned deadline and budget. Using System Dynamics(SD) and their derivative Urban Dynamics(UD) models, it intends to analyze major feedback loops based on VENSIM and to simulate them with STELLA software, all of which are interrelated with various causes of project delay. To prevent or ameliorate project delay, first of all it advises to focus on endogenous delaying factors not exogenous ones. These factors either reinforce or balance certain loops in complex causal structure, In the case example on the Cremation Building Project in Cheongju, Residents’ participation demand make negotiation put off and delayed negotiation reinforces administrative-expediency planning in order to observe a time limit, on the other hand, once building consensus, it increase both the level of planning performance and public trust. In the meantime, the real planning process used to neglect residents opinions and manage public grievance only through compensation, he a result of simulation, visible fruit of negotiation in the initial phase seems to be not satisfactory owing to funds and time consumed, but after reaching an mutual agreement among stakeholders, planning performance is effective and strategic than administrative-expediency planning viewed in both financial and time angle. It proposes to devise specific tools schematizing project implementation. In order to upgrade the quality of project management, it recommends for planners to adopt key concepts based on SD/UD diagrams and causal loops, which would contribute to enriching Planning abbots.

  • PDF

A Design of Dual Frequency Bands Time Synchronization System for Synchronized-Pseudolite Navigation System

  • Seo, Seungwoo;Park, Junpyo;Suk, Jin-Young;Song, Kiwon
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.3 no.2
    • /
    • pp.71-81
    • /
    • 2014
  • Time synchronization system using dual frequency bands is designed and the error sources are analyzed for alternative synchronized-pseudolite navigation system (S-PNS) which aims at military application. To resolve near/far problem, dual frequency band operation is proposed instead of pulsing transmission which degrades level of reception. In dual frequency operation H/W delay should be considered to eliminate errors caused by inter-frequency bias (IFB) difference between the receivers of the pseudolites and users. When time synchronization is performed across the sea, multipath error is occurred severely since the elevation angle between pseudolites is low so total reflection can be happened. To investigate the difference of multipath effects according to location, pseudolites are set up coastal area and land area and performances are compared. The error source related with tropospheric delay is becoming dominant source as the coverage of the PNS is broadening. The tropospheric delay is measured by master pseudolite receiver directly using own pseudorange and slave pseudorange. Flight test is performed near coastal area using S-PNS equipped with developed time synchronization system and test results are also presented.

Control of throttle actuator system based on time delay control (시간지연제어에 기초한 스로틀액츄에이터 시스템의 제어)

  • Song, Jae-Bok;Byeon, Kyeong-Seok
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.21 no.12
    • /
    • pp.2081-2089
    • /
    • 1997
  • Accurate positioning of the throttle valve of a gasoline engine is required to implement various systems such as traction control system(TCS), cruise control system and drive-by-wire system. In this research, position control system has been developed for the throttle actuator system that uses one throttle actuation for small volume and DC servo motor for fast response. In order to drive the DC motor, PWM signal generator and PWM amplifier were built and interfaced to the motor and controller. Also, time delay control(TDC) law has been used as a basic control algorithm. A method of varying the reference model of the TDC according to the size of change in target throttle angle is proposed here. The simulation and experimental results show that both overshoot prevention and fast response are achieved by the TDC technique with this variable reference model.