• Title/Summary/Keyword: Defense procurement

Search Result 46, Processing Time 0.029 seconds

Developing a dynamic programming model for aircraft-engine maintenance scheduling (항공기 엔진 정비 일정 수립을 위한 동적 계획 모델 개발)

  • 주성종;신상헌
    • Korean Management Science Review
    • /
    • v.13 no.3
    • /
    • pp.163-172
    • /
    • 1996
  • According to flying hours, aircraft engines require regular overhaul for preventive maintenance. Because of hostile defense environment of Republic of Korea, the aircraft of republic of Korea Air Force(ROKAF) have been operated at the maximum level of availability and have similar overhaul schedule in several months. The concentration of overhaul schedule in a short period demands additional spare engines far exceeding the spare engines for corrective maintenance. If ROKAF decides to purchase extra engines for the preventive maintenance, the extra engines will be used only for the preventive maintenance and will be excess inventory for the most of aircraft life ccle. Also, the procurement of extra engines is significant investment for ROKAF. To help ROKAF schedule the preventive maintenance without significant spending, this study develops a dynamic programming model that is solvable using an integer programming algorithm. The model provides the number of engines that should be overhauled for a month for multiple periods under given constraints. ROKAF actually used this model to solve a T-59 engine overhaul problem and saved about three billion won at one time. ROKAF plans to use this model continuously for T-59 and other weapon systems. Thus, saving for long term will be significant to ROKAF. Finally, with minor modification, this model can be applied to deciding the minimum number of spare engines for preventive maintenance.

  • PDF

The Limitation of the Military Aviation Manufacturer's Liability (우리나라 군용항공기 제작사의 책임제한 해결방안에 관한 고찰)

  • Shin, Sung-Hwan
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.32 no.1
    • /
    • pp.139-175
    • /
    • 2017
  • The Assembly plenary session on December 3, 2017 passed a Product Liability Amendment bill that introduced clauses concerning consumer burden of proof and punitive damage reimbursement. More specifically, these newly approved provisions will reduce the burden of proof placed on consumers and levy triple punitive damage on suppliers. Significant increases in the number of product-liability lawsuit and the number of related insurance contracts are expected. Since military aircraft are designed for operational purpose(seeking greater combat effectiveness over greater safety) and used in high-risk environment, it is practically impossible to obtain an affordable product-liability insurance, Without having any backup plan, military aircraft manufacturers directly face all sort of liability risks under Product Liability Act, Warrant Liability Act and Non-Performance of Contract Act. The U.S. experienced similar problems when they first implemented their product-liability law in 1970s. There had been a big dispute among legal practitioner, insurance professionals and scholars concerning military aircraft manufacturer's liability. In order to settle the issue, the U.S. Supreme Court has established a new precedent of Government Contractor Defense(GCD). The U.S. government also included an indemnity clause for military aircraft manufacturers in their FMS Contract with the Korean government. Likewise, Korean military aircraft manufacturers should 1) clearly understand their current position that they cannot afford expensive product-liability insurance and the cost is not accounted in the military procurement calculation, 2) estimate potential liability risks with the ongoing overseas export expansion in mind, 3) set up appropriate risk management measures through regulatory reform and policy development.

  • PDF

Analysis of Munitions Contract Work Using Process Mining (프로세스 마이닝을 이용한 군수품 계약업무 분석 : 공군 군수사 계약업무를 중심으로)

  • Joo, Yong Seon;Kim, Su Hwan
    • Journal of Intelligence and Information Systems
    • /
    • v.28 no.4
    • /
    • pp.41-59
    • /
    • 2022
  • The timely procurement of military supplies is essential to maintain the military's operational capabilities, and contract work is the first step toward timely procurement. In addition, rapid signing of a contract enables consumers to set a leisurely delivery date and increases the possibility of budget execution, so it is essential to improve the contract process to prevent early execution of the budget and transfer or disuse. Recently, research using big data has been actively conducted in various fields, and process analysis using big data and process mining, an improvement technique, are also widely used in the private sector. However, the analysis of contract work in the military is limited to the level of individual analysis such as identifying the cause of each problem case of budget transfer and disuse contracts using the experience and fragmentary information of the person in charge. In order to improve the contract process, this study analyzed using the process mining technique with data on a total of 560 contract tasks directly contracted by the Department of Finance of the Air Force Logistics Command for about one year from November 2019. Process maps were derived by synthesizing distributed data, and process flow, execution time analysis, bottleneck analysis, and additional detailed analysis were conducted. As a result of the analysis, it was found that review/modification occurred repeatedly after request in a number of contracts. Repeated reviews/modifications have a significant impact on the delay in the number of days to complete the cost calculation, which has also been clearly revealed through bottleneck visualization. Review/modification occurs in more than 60% of the top 5 departments with many contract requests, and it usually occurs in the first half of the year when requests are concentrated, which means that a thorough review is required before requesting contracts from the required departments. In addition, the contract work of the Department of Finance was carried out in accordance with the procedures according to laws and regulations, but it was found that it was necessary to adjust the order of some tasks. This study is the first case of using process mining for the analysis of contract work in the military. Based on this, if further research is conducted to apply process mining to various tasks in the military, it is expected that the efficiency of various tasks can be derived.

DMSMS Management Survey and Analysis Method (부품단종에 대한 조사·분석 및 관리방안)

  • Jung, Hyun-Woo;Shim, Bo-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.5
    • /
    • pp.257-265
    • /
    • 2020
  • Parts obsolescence is a component type, in which raw materials or parts that make up a weapons system, are developed and produced according to demand, but they age due to changes in technology or market conditions. The weapon system equipment currently being used by the military is having difficulty in procurement, maintenance, and operation because of the obsolescence of parts. Parts obsolescence during the life cycle of a weapons system affects not only the combat readiness of the military but also the economic loss of material, parts, and equipment manufacturers and suppliers. On the other hand, advanced technology has reduced the life span of electronic components that make up the weapons system. In addition, because of the nature of the weapons system, the obsolescence of components takes decades from development to disposal, which has a serious adverse effect on equipment readiness and life cycle costs. Therefore, it is necessary to manage systematically the parts obsolescence from development until the disposal of the weapons system equipment. This study examined the system of component control in developed countries to present a proper management plan for local situations and propose development plans for the early settlement of component control.

The Evolution of the IT Service Industry in the U.S. National Capital Region: The Case of Fairfax County (미국 수도권 IT서비스산업 집적지의 진화: 페어팩스 카운티를 사례로)

  • Huh, Dongsuk
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.16 no.4
    • /
    • pp.567-584
    • /
    • 2013
  • This study aims to explore an evolutionary path of the IT service industry in Fairfax County using the Cluster Adaptive Cycle model in economic geography. The analysis is based on detailed historical and industrial information obtained through a variety of data sources including local archival materials, economic census, and interviews. This study also performs a shift-share analysis during the period of 1990 to 2011. Using the adaptive cycle model, the local IT service industry is indicated by a trajectory of constant cluster mutation. The evolution of the local IT service industry has been closely related to federal government policy due to the regional specificity of the National Capital Region and the proximity of the Department of Defense. Although the economic downturn of the late 2000s, the local IT service industry has been notable resilience and adapted to a changing market and technological environment. This constant mutation of the local industry is resulted from not only high resilience which is based on the large government procurement market, the reinforcement of adaptive capacity of the local firms and the network of economic agents such as firm and supporting institutions, but also high flexibility of the knowledge-based service industry to a changing business environment.

  • PDF

A Study on Integrated Logistic Support (통합병참지원에 관한 연구)

  • 나명환;김종걸;이낙영;권영일;홍연웅;전영록
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.277-278
    • /
    • 2001
  • The successful operation of a product In service depends upon the effective provision of logistic support in order to achieve and maintain the required levels of performance and customer satisfaction. Logistic support encompasses the activities and facilities required to maintain a product (hardware and software) in service. Logistic support covers maintenance, manpower and personnel, training, spares, technical documentation and packaging handling, storage and transportation and support facilities.The cost of logistic support is often a major contributor to the Life Cycle Cost (LCC) of a product and increasingly customers are making purchase decisions based on lifecycle cost rather than initial purchase price alone. Logistic support considerations can therefore have a major impact on product sales by ensuring that the product can be easily maintained at a reasonable cost and that all the necessary facilities have been provided to fully support the product in the field so that it meets the required availability. Quantification of support costs allows the manufacturer to estimate the support cost elements and evaluate possible warranty costs. This reduces risk and allows support costs to be set at competitive rates.Integrated Logistic Support (ILS) is a management method by which all the logistic support services required by a customer can be brought together in a structured way and In harmony with a product. In essence the application of ILS:- causes logistic support considerations to be integrated into product design;- develops logistic support arrangements that are consistently related to the design and to each other;- provides the necessary logistic support at the beginning and during customer use at optimum cost.The method by which ILS achieves much of the above is through the application of Logistic Support Analysis (LSA). This is a series of support analysis tasks that are performed throughout the design process in order to ensure that the product can be supported efficiently In accordance with the requirements of the customer.The successful application of ILS will result in a number of customer and supplier benefits. These should include some or all of the following:- greater product uptime;- fewer product modifications due to supportability deficiencies and hence less supplier rework;- better adherence to production schedules in process plants through reduced maintenance, better support;- lower supplier product costs;- Bower customer support costs;- better visibility of support costs;- reduced product LCC;- a better and more saleable product;- Improved safety;- increased overall customer satisfaction;- increased product purchases;- potential for purchase or upgrade of the product sooner through customer savings on support of current product.ILS should be an integral part of the total management process with an on-going improvement activity using monitoring of achieved performance to tailor existing support and influence future design activities. For many years, ILS was predominantly applied to military procurement, primarily using standards generated by the US Government Department of Defense (DoD). The military standards refer to specialized government infrastructures and are too complex for commercial application. The methods and benefits of ILS, however, have potential for much wider application in commercial and civilian use. The concept of ILS is simple and depends on a structured procedure that assures that logistic aspects are fully considered throughout the design and development phases of a product, in close cooperation with the designers. The ability to effectively support the product is given equal weight to performance and is fully considered in relation to its cost.The application of ILS provides improvements in availability, maintenance support and longterm 3ogistic cost savings. Logistic costs are significant through the life of a system and can often amount to many times the initial purchase cost of the system.This study provides guidance on the minimum activities necessary to Implement effective ILS for a wide range of commercial suppliers. The guide supplements IEC60106-4, Guide on maintainability of equipment Part 4: Section Eight maintenance and maintenance support planning, which emphasizes the maintenance aspects of the support requirements and refers to other existing standards where appropriate. The use of Reliability and Maintainability studies is also mentioned in this study, as R&M is an important interface area to ILS.

  • PDF