Process for Risk Severity Estimation of Weapon System Development Project using Parametric Estimation Method/Linear Kalman Filter (모수 추정기법/선형 칼만 필터를 이용한 무기체계개발 프로젝트 위험 요소의 영향도 추정 프로세스)

  • Lee, Seung-Yup
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.6
    • /
    • pp.567-574
    • /
    • 2018
  • Risk management is a method to 1) identify risks that can adversely affect the cost, schedule, and target achievement performance of a system development project, and 2) manage the identified risks based on the severity and likelihood assigned to each risk item. Risk management is applicable to various fields, since it can manage the cost/schedule and effectively guides accomplishing the target performance by identifying and managing the risks in advance, which necessitates many concurrent studies. This paper proposes a procedure to estimate the severity value for a risk item using a Kalman filter. It is assumed that the severity can be expressed as an equation consisting of cost/schedule loss during the risk event. A linear Kalman filter is used to reduce the error between the true and estimated values, which can eventually save resources spent on the risk management procedure. A simulation test case was conducted to demonstrate the validity of the proposed method.

Development of Nitrogen Charging Trailer for Aircraft Improved Operability (운용성을 개선한 항공기용 질소충전트레일러 국산화 개발)

  • Park, Hyo-Jin
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.46 no.6
    • /
    • pp.513-518
    • /
    • 2018
  • Nitrogen charging trailer applied to KUH-1 is a device to charge Nitrogen in main front wheel buffer, tail bumper buffer, brake accumulator and tire of aircraft. As the name suggests, it is a device that has mobility along with nitrogen charging. Originally supplied by Tronair in the United States, it was imported from Korea, and the locally developed product not only satisfies the performance of the existing product, but also designed to be easier than the product introduced in the operation. It was selected as the joint investment project of the 15th civilian government building, and development needs analysis and test evaluation were carried out under the support of development and management of Korea Aerospace Industries and Defense Agency for Technology and Quality.

A Study for Defense Acquisition System Improvement (국방무기체계 획득절차 발전방향 - 미국 국방획득절차 개선노력을 중심으로 -)

  • Go, Sim-Jae
    • Journal of the military operations research society of Korea
    • /
    • v.31 no.2
    • /
    • pp.86-104
    • /
    • 2005
  • During the 'Cold War', DoD had focused on the high performance and timely acquisition which enabled quick field out the superior weapons than the enemy regardless of acquisition cost. But, after the cold war, the focus has been changed to the 'cost effective acquisition' of weapon systems because of tremendous investment cost & economic theory. The U.S. DoD has been tried to make 'the most effective acquisition system'(AR, Acquisition Reform) from mid-80's with their enough experienced program data, and as a result, they had launched the new acquisition procedure - DoD 5000 series - in 1996. DoD is continuously doing the study and making several improvements on the procedure after it had been once announced. On Oct 30. 2002, DoD noticed that they cancelled the DoD 5000 series documents(5000.1, 5000.2, 5000.2-R) and 5000.2-R will be reissued as a guide. The most recent version which focused on 1) evolutionary acquisition and spiral development, 2) procedure for future technology systems including software and IT, 3) supplement on the area of efficiency, flexibility, creativity and innovation of old system was issued by May 12. 2003. This article suggests a 'good idea' based on the reviewing of these DoD efforts for our defense acquisition regulation and procedure to go. It includes the CAIV concept application, IPT utilization, T&E method, cost or price based contract etc-all for the effective acquisition.

(A) Study on the Priority Selection for business development of the Defense Education and Training System Based on Virtual Reality (가상현실 기반 국방 교육훈련체계 사업화 우선순위 선정에 관한 연구)

  • Lee, Se-Ho;Han, Seung-Jo
    • Journal of Digital Convergence
    • /
    • v.20 no.3
    • /
    • pp.201-209
    • /
    • 2022
  • In order for the military to review the introduction of virtual reality technology into various education and training systems and fully utilize it, it is important to reflect the characteristics of the technology and education system and to accurately identify and selectively apply the characteristics of commercialization. In this study, the evaluation criteria were selected through the Analitic Hierarchy Process (AHP) method for factors to be considered when commercializing a virtual reality-based education and training system, and the priorities of the projects were determined. Based on previous studies, an initial AHP model was constructed and the relative importance of six factors, including reality, was analyzed as the level 1 evaluation criteria. Next, for Level 2, each evaluation criterion was evaluated to confirm the importance of each of the 11 tasks in the six evaluation criteria, and priorities were selected for each task. As a result of the analysis, level 1 showed that reality and ripple had higher importance than other factors. As a result of evaluating the final relative importance, the priority was shown in the order of ① flight training, ② disaster training, ③ shooting Training, and ④ driving a vehicle. Based on the relative priorities determined in Levels 1 and 2 of the model presented in this study, the importance of each project necessary for final decision-making of the research priorities for the defense virtual reality project was presented. It is expected that this study can be used as a reference material for prioritizing the commercialization of education and training systems in the defense sector.

A Research on RC3(RMF-CMMC Common Compliance) meta-model development in preparation for Defense Cybersecurity (국방 사이버보안을 위한 RMF-CMMC 공통규정준수 메타모델 개발방안 연구)

  • Jae-yoon Hwang;Hyuk-jin Kwon
    • Journal of Internet Computing and Services
    • /
    • v.25 no.1
    • /
    • pp.123-136
    • /
    • 2024
  • The U.S. Department of Defense, leading global cybersecurity policies, has two main cybersecurity frameworks: the Cybersecurity Maturity Model Certification (CMMC) for external defense industry certification, and the Risk Management Framework (RMF) for internal organizational security assessments. For Republic of Korea military, starting from 2026, the Korean version of RMF (K-RMF) will be fully implemented. Domestic defense industry companies participating in projects commissioned by the U.S. Department of Defense must obtain CMMC certification by October 2025. In this paper, a new standard compliance meta-model (R3C) development methodology that can simultaneously support CMMC and RMF security audit readiness tasks is introduced, along with the implementation results of a compliance solution based on the R3C meta-model. This research is based on practical experience with the U.S. Department of Defense's cybersecurity regulations gained during the joint project by the South Korean and U.S. defense ministries' joint chiefs of staff since 2022. The developed compliance solution functions are being utilized in joint South Korean-U.S. military exercises. The compliance solution developed through this research is expected to be available for sale in the private sector and is anticipated to be highly valuable for domestic defense industry companies that need immediate CMMC certification.

A Methodological Model for Effective RFID System Development (효과적인 RIFD시스템 구축을 위한 방법론적 모형 개발)

  • Youm, Se-Kyoung;Lee, Yong-Han;Kim, Hoon-Tae;Rhee, Jong-Tae;Cho, Sung-Ku
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.34 no.4
    • /
    • pp.433-444
    • /
    • 2008
  • With development of RFID technology, medicine and national defense as well as logistics and distribution industries have tried to adopt RFID system. Small projects as well as large national projects have planned to adopt the new technology. However, a lot of companies that have promoted a RFID-based project have confronted many problems due to a lack of information about demonstration projects and absence of systematic guideline. Therefore, it's urgent to develop a practical and useful guideline for companies that have considered to adopt the RFID system. In this paper, a practical framework to adopt RFID system is suggested by five phases : establishment of project plan, analysis of objectives, selection of equipments, development/installation, and operation/post management phases. Besides, a detail method by each stages is also given. A systematic RFID system adoption procedure has been defined through an analysis on demonstrated projects and interview with an expert and the adoption method by stage has been suggested. The purpose of this paper is to minimize the entry barriers by suggesting a practical RFID adoption procedure.

A Study on Application of Systems Engineering Technical Process to FEED in Plant construction Industry - focused on a case of Environmental Plant (플랜트 FEED 설계를 위한 시스템엔지니어링 기술프로세스 적용방안 연구 - 환경플랜트 사례를 중심으로)

  • Ki, Wan Wook;Kim, Jun Pil;Hong, Dae Geun;Suh, Suk-Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.2
    • /
    • pp.37-53
    • /
    • 2013
  • With rapid growth of the world plant market, an increasing attention is paid on the plant engineering. Up to present time, Korean plant engineering technology has been concerned with the down stream part of the plant engineering, so called EPC, considered as a lower value chain compared with the up stream, composed of FEED(Front End Engineering Design) and PMC(Project Management Consultancy). In other words, a key issue for Korean plant industry is how to catch up the FEED technology, currently occupied by the advanced countries. In this paper, we propose an SE(Systems Engineering) approach, conventionally applied for aerospace and defense industry, to the FEED for plant engineering. Specifically, we proposed a new SE process composed of: 1) SPA matrix for reverse systems engineering, and 2) PPA matrix for forward systems engineering. To illustrate the proposed method, a case study for an environmental plant is performed.

A Study on the Improvement Method of DT&E for Company Organized Weapon Systems Research and Development (무기체계 업체주관 연구개발 사업의 개발시험평가 개선방안 고찰)

  • Kim, Sungkyung;Kim, Chandong;HUR, Jangwook
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.18 no.6
    • /
    • pp.721-727
    • /
    • 2015
  • The improvement of the reliability of weapon systems and the reduction of the total life-cycle cost based on the improving of the DT&E system for Company Organized weapon systems research and development are urgently required. The major advanced countries operate test and evaluation centers for military (U.S.), manage a large scale organization of IPT personnel (England) or conduct management of DT&E through a third party organization (France). Based on a survey of experts, an improvement of the DT&E policy in terms of reliability and objectiveness is needed, and management through a third party national defense agency and civilian agency such as the Surion development case is required. In addition, although it appears that efficiency improves when management of DT&E is performed by national defence agencies rather than civilian agencies, it is necessary to proceed by selecting a civilian agency based on competition in the case that it is difficult to select a national defence agency.

Water Resources Planning for the 2S River Basin in Viet Nam

  • Ko, Ick Hwan;Choi, Byung-Man;Kim, Jeong-kon;Pi, Wan-Seop;Shin, Jae-Sung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.78-78
    • /
    • 2020
  • The Se San and Srepok river basins (2S) are the two major tributaries of the Mekong River, both of which originate in the territory of Viet Nam and flow to Cambodia to meet at Stung treng with the Sekong river (originating in Lao PDR) to form the 3S river basin before joining the Mekong mainstream. In the territory of Viet Nam, the 2S river basins are located in the Central Highlands including 5 provinces, arranged by geographical location from north to south namely Kon Tum, Gia Lai, Dak Lak, Dak Nong and Lam Dong. This is a region with a very important strategic position in terms of economy, politics and defense for the whole country with many potential advantages for economic development. However, the limited and vulnerable basin water resources are under the pressure of socio-economic development in line with increasing water demands for various sectors. In order to overcome the water management challenges, a long-term water resources planning has conducted to support the 2S River Basin Committee (RBC) in effective planning and operation as part of the WB Mekong-Integrated Water Resources Management (IWRM) Project. This paper introduces the outline and progress of the river basin planning using analytical DSS toolkits to analyze, evaluate and formulate the planning options.

  • PDF

A Methodology for Analyzing on the Correlation of Factors Affecting the Acquisition of Military Weapons Systems : Focused on Factor Analysis of Naval Ship Acquisition Delay Cases (국방무기체계 획득영향요인 상호관계 분석 : 함정획득지연 사례 및 요인 분석을 중심으로)

  • Hwang, Jeong-Oh;Oh, Hyun-Seung;Choi, Bong-Wan;Yim, Dong-Soon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.48-58
    • /
    • 2020
  • Naval weapons systems of the Republic of Korea are acquired through the Defense Planning Management System. Recently, acquisition of some naval ships have been delayed, and the causes of the delays have been recognized as inappropriate project management at the Execution Phase. However, we argue that the delay problem in naval ships acquisition should be approached, with due regard for the entire Defense Planning Management System. That is, We should try to investigate from Planning Phase to those of Programming, Budgeting and Execution Phases. Therefore, in this study, we investigated the actual cases of the delay in naval acquisition at all phases of the Defense Planning Management System. Based on the investigation, we tried to identify the naval ship Acquisition Delay Factors and find out the Weights of those factors. As the next step, we calculated the Influence Measures on the naval missions, including the Cost of Naval Capability Gap derived from the delays in acquisition of naval ships. As a final step, we calculated the Acquisition Delay Measures based on the interrelationship between the Acquisition Delay Factors and the Influence Measures. Then we evaluated and analyzed what the results stand for. Finally, we made suggestions for future improvement. The improvement suggestions we made for preventing delay in acquisition of naval ships in this study are as follows. First, we need a shift in perception. It is necessary to measure the Acquisition Delay Factors in acquiring naval ships and manage them from the Planning Phase. Second, resolution must be concerted efforts. All relevant agencies, not just a few, should work together to resolve the problems of acquisition delay. Third, analysis must be based on the accumulation of data. This allows the elaborating of naval ship Acquisition Delay Factors and Delay Measures. If this research method is applied to other military weapons systems in the future, we may be able to not just identify the Acquisition Delay Factors in acquisition of other military weapons systems, but also pursue improvement in those cases.